Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-09-19.

Victorville building permits

Verified

Victorville, California — as published 2026-09-19.

Verified 2026-09-19 · Source

Codes adopted

THE CITY DESCRIBES BOTH THE OBLIGATION AND THE ACT: "The City of Victorville is required to enforce the building codes as mandated by the California Building Standards Commission. The City has adopted by ordinance the following model codes as modified by the State of California".THE ADOPTED SET: 2025 California Building Code, Residential Code, Mechanical Code, Electrical Code, Plumbing Code, Green Standard Code, Energy Code, and Wildland Urban Interface Code.WHERE THE LOCAL MATERIAL LIVES: "Additional information pertaining to the Development Department can be found in Title 16 of the City's Municipal Code." Title 16 was NOT READ FOR THIS RECORD, so no specific local provision is quoted.Health & Safety Code 18938(b) provides that building standards in the California Building Standards Code "shall apply to all occupancies throughout the state and shall become effective 180 days after publication."

Permit types & fees

Building Permit

Verified

Victorville publishes the most usable set of local design and field values in this corpus - twelve of them, from snow load to the buried depth of a gas line - alongside a plainly numbered seven-step permit process. Applications and inspections both run through a Citizen Self Service Portal.

Verified 2026-09-19 · Source

Requirements

  • THE PROCESS IS PUBLISHED AS SEVEN NUMBERED STEPS: "Prepare plans for the job (according to current codes and standards); Apply for the proper permit for the job on the Self-Service Portal; Have the plans reviewed and approved by the Development Department; Pay the appropriate development fees; Await permit issuance; Construct the project according to the approved plans; Have the construction inspected and approved by the Development Department."
  • NOTE WHERE THE MONEY SITS IN THAT ORDER: fees are paid AFTER plan review and approval, not before it. Visalia, three hours north, requires plan check fees "before processing" - the same step in the opposite position, and worth checking rather than assuming.
  • APPLICATION ROUTES ARE SPLIT BY PROJECT CLASS: the city publishes separate online routes for Commercial, Residential, Planning Entitlements, and Streets & Right of Way.
  • CONSTRUCTION HOURS ARE A CODE PROVISION, NOT A COURTESY: "7:00am to 10:00pm (VMC 13.01 Noise Control)".

Required documents

  • Optional
  • Optional
  • Optional

Fee schedule

Fee typeAmountNotes
When fees fall dueAfter plan review and approval.Step four of the city's own seven-step process is "Pay the appropriate development fees", following "Have the plans reviewed and approved by the Development Department". The fee is not a precondition of review here.
Fee scheduleNOT TRANSCRIBED for this record.The city publishes a Fees & Forms section which was not opened here, so no schedule, amount or fee basis is asserted.

Sources & verification

Verified against official sources. Last reviewed 2026-09-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Victorville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /california/san-bernardino-county/victorville/as-of/2026-09-19/

Snapshot date: 2026-09-19

Commit: e583ad3

Reproducible from PermitBase’s version-controlled dataset, commit e583ad3.