This is PermitBase’s published record for Federal Heights as of 2026-08-13. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Federal Heights building permits

Federal Heights, Colorado — as published 2026-08-13.

Reviewed 2026-07-06 · Source

Codes adopted

2021 International Building Code (IBC), amended — adopted by City Council via Ordinance 23-02 (March 7, 2023), effective April 15, 2023 based on permit application date2021 International Residential Code (IRC), amended — Ordinance 23-022021 International Fire Code (IFC), amended — Ordinance 23-022021 International Mechanical Code (IMC) — Ordinance 23-022021 International Plumbing Code (IPC), amended — Ordinance 23-022018 International Fuel Gas Code (IFGC), including appendices A, B and C — DRIFT FIX 2026-07-23: prior entry incorrectly said '2021 IFGC'; the actual text of Ordinance 23-02 §1(6) (verified directly against the ordinance PDF via Municode) and the current Municode codification (Sec. 10-16(6), Supp. 42, online content updated May 28, 2026) both read 'International Fuel Gas Code, 2018 Edition' — Federal Heights retained the 2018 IFGC alongside the 2018 IECC rather than elevating it to 2021 with the rest of the 2021-cycle codes in Ordinance 23-022021 International Existing Building Code (IEBC) — Ordinance 23-022021 International Property Maintenance Code (IPMC) — Ordinance 23-022021 International Swimming Pool and Spa Code (ISPSC) — Ordinance 23-022021 International Green Construction Code (IgCC) — Ordinance 23-022021 ICC Performance Code (ICCPC) — Ordinance 23-022021 NFPA 101 Life Safety Code — Ordinance 23-022018 International Energy Conservation Code (IECC), amended — City's Adopted Technical Codes page states explicitly this edition 'will remain adopted as the 2018 edition' rather than upgrading to 2021 alongside the other 2021-cycle codes in Ordinance 23-02Prior code cycle for reference: 2018 ICC Codes were adopted January 19, 2021 via Ordinance 21-01, effective February 1, 2021 (superseded by Ordinance 23-02 for all codes except IECC)NEC (National Electrical Code) edition not separately confirmed on the City's own pages: electrical permitting and inspection in Federal Heights is administered entirely by the State of Colorado (DORA State Electrical Board), not adopted/enforced locally as a city code — see localAmendments for detail

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family homes and similar new residential construction in Federal Heights ('New Building' category on the City's Building Permit Application). Reviewed under the 2021 IRC/IBC as adopted by Ordinance 23-02 (effective April 15, 2023), with the 2018 IECC retained for energy compliance. Issued by the City Building Department.

Verified 2026-07-06 · Source

Requirements

  • Plans must comply with the 2021 IRC/IBC as adopted and locally amended per Ordinance 23-02, and the 2018 IECC for energy compliance
  • Classification of Work on the application must mark 'Residential' and category '1. New Building'
  • All contractors must complete a City of Federal Heights Contractor Registration; subcontractors must be recorded via a Subcontractor License Form ($14.00 fee each)
  • Plans requiring a design professional's stamp must meet the City's published Architect/Professional Engineer Seal Specifications
  • A zoning-district-specific Plot Plan (R-1, R-4, or R-5 template) is required as part of submittal
  • Multi-agency sign-off required on the application: Building, Public Works, Fire Dept., Storm Water, Engineering, and Zoning

Required documents

  • RequiredBuilding Permit Application (City of Federal Heights, 2022 fillable PDF)Available in English and Spanish; classification of work marked 'Residential' / '1. New Building'
  • RequiredPlot Plan (zoning-district-specific template: R-1, R-4, or R-5)Corner or interior lot template matching the parcel's zoning district
  • RequiredConstruction Plans (Architect/Engineer-sealed where required)Must meet the City's published Seal Specifications for design-professional stamps

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$23.50City of Federal Heights Building Fees schedule
Building Permit Fee — valuation $501.00 to $2,000.00$23.50 for the first $500 plus $3.05 for each additional $100 or fraction thereof
Building Permit Fee — valuation $2,001.00 to $25,000.00$69.25 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $25,001.00 to $50,000.00$391.75 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $50,001.00 to $100,000.00$643.75 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $100,001.00 to $500,000.00$993.75 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $500,001.00 to $1,000,000.00$3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof
Building Permit Fee — valuation $1,000,001.00 and up$5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000 or fraction thereof
Plan Review Fee65% of Building Permit Fee
Building Use Tax4% of estimated materials cost (materials estimated at 50% of total valuation; effective ~2% of total valuation)Exempt for religious organizations, charitable entities, and the City itself
Subcontractor Fee$14.00 per subcontractor

