Basalt building permits
VerifiedBasalt, Colorado — as published 2026-07-07.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction, Single-Family/Duplex/Townhome)
VerifiedRequired for new construction of single-family, duplex, and townhome structures anywhere within Basalt town limits, whether the parcel sits in the Eagle County or Pitkin County portion of town. Reviewed under the 2021 IRC/IBC as locally amended by the Town of Basalt Building Department, using the Town's own 'Building Permit Application Checklist — Single Family, Duplex, and Townhomes' document.
Verified 2026-07-06 · Source
Requirements
- Reviewed under the 2021 IRC/IBC as locally amended by Town of Basalt Chapter 18 (amendments effective July 20, 2023)
- Town of Basalt Permit Application must include total gross and net square footage, and a Parcel Number is required on the application
- Plan Submittal Fee of 50% of the calculated plan review fee is due (non-refundable) at submittal
- Asbestos test required for all remodels disturbing greater than 160 SF, 260 LF, or a volume equivalent to a 55-gallon drum
- Sustainable Building Regulations Checklist and Cover Page required (Column A completed by contractor); SBR compliance path depends on conditioned floor area — HERS Projected Rating required for New Construction 2,000 SF and greater; REScheck (Climate Zone 6B, minimum 10% exceeding compliance) or optional HERS rating for New Construction under 2,000 SF
- SBR training certification (5 hours within the 18 months preceding submittal) required of the contractor/owner-builder if the project is subject to SBR requirements
- Water and Sanitation Approval required, and varies by neighborhood: Eagle County Mid Valley (sewer + water) = Mid Valley Metropolitan District; Old Town/Southside/Elk Run/Roaring Fork Club (sewer) = Basalt Sanitation District with an original tap permit or signed exemption form; same areas (water) = Town of Basalt itself
- HOA Approval / Willits Design Review Board Approval required if applicable to the parcel
- All structural sheets must be stamped/signed by a Colorado State Licensed Engineer; foundation design per a soils report (or open-hole type accepted)
- Verification of current Town of Basalt Contractor Licensing required, including current SBR certification (5 hours within 18 months) if the project is subject to SBR requirements
- Wildfire construction standards apply to all land within the Town per Ordinance 16
- Public Works Street Cut / Right-of-Way Permit required if applicable
Required documents
- RequiredTown of Basalt Permit ApplicationMust include gross and net square footage and Parcel Number
- RequiredBuilding Permit Application Checklist — Single Family, Duplex, and TownhomesCovers new construction, addition, and alteration scopes for IRC-built structures
- RequiredSustainable Building Regulations Checklist and Cover PageColumn A completed by architect or contractor; determines applicable IECC/SBR compliance path
- OptionalAsbestos Test ReportRequired for remodels disturbing more than 160 SF, 260 LF, or a 55-gallon-drum equivalent volume
- RequiredWater and Sanitation Approval DocumentationFrom Mid Valley Metropolitan District, Basalt Sanitation District, or the Town of Basalt depending on parcel location
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1.00 to $500.00 | $21.00 | Town of Basalt Building Permit Fee Schedule |
| Building Permit Fee — valuation $501.00 to $2,000.00 | $21.00 for the first $500.00 plus $2.75 for each additional $100.00, or fraction thereof, to and including $2,000.00 | — |
| Building Permit Fee — valuation $2,000.01 to $25,000.00 | $62.25 for the first $2,000.00 plus $4.50 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 | — |
| Building Permit Fee — valuation $25,000.01 to $50,000.00 | $165.75 for the first $25,000.00 plus $5.50 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 | — |
| Building Permit Fee — valuation $50,000.01 to $100,000.00 | $303.25 for the first $50,000.00 plus $6.25 for each additional $1,000.00, or fraction thereof, to and including $100,000.00 | — |
| Building Permit Fee — valuation $100,000.01 to $500,000.00 | $615.75 for the first $100,000.00 plus $7.00 for each additional $1,000.00, or fraction thereof, to and including $500,000.00 | — |
| Building Permit Fee — valuation $500,000.01 to $1,000,000.00 | $3,415.75 for the first $500,000.00 plus $8.00 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 | — |
| Building Permit Fee — valuation $1,000,000.01 and up | $7,415.75 for the first $1,000,000.00 plus $9.00 for each additional $1,000.00, or fraction thereof | — |
| Plan Submittal Fee | 50% of the calculated plan review fee, due at submittal | Non-refundable, per the Town's Building Permit Application Checklist |
| Building valuation basis | Set using the current ICC Building Valuation Data with a Town of Basalt regional modifier of 1.5 applied as the minimum valuation | Locally amended IBC Sec. 109.3, per the Town's 2021 code-change comparison document |
Residential Addition / Alteration-Remodel Permit
VerifiedRequired for additions and alterations/remodels to existing single-family, duplex, and townhome structures in Basalt, using the same 'Single Family, Duplex, and Townhomes' IRC checklist as new construction, with items marked N/A where not applicable to the smaller scope.
