You are viewing the permanent link for the record currently in effect, published 2026-09-20.
El Cajon building permits
VerifiedEl Cajon, California — as published 2026-09-20.
Verified 2026-09-20 · Source
Codes adopted
Permit types & fees
Building Permit
VerifiedEl Cajon runs everything through PACO, its Tyler-hosted portal, and publishes real plan check figures - three to four weeks for a first check, one to two for a recheck. Its inspection windows are labelled by a time they do not start at.
Verified 2026-09-20 · Source
Requirements
- PACO IS THE SUBMITTAL ROUTE: "The Project Assistance Center Online (PACO) is the method to submit for plan check", and "Submittals shall be in electronic format via PACO website."
- AN ACCOUNT COMES FIRST, AND THE LOGIN CHANGED ON A NAMED DATE: "In order to submit an online application you must first register an account with the Project Assistance Center Online, or PACO", under a "New PACO Log-In Procedure as of 4/15/2024".
- UPLOAD THE FORMS THE SCOPE DEMANDS: "Please complete and upload the permit application and any additional forms that may be required based on the complexity and scope of your project... Typical forms that may be required include the Certification of Easements, energy efficiency documentation, hazardous materials questionnaire, etc."
- OWNER-BUILDERS NEED THREE THINGS: "Owner/Building declaration form completed and signed; A permit application with job description; Identification as the property owner."
- CONTRACTORS NEED FOUR, INCLUDING A CITY BUSINESS LICENCE: "A permit application with project description; A workers' compensation certificate; Contractors State License information; A current City of El Cajon business license."
- TWO SCOPES CARRY AN EXTRA DOCUMENT: "Reroofs you will need a reroof application" and "New meters or meter upgrades will need documentation of approved location from SDG&E." The meter location is signed off by the utility, not the city.
- DO NOT COVER WORK BEFORE IT PASSES: "Do not cover any aspect of construction (underground, wall framing, etc.) until you have obtained a passing inspection."
Required documents
- Optional
- Optional
- Optional
- Optional
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit fees | NOT PUBLISHED as a schedule; quoted by telephone. | "The fee structure in use by the City is updated on a periodic basis. Show full citationHide"The fee structure in use by the City is updated on a periodic basis. For an estimate of fees you may call the general information line of Building Safety and get an estimate of the fee for your particular project." The city offers a spoken estimate rather than a published table, and does not state a revision cadence beyond "periodic". |
Sources & verification
Verified against official sources. Last reviewed 2026-09-20.
Applications & forms
Online permit portal
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the El Cajon building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.