Residential Addition / Alteration / Tenant Finish Permit

Verified

Covers additions, alterations, and interior remodels ('Repair or Replace' and 'Alteration or Tenant Finish' categories) to existing residential structures in Federal Heights. Reviewed under the 2021 IRC as adopted by Ordinance 23-02. The City publishes dedicated Building Guides for common sub-scopes: Residential Addition, Detached Garages, Basement Finish, and Pole Barns.

Verified 2026-07-06 · Source

Requirements

  • Classification of Work marked 'Residential' with category '2. Addition', '3. Repair or Replace', or '4. Alteration or Tenant Finish' as applicable
  • Additions follow the City's Residential Addition Building Guide; detached garages, basement finishes, and pole barns each have their own dedicated Building Guide
  • All contractors must complete City Contractor Registration; subcontractors recorded via Subcontractor License Form
  • Plans requiring a design professional's stamp must meet the City's Architect/Professional Engineer Seal Specifications

Required documents

  • RequiredBuilding Permit Application — Addition/Repair/Alteration scopeCity of Federal Heights fillable PDF, English or Spanish
  • RequiredApplicable Building Guide (Residential Addition, Detached Garage, Basement Finish, or Pole Barn)Project-specific scope and submittal guidance published by the Building Department
  • OptionalPlot Plan (zoning-district template)Required for additions that change the building footprint

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule as new construction)$23.50 minimum, scaling per the valuation tiers in the City's Building Fees schedule
Plan Review Fee65% of Building Permit Fee
Building Use Tax4% of estimated materials cost (~2% of total valuation)

Electrical Permit (State-Administered)

Verified

Electrical work in Federal Heights is NOT permitted or inspected by the City. Per the City's own Building Department page, 'The State of Colorado Department of Regulatory Agencies (DORA) administers all electrical permits and inspections' for Federal Heights — this is the Colorado State Electrical Board, reached via the DORA/DPO Electrical and Plumbing Permits portal.

Verified 2026-07-06 · Source

Requirements

  • Electrical permits must be obtained directly from the Colorado State Electrical Board (DORA/Division of Professions and Occupations), not from the City of Federal Heights
  • Contractors must hold a current Colorado Electrical license; the state permit and inspection process governs, per statewide licensure statutes (CRS Title 12, Article 23)
  • The City of Federal Heights performs no separate local electrical permitting, plan review, or inspection function for this trade

Required documents

  • RequiredColorado State Electrical Permit ApplicationFiled directly with DORA's Division of Professions and Occupations (Electrical and Plumbing Permits portal), not with the City of Federal Heights

Fee schedule

Fee typeAmountNotes
State Electrical Permit FeeSet by the Colorado State Electrical Board per CRS 12-23-117(3); not collected by or set locally by the City of Federal HeightsThe City's own Building Fees schedule contains no electrical line item — electrical is fully state-administered for this jurisdiction, unlike many home-rule Colorado municipalities that run their own program with a local surcharge

Plumbing Permit

Verified

Required for installation, alteration, or repair of plumbing systems in Federal Heights, including water heaters ('Plumbing (i.e. Water Heaters)' category on the City's Building Permit Application). Issued locally by the City under the 2021 IPC as adopted by Ordinance 23-02, but subject to contemporaneous State Plumbing Board (DORA) license verification at application and inspection.

Verified 2026-07-06 · Source

Requirements

  • Classification of Work category '7. Plumbing (i.e. Water Heaters)' on the City's Building Permit Application
  • Governed by the 2021 IPC as adopted and amended by the City via Ordinance 23-02
  • A Plumbing Contractor (PC) and a full-time current State Licensed Master Plumber (MP) must be listed on the permit application; the City verifies both directly against the Colorado DORA licensing database
  • Inspectors may fail an inspection at their discretion, pending license verification, and report violations to the State Plumbing Board, per the City's Contemporaneous Review of Plumbing Work policy

Required documents

  • RequiredBuilding Permit Application — Plumbing scopeCity of Federal Heights fillable PDF; Plumbing Contractor and Master Plumber license numbers required