Verified 2026-07-06 · Source
Requirements
- Reviewed under the 2021 IRC/IBC as locally amended; the Town's checklist explicitly covers 'New Construction, Addition, Alteration' with a note that 'not all items listed will be applicable' for a remodel or addition
- Asbestos test required for remodels disturbing greater than 160 SF, 260 LF, or a volume equivalent to a 55-gallon drum
- Level 3 Remodels trigger a Home Energy Assessment and Baseline Blower Door Test under the Sustainable Building Regulations; Additions greater than 500 SF require Electric-Ready items and Solar incorporated into drawings per Part 5.0 of the SBR Ordinance; Level 3 Remodels over 750 SF require the full combined SBR package
- Plan Submittal Fee of 50% of the calculated plan review fee due (non-refundable) at submittal
- Water and Sanitation Approval required per the applicable provider for the parcel's neighborhood
- Verification of current Town of Basalt Contractor Licensing, including SBR certification currency if the project is subject to SBR requirements
Required documents
- RequiredBuilding Permit Application Checklist — Single Family, Duplex, and TownhomesAddition and Alteration items marked applicable per project scope; N/A for non-applicable items
- RequiredSustainable Building Regulations Checklist and Cover PageColumn A completed; Level 3 Remodel / Addition SF thresholds determine applicable energy documentation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule as new construction) | $21.00 minimum, scaling per the valuation tiers in the Town of Basalt Building Permit Fee Schedule | — |
| Plan Submittal Fee | 50% of the calculated plan review fee, due at submittal, non-refundable | — |
Electrical Permit
VerifiedRequired for installation, alteration, or repair of electrical systems anywhere in Basalt (both the Eagle County and Pitkin County portions of town). Unlike building, mechanical, and plumbing work, electrical permitting and inspection in Basalt is performed entirely by the State of Colorado Electrical Board (Division of Professions and Occupations), NOT the Town of Basalt Building Department.
Verified 2026-07-06 · Source
Requirements
- Permitted and inspected by the State of Colorado Electrical Board, not the Town of Basalt Building Department — confirmed directly on the Town's own Building Permit Application form
- Governed by the 2023 NEC as referenced on the Town's Building Department code-adoption summary
- Applied for through the Colorado Division of Professions and Occupations (DPO) Online Permitting System; the DPO encourages online purchase since permits are processed immediately upon payment through that system
- For solar/PV installations, DC and AC wiring approval is likewise routed through the Colorado State Electrical Board per the Town's Photovoltaic Solar System Application Guidelines
- Electrical contractors must hold current State of Colorado electrical licensure per DORA Electrical Board requirements
Required documents
- RequiredColorado DPO Electrical Permit ApplicationFiled directly with the State of Colorado Division of Professions and Occupations, not the Town of Basalt
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State of Colorado Electrical Permit Fee | Set by the Colorado Division of Professions and Occupations (DPO) Electrical Board fee schedule, not a Town of Basalt fee | This session did not independently re-verify the current DPO statewide electrical fee table as part of this Basalt-specific file; the fee is NOT part of the Town of Basalt's own Building Permit Fee Schedule |
EV Charger / EVSE Installation Permit
VerifiedBasalt has no separate Town-issued EV charger/EVSE permit or fee. Because ALL electrical work in Basalt (both the Eagle County and Pitkin County portions of town) is permitted and inspected by the State of Colorado Electrical Board rather than the Town Building Department, installing a home or commercial EV charging circuit is filed as a standard electrical permit through the Colorado Division of Professions and Occupations (DPO), the same carve-out that applies to all other electrical work in Basalt.
