Codes adopted

2021 IBC (International Building Code), adopted by Ordinance No. 3/2025 amending Chapter 18 of the Carbondale Municipal Code, effective 7-1-2025, per the Town's Building Department page (carbondalegov.org/departments/building/).2021 IRC (International Residential Code), effective 7-1-2025, per the same ordinance.2021 IPC (International Plumbing Code), effective 7-1-2025.2021 IMC (International Mechanical Code), effective 7-1-2025.2021 IECC (International Energy Conservation Code), effective 7-1-2025.2021 IEBC (International Existing Building Code), effective 7-1-2025.2021 IFGC (International Fuel Gas Code), effective 7-1-2025.2021 ISPSC (International Swimming Pool and Spa Code), effective 7-1-2025.The most current electrical code adopted by the State of Colorado (Carbondale does not maintain its own separately-numbered local electrical code amendment; electrical permitting and inspection in Carbondale is handled by the Colorado State Electrical Board, not the Town — see the 'electrical-permit' entry below).2021 IFC (International Fire Code) and the 2025 Colorado Wildfire Resiliency Code (rendered 'CWFC' on the Town's own Building page, elsewhere labeled 'CWRC' and cross-referenced to Municipal Code Article 14) — both became effective 7-1-2026 per the Town's Building Department page, which as of this file's verification date is already in effect (the page's own text is still phrased as 'WILL BE EFFECTIVE 7-1-2026', but that date has now passed).

Permit types & fees

New Single-Family Dwelling, Duplex, or Townhouse Building Permit

Verified

Required for new single-family residence, duplex, or townhouse building construction in the Town of Carbondale, regulated under the Town-adopted 2021 IRC and 2021 IBC (Ordinance No. 3/2025, effective 7-1-2025). Building Permit fees are valuation-based per the Town's Appendix A fee bracket table, plus a 65% plan review fee.

Verified 2026-07-19 · Source

Requirements

  • New single-family dwelling, duplex, or townhouse construction within Town of Carbondale limits
  • Compliance with the Town-adopted 2021 IRC/IBC and IECC (Tier-classification blower-door and duct-leakage requirements apply)
  • Site plan review is not required for a single-family residence but is required for most other development types
  • Shading Analysis, Impervious Surface Calculations, and a Homeowner Agreement for Permitting (if applicable) as part of the submittal packet

Required documents

  • RequiredBuilding Permit ApplicationTown of Carbondale Building Department's own application form.
  • RequiredBuilding Permit ChecklistTown-published submittal checklist for new single-family/duplex construction.
  • RequiredImpervious Surface Calculations TableTown-provided Excel spreadsheet for calculating impervious surface coverage.
  • OptionalShading AnalysisRequired per Municipal Code Section 5.12, per the Town's document center.
  • OptionalHomeowner Agreement For PermittingRequired if the homeowner (rather than a licensed contractor) is pulling the permit.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — $1.00 to $500.00 valuation$27.50Carbondale Municipal Code Appendix A, Fee Schedule, Building Department Fees table (Supp. No. 19).
Building Permit Fee — $501.00 to $2,000.00 valuation$27.50 for the first $500.00 plus $3.60 for each additional $100.00 or fraction thereofAppendix A, Building Department Fees table.
Building Permit Fee — $2,001.00 to $25,000.00 valuation$80.25 for the first $2,000.00 plus $16.30 for each additional $1,000.00 or fraction thereofAppendix A, Building Department Fees table.
Building Permit Fee — $25,001.00 to $50,000.00 valuation$456.75 for the first $25,000.00 plus $11.75 for each additional $1,000.00 or fraction thereofAppendix A, Building Department Fees table.
Building Permit Fee — $50,001.00 to $100,000.00 valuation$745.50 for the first $50,000.00 plus $8.15 for each additional $1,000.00 or fraction thereofAppendix A, Building Department Fees table.
Building Permit Fee — $100,001.00 to $500,000.00 valuation$1,150.00 for the first $100,000.00 plus $6.55 for each additional $1,000.00 or fraction thereofAppendix A, Building Department Fees table.
Building Permit Fee — $500,001.00 to $1,000,000.00 valuation$3,738.00 for the first $500,000.00 plus $5.55 for each additional $1,000.00 or fraction thereofAppendix A, Building Department Fees table.
Building Permit Fee — $1,000,001.00 and up valuation$6,480.00 for the first $1,000,000.00 plus $4.30 for each additional $1,000.00 or fraction thereofAppendix A, Building Department Fees table.
Plan Review Fee65% of the Building Permit FeeAppendix A, Fee Schedule — 'Each application shall include an additional plan review fee equal to 65% of Building Permit Fee.'
Town of Carbondale Use TaxDeclared construction material value x 3.5%Appendix A, Fee Schedule, item 1, per Municipal Code Section 18-1-120.