Fee schedule

Fee typeAmountNotes
Plumbing Permit Fee (same valuation-based schedule as Building)$23.50 minimum, scaling per the valuation tiers in the City's Building Fees schedulePlan review fee is waived for water heaters per the City's Building Fees page
Plan Review Fee65% of Permit FeeWaived for water heater replacements specifically, per the City's published fee-waiver list
Building Use Tax4% of estimated materials cost (~2% of total valuation)

Mechanical / HVAC Permit

Verified

Required for heating, cooling, and ventilation equipment installation or replacement in Federal Heights ('Mechanical (i.e. Furnace/AC Unit)' category on the Building Permit Application). Governed by the 2021 IMC and the 2018 IFGC as adopted by Ordinance 23-02 (DRIFT FIX 2026-07-23: the IFGC was previously mis-stated as '2021' in this file; verified directly against the Ordinance 23-02 text and the current Municode codification, both of which read 'International Fuel Gas Code, 2018 Edition' — the IFGC was retained at 2018 alongside the IECC, not elevated to 2021 with the IMC).

Verified 2026-07-23 · Source

Requirements

  • Classification of Work category '8. Mechanical (i.e. Furnace/AC Unit)' on the City's Building Permit Application
  • Governed by the 2021 IMC and the 2018 IFGC as adopted by the City
  • All contractors must complete City Contractor Registration

Required documents

  • RequiredBuilding Permit Application — Mechanical scopeCity of Federal Heights fillable PDF

Fee schedule

Fee typeAmountNotes
Mechanical Permit Fee (same valuation-based schedule as Building)$23.50 minimum, scaling per the valuation tiers in the City's Building Fees schedulePlan review fee waived for furnace and air conditioning replacements per the City's Building Fees page
Plan Review Fee65% of Permit FeeWaived for furnace/AC replacements specifically
Building Use Tax4% of estimated materials cost (~2% of total valuation)

Re-Roof Permit

Verified

Required for re-roofing work in Federal Heights ('Re-roof' category on the Building Permit Application). The City publishes a dedicated Roofing Guide. Governed by the 2021 IRC/IBC as adopted by Ordinance 23-02; plan review fee is waived per the City's Building Fees page.

Verified 2026-07-06 · Source

Requirements

  • Classification of Work category '9. Re-roof' on the City's Building Permit Application
  • Follow the City's published Roofing Guide (English/Spanish) for material and installation requirements
  • Contractor Registration required for the roofing contractor

Required documents

  • RequiredBuilding Permit Application — Re-roof scopeCity of Federal Heights fillable PDF
  • OptionalRoofing Guide complianceCity-published guide covering material and installation standards

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as other building work)$23.50 minimum, scaling per the valuation tiers in the City's Building Fees scheduleNo separate flat re-roof fee is published; billed under the general valuation-based schedule
Plan Review FeeWaived for roofing per the City's Building Fees page ('roofing, and similar projects not requiring plan review')
Building Use Tax4% of estimated materials cost (~2% of total valuation)

Solar Permit

Verified

Required for solar installations in Federal Heights ('Solar' category, item 10, on the Building Permit Application). The electrical interconnection portion of any solar installation is administered by the State of Colorado DORA Electrical Board, not the City, consistent with the jurisdiction's general electrical-permitting posture.

Verified 2026-07-20 · Source

Requirements

  • Classification of Work category '10. Solar' on the City's Building Permit Application, for the structural/roof-mounting portion issued by the City
  • Electrical interconnection and PV wiring must be separately permitted through the Colorado State Electrical Board (DORA), since the City does not administer any electrical permits
  • Contractor Registration required for the installing contractor

Required documents

  • RequiredBuilding Permit Application — Solar scopeCity of Federal Heights fillable PDF, for structural/mounting review
  • RequiredColorado State Electrical Permit (DORA)Separate state permit required for the electrical/PV interconnection scope

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, structural/mounting scope)$23.50 minimum, scaling per the valuation tiers in the City's Building Fees scheduleCovers the City-administered structural/roof-mounting portion only
Plan Review Fee65% of Permit FeeNot explicitly listed among the City's plan-review fee waivers (water heaters/furnaces/AC/roofing); treated as standard unless the Building Department indicates otherwise at application
State Electrical Permit Fee (DORA)Set by the Colorado State Electrical Board, not the CityCovers the electrical/PV interconnection portion, filed separately with DORA
Statewide aggregate fee cap on active solar energy system installs$500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284)
Statutory cap on the aggregate of ALL governmental fees/charges related to installing an active solar energy system under 2 megawatts DC — the statute's own text applies to 'the state or any agency,… Show full citation

Statutory cap on the aggregate of ALL governmental fees/charges related to installing an active solar energy system under 2 megawatts DC — the statute's own text applies to 'the state or any agency, institution, authority, or political subdivision of the state,' which reaches both the City's building/plan-review fees AND the State DORA electrical fee combined, not just one or the other. Repealed effective December 31, 2029 unless renewed.