Verified 2026-07-20 · Source
Requirements
- EV charger/EVSE circuit installation is electrical work, and per the Town of Basalt's own Building Permit Application, ALL electrical work in Basalt is permitted and inspected by the State of Colorado Electrical Board (Division of Professions and Occupations), not the Town Building Department — no distinct Town-level 'EV charger permit' exists
- Applied for through the Colorado DPO Online Permitting System, governed by the 2023 NEC (including NEC Article 625, Electric Vehicle Power Transfer System) as referenced on the Town's code-adoption summary
- Colorado HB24-1173 (2024) established streamlined EV-charging-system permitting requirements, but only for counties with population 20,000+ and municipalities with population 10,000+; Basalt's population (~4,000-5,000) is below that municipal threshold, so the Town is not mandated to adopt HB24-1173's expedited local review procedures — electrical permitting for EV chargers in Basalt continues to run through the State DPO Electrical Board carve-out described above
- Electrical contractors must hold current State of Colorado electrical licensure per DORA Electrical Board requirements
- A separate Town of Basalt building permit may still apply to any non-electrical structural/site work associated with a charging installation (e.g., a new equipment pad or accessory structure), reviewed under the Town's standard building permit process
Required documents
- RequiredColorado DPO Electrical Permit ApplicationFiled directly with the State of Colorado Division of Professions and Occupations, not the Town of Basalt; no separate EV-specific application form is published by either the Town or the State
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State of Colorado Electrical Permit Fee | Set by the Colorado DPO Electrical Board fee schedule, not a Town of Basalt fee; no distinct EV/EVSE fee line was found published by the State or the Town | This session did not independently re-verify the current DPO statewide electrical fee table; the fee is NOT part of the Town of Basalt's own Building Permit Fee Schedule |
Plumbing Permit
VerifiedRequired for installation, alteration, or repair of plumbing systems in Basalt, issued directly by the Town of Basalt Building Department (unlike electrical, which is routed through the State of Colorado). Governed by the International Plumbing Code as adopted at the State of Colorado level and applied by the Town.
Verified 2026-07-06 · Source
Requirements
- Issued directly by the Town of Basalt Building Department, per the Town's own Plumbing Permit Application form and the Building Permit Application's notice that 'permits for plumbing, heating, ventilating and air conditioning are available through this office'
- Application requires job address, legal description (lot/block/subdivision), owner, contractor with license number, and a fixture/item count (total plumbing fixtures, water piping/treating, water heater/vent, lawn sprinkler system, backflow protective devices by size, building sewer, sand/grease interceptor, waste pretreatment interceptor, drainage/vent piping repair by fixture, gas piping by number of outlets)
- Water and Sanitation Approval required per the applicable provider for the parcel (Mid Valley Metropolitan District, Basalt Sanitation District, or Town of Basalt depending on neighborhood)
Required documents
- RequiredTown of Basalt Plumbing Permit ApplicationLists fixture/item counts by type; contractor license number required
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee (same valuation-based schedule as Building Permit) | $21.00 minimum, scaling per the valuation tiers in the Town of Basalt Building Permit Fee Schedule | The Town's fee schedule PDF does not publish a separate flat per-fixture plumbing fee table distinct from the general valuation-based Building Permit Fee Schedule |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, ventilation, and gas appliance installation or replacement in Basalt, issued directly by the Town of Basalt Building Department. Governed by the International Mechanical Code and International Fuel Gas Code as adopted.
