Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-09-20.

Newport Beach building permits

Verified

Newport Beach, California — as published 2026-09-20.

Verified 2026-09-21 · Source

Codes adopted

NEWPORT BEACH ENUMERATES ITS ENTIRE TITLE 15 WITH CHAPTER NUMBERS AND NAMES THE ADOPTING ORDINANCE. The adoption is recorded verbatim as "Adopted: October 4, 2025 Effective: January 1, 2026" under Ordinance No. 2025-23. Two independent reads of the page, framed differently, returned the same ordinance number and the same two dates.THE 2025 CALIFORNIA SUITE, EACH IN ITS OWN CHAPTER: California Building Code 15.04; California Residential Code 15.05; California Electrical Code 15.06; California Mechanical Code 15.07; California Plumbing Code 15.08; California Green Building Standards Code 15.11; California Historical Building Code 15.13; California Existing Building Code 15.14; California Energy Code 15.17.TWO ADOPTED CODES ARE NOT CALIFORNIA EDITIONS AND ARE A YEAR OLDER THAN THE REST: the 2024 International Property Maintenance Code at Chapter 15.03 and the 2024 International Swimming Pool and Spa Code at Chapter 15.09. Anyone reasoning about a Newport Beach pool or a property-maintenance case from the 2025 California suite is reading the wrong book.TEN OF THE TWENTY-ONE CHAPTERS OF TITLE 15 ARE NEWPORT BEACH'S OWN, NOT MODEL CODE AT ALL: 15.02 Newport Beach Administrative Code; 15.10 Newport Beach Excavation and Grading Code; 15.12 Post-Disaster Safety Assessment Placards and Standard for Repair of Damaged Structures; 15.15 Newport Beach Report of Residential Building Records (RBR); 15.18 Solar Systems; 15.19 Electric Vehicle Charging Station; 15.32 Underground Utilities; 15.50 Newport Beach Flood Damage Prevention; 15.55 Methane Overlay Zone; 15.60 Newport Beach Construction Site Fencing and Screening.A METHANE OVERLAY ZONE IS A STANDING CHAPTER OF THE BUILDING TITLE, quoted from the codes page as "Methane Overlay Zone 15.55". It is a building-code chapter, not a planning overlay mentioned in passing, and it sits in Title 15 alongside the California Building Code itself. The chapter text was not read for this record - see the gotchas.Health and Safety Code 18938(b) provides that building standards in the California Building Standards Code apply to all occupancies throughout the state, so the 2025 California editions above are the floor everywhere in Newport Beach regardless of what any local chapter adds.

Permit types & fees

Building Permit

Verified

Newport Beach publishes review targets measured in hours for work done at the Permit Center, publishes nothing at all for a plan that gets submitted, and closes permit intake an hour before it closes the counter. Forty-seven percent of the city is in the coastal zone, which adds a separate permit on top.

Verified 2026-09-21 · Source

Requirements

  • THE PERMIT CENTER IS A JOINT COUNTER, NOT A BUILDING COUNTER. The team there "includes all Departments and Divisions from: Building, Fire, Planning, Public Works and Health." That is the point of the place - the clearances that other cities make you collect yourself are meant to be obtainable in one visit.
  • THE PUBLISHED REVIEW TARGETS ARE ABOUT COUNTER WORK AND ARE STATED AS A GOAL, NOT A COMMITMENT: "Our goal is for our team members to address quick permits at the counter, one hour reviews at workstation, or a 2 hour review by appointment." Three tiers, all measured in hours, all describing work done while you are in the building. None of them is a plan check turnaround.
  • COME BEFORE 4:30, NOT BEFORE 5:30. The counter is open 7:30 AM to 5:30 PM Monday through Thursday, but Permit Issuance and Plan Check Submittal run only 7:30 AM to 4:30 PM. On Friday the counter closes at 4:30 and intake closes at 3:30. Arriving inside counter hours is not the same as arriving in time to submit or to be issued.
  • FORTY-SEVEN PERCENT OF THE CITY NEEDS A SECOND PERMIT. "About forty-seven percent (47%) of the City's land area is in the coastal zone." A coastal development permit is a separate approval from the building permit, and the share of the city affected is close to half.
  • THE CITY, NOT THE COASTAL COMMISSION, ISSUES MOST COASTAL PERMITS NOW: "Certification of the City's LCP allows the City to issue these permits, in most instances." That is a material improvement over routing through the Commission's South Coast District office, but it is qualified - "in most instances" is the city's own wording, not a guarantee for your parcel.
  • A CITY-ISSUED COASTAL PERMIT CAN STILL BE APPEALED TO THE STATE. "So, a CDP approved by the City in an appeal area can be appealed to the Coastal Commission." The appeal areas are drawn geographically and the FAQ lists them verbatim as properties "Between the sea and the first public road paralleling the sea", "300 feet from a beach or of the mean high tide line, whichever is greater distance", "100 feet of streams and wetlands", and "300 feet of top of seaward face of coastal bluff". Note that the beach band is measured from whichever line is FARTHER, so it can extend past 300 feet from the sand. Holding a city approval does not by itself end the matter if your lot is in one of those bands.

Required documents

  • Optional
  • Optional
  • Optional

Fee schedule

Fee typeAmountNotes
Permit feesNOT READ for this record. A Fee Schedule and a Building Valuation Table are published, but neither document was opened and no amount is reproduced here.
WHICH SCHEDULE IS IN FORCE IS NOT OBVIOUS FROM THE PAGE. Show full citation

WHICH SCHEDULE IS IN FORCE IS NOT OBVIOUS FROM THE PAGE. Ten effective dates are listed. A schedule marked (Effective July 25, 2026) appears first in the list, while the CURRENT marker sits on the one marked (Effective July 1, 2025) - and July 25, 2026 had already passed by the date this record was verified. Two reads of the page, framed differently, returned the same ordering and the same placement of the marker. Confirm at the counter which schedule applies before relying on a figure from either.

Sources & verification

Verified against official sources. Last reviewed 2026-09-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Newport Beach building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /california/orange-county/newport-beach/as-of/2026-09-20/

Snapshot date: 2026-09-20

Commit: 4a95ae7