Demolition Permit (Wrecking and Moving)

Verified

Required for demolition ('wrecking') or structure relocation ('moving') in Federal Heights ('Demolition' category, item 6, on the Building Permit Application). Fees are set by a dedicated Wrecking and Moving Fee Schedule distinct from the general valuation-based Building Permit Fee table. All demolitions additionally require an asbestos-related Demolition Notification.

Verified 2026-07-06 · Source

Requirements

  • Classification of Work category '6. Demolition' on the City's Building Permit Application
  • An Asbestos Demolition Notification packet must be completed and submitted for all demolitions, per the City's published Asbestos Demolition Information document, consistent with Colorado APCD Regulation No. 8 statewide asbestos requirements
  • Fees are billed under the dedicated Wrecking and Moving Fee Schedule (by square footage), not the general valuation-based Building Permit Fee table

Required documents

  • RequiredBuilding Permit Application — Demolition scopeCity of Federal Heights fillable PDF
  • RequiredAsbestos Demolition Notification / Permit ApplicationRequired for all demolitions per Colorado asbestos abatement/notification regulations

Fee schedule

Fee typeAmountNotes
Wrecking Fee — under 2,500 sq ft$55.00 maximumCity of Federal Heights Wrecking and Moving Fee Schedule
Wrecking Fee — over 2,500 sq ft$110.00 maximum
Moving Fee — under 500 sq ft$30.00 maximum
Moving Fee — over 500 sq ft$75.00 for the first 500 sq ft plus $30.00 for each additional 500 sq ft or fraction thereof

Commercial Alteration / Tenant Finish Permit

Verified

Covers commercial tenant improvements and alterations ('Alteration or Tenant Finish' category on the Building Permit Application, Commercial classification). Reviewed under the 2021 IBC as adopted by Ordinance 23-02. Plan review fees are collected for projects with valuation greater than $25,000 at time of application submission.

Verified 2026-07-06 · Source

Requirements

  • Classification of Work marked 'Commercial' with category '4. Alteration or Tenant Finish' (or '2. Addition' / '3. Repair or Replace' as applicable to scope)
  • Governed by the 2021 IBC as adopted and amended by the City via Ordinance 23-02
  • Plans requiring a design professional's stamp must meet the City's Architect/Professional Engineer Seal Specifications
  • Plan review fees for projects valued over $25,000 are collected at time of permit application submission
  • Fire Dept., Storm Water, Engineering, and Zoning sign-off blocks apply on the same multi-agency Building Permit Application form

Required documents

  • RequiredBuilding Permit Application — Commercial Alteration/Tenant Finish scopeCity of Federal Heights fillable PDF
  • RequiredConstruction Plans (Architect/Engineer-sealed)Must meet the City's published Seal Specifications

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as residential)$23.50 minimum, scaling per the valuation tiers in the City's Building Fees schedule
Plan Review Fee65% of Permit Fee; collected at application submission for projects valued over $25,000
Building Use Tax4% of estimated materials cost (~2% of total valuation)

Deck / Patio Cover / Carport Permit

Verified

Covers uncovered decks/porches and patio covers/carports ('Patio Cover/Carport' category, item 5, on the Building Permit Application, plus uncovered decks under 'New Building' or 'Addition' as applicable). The City publishes dedicated Building Guides for each: Uncovered Decks and Porches (standard and manufactured-home variants), Patio Covers and Carports (standard and MFG-home variants), and Enclosing Patios.