Verified 2026-07-06 · Source
Requirements
- Issued directly by the Town of Basalt Building Department, per the Town's own Mechanical Permit Application and the Building Permit Application's notice that 'permits for plumbing, heating, ventilating and air conditioning are available through this office'
- Application requires job address, legal description, owner, contractor, and an equipment count by type: furnace/forced air heat (MBTU), boiler/hydronic heat (MBTU), modify existing heat system, ventilation fan, range hood (CFM), clothes dryer vent, gas fireplace (make/model), air conditioning units (tons), evaporative coolers, air handling unit (CFM), refrigeration units
- An ACCA-approved Manual J calculation and Manual S report (equipment specs) for heating/cooling equipment sizing is required for new construction/additions per the IRC Building Permit Application Checklist
- Mandatory mechanical ventilation rate: CFM = (0.01 x conditioned floor area) + [7.5 x (number of bedrooms + 1)], per the Town's checklist
- Gas fireplace additions/relocations/changes require a completed REMP spreadsheet fireplace tab (per the Building Document/Checklist references)
Required documents
- RequiredTown of Basalt Mechanical Permit ApplicationLists equipment type/count; Class of Work (New/Addition/Alteration/Repair) specified
- OptionalManual J / Manual S CalculationsRequired for new construction and additions to size heating/cooling equipment
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee (same valuation-based schedule as Building Permit) | $21.00 minimum, scaling per the valuation tiers in the Town of Basalt Building Permit Fee Schedule | No separate flat per-unit mechanical fee table is published distinct from the general valuation-based schedule |
Roofing Permit (Re-Roof)
VerifiedRequired for re-roofing work in Basalt. Reviewed under the Town's adopted 2021 IBC/IRC roof-assembly provisions as locally amended; this session could not locate a standalone Basalt-specific re-roof application checklist distinct from the general Building Permit Application, so re-roof scopes are treated as filed under the Town's general Building Permit process.
Verified 2026-07-06 · Source
Requirements
- Filed as a Building Permit Application with Class of Work marked 'Alteration' or 'Repair', per the Town's general Building Permit Application form (no separate standalone re-roof form was located on the Building Department page, the Permits page, or the Forms/Licenses/Permits index in this session)
- Ground snow load design criterion of 55 psf and 100% ice barrier underlayment requirement apply per the Town's Local Structural Design Parameters / IRC Table R301.2(1)
- Roof covering and siding specification, plus roof slope/pitch, are required plan items per the Town's IRC Building Permit Application Checklist for projects that include roof work as part of a larger scope
- Asbestos screening applies if disturbing more than 160 SF, 260 LF, or a 55-gallon-drum equivalent volume of existing roofing material
Required documents
- RequiredTown of Basalt Building Permit ApplicationClass of Work marked as Alteration or Repair for a stand-alone re-roof
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule as general building permits) | $21.00 minimum, scaling per the valuation tiers in the Town of Basalt Building Permit Fee Schedule | No separate flat re-roof fee is published; billed under the general valuation-based Building Permit Fee schedule, consistent with the Town's general permit-fee mechanics |
Solar Photovoltaic (PV) System Permit
VerifiedRequired for installation of photovoltaic solar systems in Basalt. Uniquely among Basalt's permit types, this one requires BOTH a Town of Basalt Building Department PV permit application AND separate approval from the Colorado State Electrical Board (for DC/AC wiring) AND the Roaring Fork Fire Authority, per the Town's own Photovoltaic Solar System Application Guidelines.
