Version history — Brighton, Colorado
This is PermitBase’s own verified record for Brighton, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Brighton’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-25Superseded
- 2026-08-13Superseded
- Brighton, Colorado — Sign Permit record added
- Brighton, Colorado — Fire Sprinkler and Fire Alarm System Permit record added
- Brighton, Colorado — Change of Occupancy / Change of Use Permit record added
- 2026-07-20Superseded
- Brighton, Colorado — Rooftop Solar Photovoltaic (PV) Permit fee record added: Statewide aggregate fee cap on active solar energy system installs ($500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284))
- Brighton, Colorado — Electric Vehicle Charging Station (EVCS/EVSE) Permit record added
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Brighton began