Verified 2026-07-06 · Source

Requirements

  • Classification of Work category '5. Patio Cover/Carport' for covered structures; uncovered decks/porches follow the Uncovered Decks and Porches Building Guide
  • Manufactured-home lots use the MFG-home-specific variant of each guide (Uncovered Decks and Porches for MFG Homes; Patio Covers and Carports for MFG Homes)
  • A zoning-district Plot Plan (R-1, R-4, or R-5 template) showing the structure's location relative to setbacks is required

Required documents

  • RequiredBuilding Permit Application — Patio Cover/Carport or Addition scopeCity of Federal Heights fillable PDF
  • RequiredApplicable Building Guide (Uncovered Decks and Porches, Patio Covers and Carports, or Enclosing Patios)Standard or manufactured-home variant matching the project
  • RequiredPlot Plan (zoning-district template)Showing setbacks and structure placement

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based)$23.50 minimum, scaling per the valuation tiers in the City's Building Fees schedule
Plan Review Fee65% of Permit FeeNot listed among the City's explicit plan-review fee waivers (water heaters/furnaces/AC/roofing); confirm treatment for smaller deck/patio projects directly with the Building Department
Building Use Tax4% of estimated materials cost (~2% of total valuation)

EV Charger / Electric Vehicle Charging Station Permit (State-Administered)

Verified

Federal Heights has no dedicated EV charger permit — like all electrical work, an EV charging station (Level 1/2 EVSE) circuit is NOT permitted or inspected by the City. Per the City's own Building Department page, 'The State of Colorado Department of Regulatory Agencies (DORA) administers all electrical permits and inspections' for Federal Heights, exactly as documented in the electrical-permit entry. The City's standard Building Permit Application does not list electrical/EV charging as a category at all.

Verified 2026-07-23 · Source

Requirements

  • Electrical permits for EV charger/EVSE circuits must be obtained directly from the Colorado State Electrical Board (DORA/Division of Professions and Occupations), not from the City of Federal Heights
  • Contractors must hold a current Colorado Electrical license; the state permit and inspection process governs, per statewide licensure statutes (CRS Title 12, Article 23)
  • The City of Federal Heights performs no separate local electrical permitting, plan review, or inspection function for EV charger installation, same as for any other electrical scope
  • If the EV charger installation is paired with a solar/battery project, the roof/racking portion still goes through the City (Category 10 on the standard Building Permit Application) while the electrical interconnection portion goes to the State — see rooftop-solar-pv-permit and electrical-permit entries
  • DISCOVERED 2026-07-23: separately from the electrical permit itself, the City now regulates WHERE and under what zoning conditions an EVCS may be sited, per Ordinance No. 25-17 (adopted 12/16/2025), codified as Chapter 70, Article XVII, Electric Vehicle Charging Stations, of the Federal Heights Municipal Code (enacted per Colorado HB24-1173). Level 1/2 EVCS (accessory or primary use) are permitted-by-right or require a Conditional Use Permit depending on zone district (R-1 through R-5, C-1, I-1) and are exempt from Site Development Plan and Landscape Plan review, subject only to Article XVII's own design standards plus the electrical/building permits described above; a NEW Level 3 (DC fast-charging) EVCS on a site without an existing Site Development Plan triggers an administrative SDP review, and adding Level 3 EVCS to an existing SDP site requires an administrative minor-SDP-modification submittal to the City (Sec. 70-470) — this is a real City-administered zoning approval step distinct from the DORA electrical permit.

Required documents

  • RequiredColorado State Electrical Permit ApplicationFiled directly with DORA's Division of Professions and Occupations (Electrical and Plumbing Permits portal), not with the City of Federal Heights

Fee schedule

Fee typeAmountNotes
State Electrical Permit Fee (applies to EV charger circuit; no distinct EV line)Set by the Colorado State Electrical Board per CRS 12-23-117(3); not collected by or set locally by the City of Federal HeightsThe City's own Building Fees schedule contains no electrical or EV-charger line item — electrical (including EV charging circuits) is fully state-administered for this jurisdiction

Sign Permit (Permanent and Temporary)

Verified

Required to construct, erect, or maintain any permanent sign in Federal Heights, per Municipal Code Chapter 70 (Zoning), Article XI (Sign Code), Sec. 70-603(c)(1). The permit is issued by the City as a building permit through the Building Department, with dimensional standards set by zone district in Sec. 70-604; the City Planner (303-412-3530) fields sign-code-specific questions. Illuminated/electrical signs additionally require a separate State of Colorado electrical permit, consistent with Federal Heights' general electrical-permitting posture (fully state-administered by DORA). Certain temporary sign types (e.g. cold air balloons) require a separate Temporary Use Permit under Sec. 70-606.