Verified 2026-07-06 · Source
Requirements
- DC-side and AC-side wiring must be approved by the Colorado State Electrical Board
- Electrical Permit Application filed via the portal link on the Town of Basalt Building page, but approved/issued/finalized by the Colorado State Electrical Board (not the Town)
- Roaring Fork Fire Authority Permit Application also required, filed via a portal link on the Town of Basalt Building page, approved/issued/finalized by the Roaring Fork Fire Authority
- Town of Basalt Building PV Permit Application requires, at time of application for plan review: (1) one-line diagrams detailing wire sizing, circuit voltage, voltage drop, grounding, and fusing; (2) manufacturer's specifications and installation documents for module, array, combiner box (if applicable), inverter, mounting hardware, batteries (if applicable), disconnect, and all other PV-associated equipment; (3) drawings detailing panel azimuth, zenith alignment toward the sun, equipment elevations, and a site plan; (4) a Basalt PV Generation Calculator Sheet, or (5) a Basalt REMP Calculation Sheet for REMP/CREMP fee calculations on new construction and/or exterior energy use fees per the Sustainable Building Regulations
Required documents
- RequiredTown of Basalt Building PV Permit Application
- RequiredOne-Line DiagramWire sizing, circuit voltage, voltage drop, grounding, fusing
- RequiredBasalt PV Generation Calculator Sheet or Basalt REMP Calculation Sheet
- RequiredColorado State Electrical Board Electrical Permit ApplicationSeparate from the Town's own PV permit; approved/issued/finalized by the State
- RequiredRoaring Fork Fire Authority Permit ApplicationSeparate from both the Town and State applications; approved/issued/finalized by the Roaring Fork Fire Authority
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town of Basalt Building PV Permit Fee | Computed per the Town's general valuation-based Building Permit Fee Schedule | No PV-specific flat fee is published distinct from the general valuation schedule |
| State of Colorado Electrical Permit Fee (DC/AC wiring) | Set by the Colorado DPO Electrical Board, separate from any Town of Basalt fee | — |
Fence Permit
VerifiedRequired for construction of fences, hedges, and walls in Basalt, per the Town's own Fence Requirements guide. Retaining walls over 4 feet require a Colorado-licensed structural engineer's design under the Town's locally amended building code.
Verified 2026-07-06 · Source
Requirements
- At least two complete documents required at application: (1) the completed Fence Requirements guide with construction type indicated, and (2) a site plan showing project dimensions and its relationship to existing property lines and structures
- A Building Permit Application must also be filed
- No fence, hedge, or wall may extend beyond or across a property line without the joint agreement of the abutting property owner; the property owner is responsible for locating all property lines
- No fence, hedge, or wall may be placed nearer than 12 inches from a public sidewalk
- No barbed wire, sharp-pointed, or electrically charged fencing is permitted, except in the Industrial (IN) zone, where up to 3 strands of barbed wire may be attached atop a minimum 6-foot-high fence for security purposes
- Fences within the required front yard setback may not exceed 4 feet in height; on corner lots, obstructions over 30 inches within the sight triangle at the adjacent intersection are prohibited except for trees limbed to 7 feet and open wire fencing that obscures vision no more than 10%
- Retaining walls greater than 4 feet in height must be designed by a Colorado-licensed structural engineer, per locally amended IBC Sec. R105.1.6/1807
Required documents
- RequiredFence Requirements Guide (completed)Filled-out guide indicating construction type, per the Town's 'How to Use This Guide' instructions
- RequiredSite PlanShowing project dimensions and relationship to existing property lines and structures
- RequiredTown of Basalt Building Permit Application
- OptionalStructural Engineer DesignRequired only for retaining walls exceeding 4 feet in height
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule as general building permits) | $21.00 minimum, scaling per the valuation tiers in the Town of Basalt Building Permit Fee Schedule | No separate flat fence-permit fee is published; billed under the general valuation-based schedule |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Basalt building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.