Residential Addition Building Permit

Verified

Required for additions to existing single-family, duplex, or townhouse structures in Carbondale. Uses the same valuation-based Building Permit fee table as new residential construction, plus Planning Department review (unlike a straight remodel).

Verified 2026-07-19 · Source

Requirements

  • Addition to an existing residential structure within Town limits
  • Planning Department approval prior to Building Department review, per the Town's document center ('Residential Addition — After Planning Approval')
  • Impervious Surface Calculations Table and Addition Permit Submittal Guide and Checklist

Required documents

  • RequiredBuilding Permit ApplicationTown of Carbondale Building Department's own application form.
  • RequiredAddition Permit Submittal Guide and ChecklistTown-published guide for addition submittals.
  • RequiredImpervious Surface Calculations TableTown-provided spreadsheet.
  • OptionalRadon - Soils Gas Control (Residential and Commercial)Town-published radon mitigation reference document.

Fee schedule

Fee typeAmountNotes
Building Permit FeePer the same valuation-based bracket table as new residential construction (see residential-building-permit)Appendix A, Building Department Fees table.
Plan Review Fee65% of the Building Permit FeeAppendix A, Fee Schedule.
Town of Carbondale Use TaxDeclared construction material value x 3.5%Appendix A, Fee Schedule, item 1.

Residential Remodel Building Permit

Verified

Required for interior/exterior remodels of existing single-family, duplex, or townhouse structures in Carbondale that do not add floor area. Skips Planning Department review (N/A) but still requires Administrative and Building Department review.

Verified 2026-07-19 · Source

Requirements

  • Remodel of an existing residential structure within Town limits, not expanding the building footprint/floor area
  • Homeowner Agreement For Permitting (if the homeowner, not a licensed contractor, is pulling the permit)

Required documents

  • RequiredBuilding Permit ApplicationTown of Carbondale Building Department's own application form.
  • OptionalHomeowner Agreement For PermittingRequired if applicable.
  • OptionalAsbestos Abatement Notification & Permit Application FormRequired if the remodel disturbs asbestos-containing materials.

Fee schedule

Fee typeAmountNotes
Building Permit FeePer the same valuation-based bracket table as new residential construction (see residential-building-permit)Appendix A, Building Department Fees table.
Plan Review Fee65% of the Building Permit FeeAppendix A, Fee Schedule.
Town of Carbondale Use TaxDeclared construction material value x 3.5%Appendix A, Fee Schedule, item 1.

New Commercial Building Permit

Verified

Required for new commercial building construction in Carbondale, regulated under the Town-adopted 2021 IBC. Carries the longest published Building Department review window of any Carbondale permit type.

Verified 2026-07-19 · Source

Requirements

  • New commercial building construction within Town limits
  • Site plan review required (all development except a single-family residence requires site plan review; some PUDs may be exempt)
  • Compliance with the Town-adopted 2021 IBC/IECC commercial provisions

Required documents

  • RequiredBuilding Permit ApplicationTown of Carbondale Building Department's own application form.

Fee schedule

Fee typeAmountNotes
Building Permit FeePer the same valuation-based bracket table as residential construction (see residential-building-permit)Appendix A, Building Department Fees table — the same table applies to both residential and commercial valuations.
Plan Review Fee65% of the Building Permit FeeAppendix A, Fee Schedule.
Town of Carbondale Use TaxDeclared construction material value x 3.5%Appendix A, Fee Schedule, item 1.

Commercial Remodel / Tenant Finish Permit

Verified

Required for commercial remodels and tenant-finish build-outs in Carbondale.

