Skip to main content
PermitBase

Torrance building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Torrance, California.

Verified 2026-09-19 · Source

How to schedule

Inspections are requested through the building department below.

Address
Permit Center, 3031 Torrance Blvd., Torrance, CA 90503
Phone
(310) 618-5910 (Building and Safety); (310) 618-5901 (Interactive Voice Response inspection line); (310) 618-5990 (Planning Division clearance); (310) 618-5929 (Environmental Division clearance); (310) 328-5310 (City general)
Office hours
NOT PUBLISHED on the pages read for this record. The Permit Center address is given and the city offers an "Online Appointment - Book Your Appointment" route, but no counter opening times appeared on either the Building and Safety Permits page or the inspection page. Call (310) 618-5910 before travelling.

Published scheduling rules

  • THE INSPECTION LINE NEEDS A TOUCH-TONE PHONE, the permit number and a three-digit code. (Building Permit)

Inspection sequence

Applies to: Building Permit

  1. 1

    A 24/7 automated phone system, and it is the published route

    "In an ongoing commitment to improve customer service, the City of Torrance has an Interactive Voice Response (IVR) system for Scheduling and Canceling Inspections 24 hours a day, 7 days a week!" The line is (310) 618-5901.

  2. 2

    Three things before you dial

    "Before Calling, you will need: A touch-tone telephone; A site-specific Record (Permit) Number; A three-digit Inspection Code." The inspection codes are published as a list on the same page. Note the first item - the system is DTMF, so a phone that cannot send tones will not work.

  3. 3

    The menu, including two things that are not scheduling

    "Press [1] Schedule an Inspection; Press [2] Cancel an Inspection; Press [3] Obtain Inspection Results; Press [4] To hear Scheduled Inspection time frame; Press [5] Listen to Plan-Check Status; Press [0] Speak with an operator; Press [*] General Information." Options 3 and 5 make the line useful for checking status without scheduling anything.

  4. 4

    How the permit number is entered, and the confirmation number

    "Enter the Permit Type: for Building, press [1], or for Electrical, press [2]", then "Enter the seven-digit numeric portion of the Permit number. Ex. BLD25-00001 and press [#]. The system will confirm this permit by speaking back the site addresses (do not enter '-')." At the end "you will be issued a confirmation number", and the city recommends keeping a record of confirmation numbers against their requests.

  5. 5

    NOT READ FOR THIS RECORD: the inspection timeframe rules

    The inspection page carries a separate "Timeframe" tab alongside "Schedule or Cancel" and "Inspection Codes". Its content did not render when opened for this record, so no cut-off time, arrival window or next-day rule is recorded here - and none is inferred. Option [4] on the IVR reads back the scheduled timeframe for a booked inspection.

Sources & verification

Verified against official sources. Last reviewed 2026-09-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Torrance building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Torrance building permits

Get alerts for Torrance

We'll email you when Torrance's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.