Verified 2026-08-13 · Source

Requirements

  • It is unlawful to construct, erect, or maintain a permanent sign without first obtaining a building permit from the City (Sec. 70-603(c)(1))
  • The sign permit application must include, unless waived by the city manager: a scaled elevation of the proposed sign showing its message; sign area, color scheme, and construction materials; a plot plan showing the sign's location (plus building outline for wall-mounted signs); and, for replacements, a photo of the existing sign with its dimensions alongside the new sign's area (Sec. 70-603(c)(2))
  • Illuminated or electrical signs require a separate electrical permit from the State of Colorado (DORA) before the City will approve the building permit; proof of the state permit and compliance documentation must be submitted to the City's building department first (Sec. 70-603(b)) — consistent with Federal Heights' fully state-administered electrical posture documented elsewhere in this file
  • Dimensional standards (maximum number, area, and height) vary by sign type (wall, ground/pole/monument, multi-tenant, drive-through) and by zone district under Sec. 70-604 — e.g., in the C-1/I-1/P-1 districts wall-sign area scales from 30 to 100 sq ft by building-face frontage, pole signs up to 100 sq ft/20 ft height, and monument signs up to 130 sq ft/10 ft height, both scaled by building footprint; residential districts are limited to small home-occupation signage (4 sq ft, 5 ft height)
  • Electronic message displays are allowed only in the C-1, I-1, commercial PUD, and P-1 zone districts, limited to static/dissolve/fade transitions with a minimum 3-second display time per message (Sec. 70-605)
  • Temporary signs (cold air balloons, construction-project identification, fence signs, flag poles/banners, grand-opening/store-closing banners, portable/sandwich-board signs, extra-large C-1 lawn signs, etc.) are governed by Sec. 70-606, each with its own duration, size, quantity, and setback limits by zone district; cold-air balloons and extra-large C-1 lawn signs specifically require a separate Temporary Use Permit
  • No building permit fee is charged for a change of copy on a sign with an identical-size panel, or for repainting, cleaning, or routine maintenance/repair of a previously-permitted sign whose structure is not altered (Sec. 70-603(c)(4)-(5))
  • A permanent sign may not be moved to another location or structurally/textually altered without a new city-issued permit (Sec. 70-603(m))
  • Signs may not be placed in the City's right-of-way and will be removed if found in violation of the sign code

Required documents

  • RequiredSign Permit Application (filed as a Building Permit Application, sign scope)City of Federal Heights Building Department; requires scaled elevation, sign area/color/materials, and plot plan per Sec. 70-603(c)(2)
  • RequiredPlot Plan and Scaled Elevation DrawingShows sign location on the property (plus building outline for wall signs) and the proposed sign's design/message
  • OptionalProof of Colorado State Electrical Permit (DORA)Required before City building-permit approval for any illuminated or electrical sign, per Sec. 70-603(b)
  • OptionalPhoto and Dimensions of Existing SignRequired for sign replacements, alongside the proposed replacement sign's area, per Sec. 70-603(c)(2)d
  • OptionalTemporary Use Permit ApplicationRequired specifically for cold air balloon signs and Extra-Large C-1 lawn signs under Sec. 70-606; City of Federal Heights fillable form

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, general schedule — no distinct sign-specific fee line item is published)$23.50 minimum, scaling per the valuation tiers in the City's Building Fees scheduleThe City's 2024 Fee Schedule (Res. No. 24-03) has no separate 'sign permit' line item under Community Development — sign permits are billed under the same general valuation-based Building Permit Fee table used for other building work
Plan Review Fee65% of Building Permit Fee
Temporary Use Permit$100.00Res. No. 24-03, City of Federal Heights 2024 Fee Schedule, Community Development Department section; required for cold air balloon signs and Extra-Large C-1 lawn signs per Sec. 70-606
Building Use Tax4% of estimated materials cost (~2% of total valuation)

Fire Sprinkler and Fire Alarm System Permit

Verified

Required for installation of a new automatic fire sprinkler system, installation or modification of a fire alarm system, and related fire-suppression equipment (commercial-cooking suppression, spray booth suppression, building emergency communication systems) within Federal Heights. Unlike several peer Denver-metro Colorado suburbs that rely on an independent special fire protection district (e.g. Edgewater/West Metro Fire, Broomfield), Federal Heights maintains its OWN municipal Fire Department — confirmed directly on the City's own site (fedheights.org/fire): 'Federal Heights has its own Fire Department,' with a dedicated Fire Prevention Division that performs fire-system plan review, permitting, and inspection in-house. The Fire Department's own Fire Prevention page states: 'All plans for new construction and remodeling are reviewed by the Fire Department prior to the issuance of construction permits,' explicitly covering 'Fire sprinkler systems, fire alarm systems, fire hydrants, access for fire apparatus, proper exits, permitted occupancy loads.' North Metro Fire Rescue District maintains an automatic/mutual-aid agreement with Federal Heights Fire Department for emergency response, but does not perform Federal Heights' fire-system plan review or permitting.