Verified 2026-07-19 · Source

Requirements

  • Commercial remodel or tenant finish work within Town limits
  • Restaurants must obtain Garfield County Public Health plan approval before submitting

Required documents

  • RequiredBuilding Permit ApplicationTown of Carbondale Building Department's own application form.
  • OptionalRadon - Soils Gas Control (Residential and Commercial)Town-published reference document.
  • OptionalAsbestos Abatement Notification & Permit Application FormRequired if the remodel disturbs asbestos-containing materials.

Fee schedule

Fee typeAmountNotes
Building Permit FeePer the same valuation-based bracket table as residential construction (see residential-building-permit)Appendix A, Building Department Fees table.
Plan Review Fee65% of the Building Permit FeeAppendix A, Fee Schedule.
Town of Carbondale Use TaxDeclared construction material value x 3.5%Appendix A, Fee Schedule, item 1.

Commercial Addition Permit

Verified

Required for additions to existing commercial buildings in Carbondale.

Verified 2026-07-19 · Source

Requirements

  • Addition to an existing commercial structure within Town limits
  • Site plan review generally required

Required documents

  • RequiredBuilding Permit ApplicationTown of Carbondale Building Department's own application form.

Fee schedule

Fee typeAmountNotes
Building Permit FeePer the same valuation-based bracket table as residential construction (see residential-building-permit)Appendix A, Building Department Fees table.
Plan Review Fee65% of the Building Permit FeeAppendix A, Fee Schedule.
Town of Carbondale Use TaxDeclared construction material value x 3.5%Appendix A, Fee Schedule, item 1.

Mechanical Permit

Verified

Required for HVAC system installation/replacement and fireplace installation in Carbondale, per Appendix A Table 4 (Mechanical Permit Fees). All new/replacement units require heating and cooling load calculations with the submittal.

Verified 2026-07-19 · Source

Requirements

  • New or replacement HVAC/mechanical equipment, ductwork, vent/flue piping, or fireplace installation within Town limits
  • Heating & cooling load calculations required with submittal for all replacement and new units

Required documents

  • RequiredMechanical Permit ApplicationTown of Carbondale Building Department's own application form.
  • OptionalResidential Heating and Cooling Equipment Replacement GuideTown-published guide.
  • OptionalHomeowner Agreement For PermittingRequired if applicable.

Fee schedule

Fee typeAmountNotes
Application Fee$75.00Appendix A, Table 4 Mechanical Permit Fees.
New dwelling unit or commercial unit — complete HVAC system$200.00Appendix A, Table 4.
New dwelling unit or commercial unit — fireplace$50.00 eachAppendix A, Table 4.
Replacement or addition of each appliance (not new construction)$50.00 eachAppendix A, Table 4.
Replacement or addition of each duct system or vent/flue piping (not new construction)$25.00 eachAppendix A, Table 4.
Gas piping — up to and including 5 outlets$25.00Appendix A, Table 4, 'Other Inspections and Fees'.
Gas piping — each outlet in excess of 5$5.00Appendix A, Table 4.
Additional plan review (changes/revisions to previously approved plans, minimum 1 hour)$85.00 per hourAppendix A, Table 4.
Re-inspection — 1st notice$100.00Appendix A, Table 4.
Re-inspection — work still incomplete after 1st reinspection$250.00Appendix A, Table 4.
Town of Carbondale Use TaxDeclared construction material value x 3.5%Appendix A, Table 4.

Plumbing Permit

Verified

Required for plumbing and fuel gas system installation/replacement in Carbondale, per Appendix A Table 5 (Plumbing Permit Fees). Single-family, duplex, and townhouse units are limited to 2 exterior hose bibs per dwelling unit.

Verified 2026-07-19 · Source

Requirements

  • New or replacement plumbing/fuel gas fixtures, valves, drain/vent piping, or water distribution lines within Town limits
  • Single Family Dwellings, Duplex Units and Townhouse Units limited to only 2 exterior hose bibs per dwelling unit; additional hose bibs or garage plumbing fixtures trigger additional Water/Wastewater impact fees

Required documents

  • RequiredPlumbing Permit Application - ResidentialTown of Carbondale Building Department's own application form.
  • RequiredPlumbing Permit Application - Commercial New & RemodelTown of Carbondale Building Department's own commercial application form.
  • OptionalPlumbing-Procedure-for-Contemporaneous-ReviewsTown-published procedure document.
  • OptionalHomeowner Agreement For PermittingRequired if applicable.

