You are viewing the permanent link for the record currently in effect, published 2026-09-19.
Torrance building permits
VerifiedTorrance, California — as published 2026-09-19.
Verified 2026-09-19 · Source
Codes adopted
Permit types & fees
Building Permit
VerifiedTorrance went fully electronic in January 2026 and runs a numbered three-step process in which the first step is not the permit application at all - it is a separate clearance from another division, without which the application will not be accepted.
Verified 2026-09-19 · Source
Requirements
- PAPER ENDED ON A NAMED DATE: "Effective January 5, 2026, all plan reviews and permit submittals must be submitted electronically. Paper plans and physical submittals are no longer accepted."
- STEP 1 IS NOT THE PERMIT. "Before submitting a permit application, you must first obtain Zoning Clearance from the Planning or Environmental Division. Proof of Zoning Clearance is required with your permit application and helps avoid delays in the review process." Two divisions issue it, with separate contacts - Planning on (310) 618-5990 or PLNClearance@TorranceCA.Gov, Environmental on (310) 618-5929 or ENVClearance@TorranceCA.Gov.
- STEP 2 IS AN ACCOUNT: "To apply for permits online, you must first create an account through the Citizen Access Portal." The city asks you to read its Accela Citizen Access User Guide for Building Permits first, published as a 4MB PDF manual.
- STEP 3 SUBMITS THREE THINGS TOGETHER: "Once you receive Zoning Clearance, submit your permit application, zoning clearance documentation, and construction plans through the Citizen Access Portal."
- TRADES ARE NOT INCLUDED AND NEED THEIR OWN APPLICATIONS: "Separate permit applications and submittals are required for trade permits, including mechanical, electrical, and plumbing work."
Required documents
- Optional
- Optional
- Optional
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fee schedule | NOT PUBLISHED on the pages read for this record. | No fee schedule, valuation table or amount appeared on the Building and Safety Permits page or the inspection page. Show full citationHideNo fee schedule, valuation table or amount appeared on the Building and Safety Permits page or the inspection page. The city states that fees can be paid through the online permitting system, but publishes no figure on the pages read, so no amount and no fee basis is asserted here. |
Sources & verification
Verified against official sources. Last reviewed 2026-09-19.
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Torrance building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.