Skip to main content
PermitBase

Version history — Federal Heights, Colorado

This is PermitBase’s own verified record for Federal Heights, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Federal Heights’s actual law was at that time.

Permanent link to today’s record

/colorado/adams-county/federal-heights/as-of/2026-08-25/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-25Current record
  • 2026-08-13Superseded
    • Federal Heights, Colorado — Sign Permit (Permanent and Temporary) record added
    • Federal Heights, Colorado — Fire Sprinkler and Fire Alarm System Permit record added
    • Federal Heights, Colorado — Change of Use / Change of Occupancy Permit record added
  • 2026-07-23Superseded
    • Federal Heights, Colorado — adopted-codes record updated
  • 2026-07-20Superseded
    • Federal Heights, Colorado — Solar Permit fee record added: Statewide aggregate fee cap on active solar energy system installs ($500.00 maximum (residential) / $1,000.00 maximum (commercial), per Colorado C.R.S. 24-48.5-113 (enacted by HB21-1284))
    • Federal Heights, Colorado — EV Charger / Electric Vehicle Charging Station Permit (State-Administered) record added
  • 2026-07-07Superseded
  • 2026-07-06Initial record — coverage of Federal Heights began