Fee schedule

Fee typeAmountNotes
Application Fee$75.00Appendix A, Table 5 Plumbing Permit Fees.
New dwelling unit or commercial unit — complete plumbing and fuel gas system$200.00Appendix A, Table 5.
Replacement valves or addition of each fixture (not new construction)$25.00 eachAppendix A, Table 5.
Replacement or addition of drain/vent piping or water distribution line per fixture (not new construction)$25.00 eachAppendix A, Table 5.
Gas piping — up to and including 5 outlets (not new construction)$25.00Appendix A, Table 5.
Gas piping — each outlet in excess of 5 (not new construction)$5.00Appendix A, Table 5.
Additional plan review (minimum 1 hour)$85.00 per hourAppendix A, Table 5.
Re-inspection — 1st notice$100.00Appendix A, Table 5.
Re-inspection — work still incomplete after 1st reinspection$250.00Appendix A, Table 5.
Town of Carbondale Use TaxDeclared construction material value x 3.5%Appendix A, Table 5.

Solar Photovoltaic (PV) Permit

Verified

Required for solar installation on residential and commercial buildings in Carbondale, per Appendix A item 3.

Verified 2026-07-19 · Source

Requirements

  • Solar panel installation on a residential or commercial building within Town limits
  • Solar Requirements document review

Required documents

  • RequiredSolar Permit ApplicationTown of Carbondale Building Department's own application form.
  • RequiredSolar RequirementsTown-published solar permitting requirements document.

Fee schedule

Fee typeAmountNotes
Solar Permit — Residential$200.00Appendix A, Fee Schedule item 3: 'Solar Permits Residential (Plan Review + 2 Inspections) .....$200.00.'
Solar Permit — Commercial$500.00Appendix A, Fee Schedule item 3: 'Solar Permits Commercial (Plan Review + 2 Inspections) .....$500.00.'
Town of Carbondale Use TaxDeclared construction material value x 3.5%Appendix A, Fee Schedule, item 1.

Re-roof, Window, and Door Replacement Permit

Verified

Required for roof replacement/repair and window/door replacement in Carbondale, per Appendix A items 2 and 4. This is the fastest-reviewed permit category the Town publishes besides Plumbing/Mechanical/Solar.

Verified 2026-07-19 · Source

Requirements

  • Roof replacement/repair, or window/door replacement, on a structure within Town limits
  • Roof repairs and replacements DO require a permit, per the Town's Building Department page

Required documents

  • RequiredRoof Permit ApplicationTown of Carbondale Building Department's own fillable roof permit application.
  • RequiredBuilding Permit Application (window replacement)Town of Carbondale Building Department's own application form, used for window replacement.
  • OptionalHomeowner Agreement For PermittingRequired if applicable.

Fee schedule

Fee typeAmountNotes
Roofing Permit (Application Review + 2 Inspections)$150.00Appendix A, Fee Schedule item 2.
Roofing — each additional inspection beyond 2 (large roof systems)$60.00 eachAppendix A, Fee Schedule item 2; payment required prior to the final inspection.
Window Replacement (Plan Review + 2 Inspections)$150.00Appendix A, Fee Schedule item 4.
Town of Carbondale Use TaxDeclared construction material value x 3.5%Appendix A, Fee Schedule, item 1.

Fence Permit

Verified

Required for new fence construction/repair in Carbondale, per Appendix A item 7.

Verified 2026-07-19 · Source

Requirements

  • New fence construction or fence repair within Town limits
  • Site plan with fence location highlighted, per the Town's document center listing

Required documents

  • RequiredBuilding Permit Application - Submit Site Plan With Location HighlightedTown of Carbondale Building Department's own application form for fences.
  • OptionalFence RepairsTown-published guidance document for fence repairs specifically.

Fee schedule

Fee typeAmountNotes
Fence Permit$50.00Appendix A, Fee Schedule item 7: 'Fence Permits .....$50.00.'