Verified 2026-08-13 · Source

Requirements

  • Governed by the 2021 International Fire Code (IFC) as adopted by the City via Ordinance 23-02 (this file's own verified codesAdopted entry) — NOTE: the Fire Department's own 'Fire Prevention' subpage separately states the department has 'adopted the 2015 International Fire Code,' which conflicts with the ordinance-verified 2021 IFC edition already established elsewhere in this file; treated here as a stale/unrevised webpage reference rather than the governing text, consistent with this file's practice of trusting the primary ordinance over a summary page that may lag a code update (see the analogous NEC-edition discrepancy pattern documented for peer Colorado jurisdictions in this corpus)
  • Fire sprinkler systems (referencing NFPA 13/13D/13R by standard cross-reference in the adopted IFC) and fire alarm systems (referencing NFPA 72) are reviewed by the Fire Department's Fire Prevention Division prior to issuance of the related construction permit
  • New automatic fire sprinkler system installations are billed by square footage; modification of an existing fire alarm system is a separate, flat-fee line item — both are itemized in the City's 2024 Fee Schedule (Resolution No. 24-03) under 'Fire Alarm Systems' and 'Fire Permits - General'
  • Fire Dept. sign-off is one of six required agency blocks (Building, Public Works, Fire Dept., Storm Water, Engineering, Zoning) printed on the City's standard multi-agency Building Permit Application — fire protection systems installed as part of new construction or tenant finish are reviewed by the Fire Department concurrently with the general building permit application, rather than through a wholly separate permitting track (a materially different posture from Edgewater's model, where an independent fire district runs its own separate permit/fee/inspection process)
  • All businesses in the City are separately subject to an annual Fire Safety Inspection ('All businesses within the City are inspected by the fire department annually to ensure compliance with the code') distinct from system-installation plan review — initial inspection and first re-inspection are free; subsequent re-inspections are $75.00/hour (minimum one hour), due within 30 days
  • Operating a fire protection system, or conducting fire-permit-regulated operations, without first obtaining the required permit or prior approval is billed at double the original permit fee, per the 2024 Fee Schedule

Required documents

  • RequiredFire Sprinkler/Alarm Permit ApplicationSubmitted to the Federal Heights Fire Department Fire Prevention Division (fireinspections@fedheights.org, 303-427-7209)
  • RequiredBuilding Permit Application (concurrent submittal referencing fire-protection scope)City of Federal Heights fillable PDF; carries the Fire Dept. sign-off block among the standard multi-agency approvals

Fee schedule

Fee typeAmountNotes
Installation of a New Automatic Fire Sprinkler System$0.20 per sq ftCity of Federal Heights 2024 Fee Schedule (Resolution No. 24-03), 'Fire Permits - General' section
Modification of Existing Fire Alarm System$75.00Resolution No. 24-03; no separate line item for installing a brand-new fire alarm system was found in the published fee schedule — confirm the applicable fee directly with the Fire Prevention Division for a new-install scope
Plan Review (Fire Only)$100.00/hrResolution No. 24-03, 'Fire Inspections' section
Fire Inspection — Initial and 1st Inspection$0.00 (free)Resolution No. 24-03
Fire Inspection — Reinspect, more than 2 per event$75.00Resolution No. 24-03; matches the City's Business Inspections page language ('Subsequent re-inspections: $75.00 per hour for a minimum of one hour and is due within 30 days')
Auto Fire Suppression System — Commercial Cooking$100.00Resolution No. 24-03
Auto Fire Suppression System — Spray Booths, Rooms; Mixing Rooms$150.00Resolution No. 24-03
Building Emergency Communication System$50.00Resolution No. 24-03
Nuisance Alarm — 3rd, 4th, or 5th in a Calendar Year$75.00Resolution No. 24-03, 'Fire Alarm Systems' section
Nuisance Alarm — 6th in a Calendar Year$150.00Resolution No. 24-03
Operations Without a Permit or Prior ApprovalDouble the original permit feeResolution No. 24-03, 'Fire Permits - General' section