Demolition Permit

Verified

Required for demolition of a structure in Carbondale where the building is not going back in its original place; demolition of a structure that IS being rebuilt in place is instead included within the residential/commercial building permit for that project.

Verified 2026-07-19 · Source

Requirements

  • Demolition of a structure within Town limits (standalone demolition permit applies when the structure is not being rebuilt in its original place)
  • Demolition Permit Application

Required documents

  • RequiredDemolition Permit ApplicationTown of Carbondale Building Department's own application form.

Fee schedule

Fee typeAmountNotes
Demolition Permit$75.00Appendix A, Fee Schedule item 5: 'Demolition Permit .....$75.00.'

Electrical Permit (State-Issued)

Verified

Electrical work in Carbondale is permitted and inspected by the Colorado State Electrical Board (Division of Professions and Occupations), NOT by the Town of Carbondale — Carbondale does not operate its own local electrical inspection program. The Town's own permit-type list identifies this permit as 'electrical (State)', and Appendix A's Fee Schedule contains no Town-collected electrical permit fee line, consistent with the Town deferring this permit type entirely to the State.

Verified 2026-07-19 · Source

Requirements

  • Electrical wiring installation/alteration within Town limits requires a valid Colorado State Electrical Permit prior to starting work, obtained directly through the State's DPO Online Permitting System
  • Permits are valid for one year from issuance

Required documents

  • OptionalHomeowner Agreement For Permitting If ApplicableTown-published reference document listed alongside the Town's Electrical Permits document-center entry, though the underlying permit itself is issued by the State.

Fee schedule

Fee typeAmountNotes

EV Charger / EVSE Permit

Verified

Carbondale does not publish a standalone EV-charger/EVSE permit type. Installing electric vehicle charging equipment (e.g., a new 240V Level 2 circuit) is electrical work, and per the Town's own permit-type list and this file's separate 'electrical-permit' entry, ALL electrical permits and inspections in Carbondale are issued and inspected by the Colorado State Electrical Board (Division of Professions and Occupations / DORA) — the Town has no local Electrical Inspection Program. Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act, effective August 7, 2024) sets a December 31, 2025 compliance deadline for standardized EV-charging permitting only for municipalities with population 10,000+ and counties with population 20,000+; Carbondale's 2024 Census population estimate is approximately 6,700-6,800, below that municipal threshold, so the Town is not required to adopt a distinct EV-charging permitting process under this law. No Town ordinance, Building Department page, or Appendix A Fee Schedule line item referencing EV chargers, EVSE, or HB24-1173 was found as of this review.

Verified 2026-07-20 · Source

Requirements

  • EV charger circuit installation (Level 2 or higher, or any new/altered branch circuit) is electrical work; apply directly through the Colorado State Electrical Board (DORA) DPO Online Permitting System, not the Town of Carbondale, per the Town's general electrical-permit routing
  • Simple Level 1 (120V, existing receptacle) charger use typically does not require a separate electrical permit under standard NEC practice; a new dedicated circuit does
  • No Carbondale-specific or DORA-published EV-charger line item, checklist, or fee was found as of this review; the general State electrical permit application/process applies
  • Carbondale's 2024 population (~6,700-6,800) is below the 10,000-population threshold that triggers HB24-1173's mandatory local EV-charging permitting-process compliance deadline for municipalities

Required documents

  • RequiredColorado State Electrical Permit Application (DPO Online Permitting System)Same general electrical permit application used for any new branch circuit or electrical alteration in Carbondale; submitted directly to the State, not the Town

Fee schedule

Fee typeAmountNotes
Electrical Permit Fee (general, no distinct EV-charger line item)Set by the Colorado State Electrical Board (DORA), not the TownNeither the Town's Appendix A Fee Schedule nor DORA's Electrical Board Permit and Inspection Information page publishes a standalone EV-charger/EVSE fee; an EV charger circuit is billed under the State's general electrical permit fee structure. Contact DORA (303-894-7800) or use the DPO Online Permitting System for the current amount for a specific project.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Town of Carbondale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /colorado/garfield-county/carbondale-co/as-of/2026-07-19/

Snapshot date: 2026-07-19

Commit: 73563e6

Reproducible from PermitBase’s version-controlled dataset, commit 73563e6.