Change of Use / Change of Occupancy Permit

Verified

Federal Heights does not publish a standalone 'change of use' or 'change of occupancy' application distinct from its general Commercial Alteration/Tenant Finish permit. A change of occupancy or use in an existing commercial building is filed through the standard Building Permit Application's 'Alteration or Tenant Finish' category — confirmed directly against the City's own December 2025 Monthly Building Permit Report (govoffice3.com), which internally codes this permit type 'TENFI' and lists a real issued permit (No. 20250346, issued 12/17/2025, 8868 Federal Blvd, valuation $15,163.31) described exactly as 'CHANGE OF OCCUPANCY/TI UPDATES TO...'. The technical review basis is the 2021 International Existing Building Code (IEBC) as locally adopted via Ordinance 23-02 (this file's own verified codesAdopted entry); IEBC Chapter 10 governs Change of Occupancy classification requirements. Unlike some peer Denver-metro Colorado jurisdictions (e.g. Edgewater), Federal Heights does not charge for or require a general Business License for a new occupant — businesses instead register for a no-fee City of Federal Heights Sales Tax License through the Finance Department.

Verified 2026-08-13 · Source

Requirements

  • Technically governed by the 2021 IEBC as locally adopted via Ordinance 23-02; IEBC Chapter 10 (Change of Occupancy) sets the classification/compliance requirements that apply when a building or tenant space's occupancy or use changes
  • Filed under the same 'Alteration or Tenant Finish' category (Commercial classification) on the standard Building Permit Application used for the Commercial Alteration/Tenant Finish Permit in this file — the City's own December 2025 Monthly Building Permit Report confirms this by internally labeling a real change-of-occupancy permit 'TENFI' (the same type code used for ordinary tenant-finish buildouts) rather than a distinct permit type
  • The same multi-agency sign-off (Building, Public Works, Fire Dept., Storm Water, Engineering, Zoning) printed on the standard Building Permit Application applies
  • No general City of Federal Heights Business License is required to operate a business — new occupants instead register for a no-fee Sales Tax License with the City's Finance Department (303-412-3540, salestax@fedheights.org); this is a materially different posture from peer jurisdictions (e.g. Edgewater) that charge a paid Business License tied to the approved occupancy/use
  • No dedicated 'change of use'/'change of occupancy' checklist, standalone application form, or guidance document (of the kind Edgewater publishes as 'Commercial New Business Tenant Information') was found published by the City as of the last verification — checked the Building page, Building Guides page, Business page, and Economic Development page directly; confirm directly with the Building Department (303-412-3527) whether a specific zero-construction occupancy change still requires a permit, since that exact scenario is not independently documented for Federal Heights

Required documents

  • RequiredBuilding Permit Application — Commercial, Alteration or Tenant Finish scopeSame form/category as this file's commercial-tenant-improvement entry; the City's own permit records internally code this as 'TENFI' for both ordinary tenant finish and change-of-occupancy work
  • RequiredSales Tax License ApplicationCity of Federal Heights Finance Department; no fee. Required to operate the business in the space, but separate from the building permit process
  • OptionalConstruction Plans (Architect/Engineer-sealed where required)Required where the change of occupancy is accompanied by alteration or tenant-finish construction work; must meet the City's published Seal Specifications

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same schedule as Commercial Alteration/Tenant Finish)$23.50 minimum, scaling per the valuation tiers in the City's Building Fees scheduleThe City's own December 2025 permit report shows a real change-of-occupancy/TI permit valued at $15,163.31 (Permit No. 20250346); no separate valuation-independent 'change of use' fee exists
Plan Review Fee65% of Permit Fee; collected at application submission for projects valued over $25,000Same rule as this file's commercial-tenant-improvement entry
Building Use Tax4% of estimated materials cost (~2% of total valuation)Applies only where construction/tenant-improvement work with a materials valuation accompanies the change of occupancy
Sales Tax LicenseNo feeCity of Federal Heights Finance Department; confirmed directly — 'There is no fee for a Sales Tax License'

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Federal Heights building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-23)Later version (2026-08-25) →View current record →All versions →

Permalink: /colorado/adams-county/federal-heights/as-of/2026-08-13/

Snapshot date: 2026-08-13

Commit: 144ab1c

Reproducible from PermitBase’s version-controlled dataset, commit 144ab1c.