Glenwood Springs building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Glenwood Springs, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 101 W. 8th Street, Second Floor, Glenwood Springs, CO 81601
- Phone
- 970-384-6450
- Building@cogs.us
- Office hours
- Glenwood Springs City Hall Hours: 7:30 AM to 5:30 PM, Mondays-Thursdays (closed Fridays), per the City's Contact Us footer. Building Department direct line 970-384-6450; Fax 970-945-8582; Inspection Line (24-hour automated request system) 970-384-6432; Building Official Victor Meraz, 970-384-6410.
- Website
- Official site
Published scheduling rules
- Do not call the City's Inspection Line (970-384-6432) to schedule an electrical inspection — that line only covers City-permitted work (building, plumbing, mechanical, solar). Electrical inspections must be scheduled directly with the State of Colorado. (Electrical Permit (Issued by the State of Colorado, Not the City))
- To schedule an inspection, call the City's Inspection Hot Line (970-384-6432) at least 24 hours in advance with: project address, permit number, date requested, morning/afternoon preference, and contractor contact information (Solar PV Permit)
- Do not call the City's Inspection Line (970-384-6432) to schedule an EV charger electrical inspection -- that line only covers City-permitted work (building, plumbing, mechanical, solar structural). Electrical inspections must be scheduled directly with the State of Colorado. (EV Charger / Electric Vehicle Charging Station Permit)
Inspection sequence
Applies to: Residential Building Permit (New Construction, 4 or Fewer Units)
- 1
Foundation
Before concrete pour; City does not inspect drilling/reinforcement/placement of piers, piles, shafts, or caissons — a qualified engineer must perform and certify that inspection separately
- 2
Rough Framing
Structural framing complete before cover
- 3
Rough Plumbing / Rough Mechanical
Trade rough-ins before concealment; electrical rough-in is inspected separately by the State of Colorado, not the City
- 4
Lath and Gypsum Board Inspection
After lathing/gypsum board (interior and exterior) is in place but before plastering or joint taping/finishing
- 5
Final Inspection
All City-permitted work (building, plumbing, mechanical) complete per approved plans; a separate final electrical inspection/sign-off from the State of Colorado is required before occupancy; certificate of occupancy withheld until all monies owed to the City are paid in full
Applies to: Accessory Dwelling Unit (ADU) Permit
- 1
Foundation
Before concrete pour, if new footings are part of the ADU construction
- 2
Rough Framing
Framing complete, four-sided design features verified against approved plans
- 3
Rough Plumbing / Mechanical
Trade rough-ins before concealment; electrical rough-in inspected separately by the State of Colorado
- 4
Final Inspection and Certificate of Occupancy
All work complete per approved plans; a Certificate of Occupancy specifically stating the unit is an ADU is required before it may legally be rented
Applies to: Residential Addition / Remodel Permit (Including New Accessory Structures)
- 1
Foundation (if new footings)
Before concrete pour, for additions/accessory structures with new foundation elements
- 2
Rough Framing
Framing complete and tied into existing structure before cover
- 3
Rough Plumbing / Mechanical
Trade rough-ins before concealment; electrical rough-in inspected separately by the State of Colorado
- 4
Final Inspection
All City-permitted work complete per approved plans
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment
- 2
Final Inspection
Equipment operational, combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough Plumbing
Pipe, drain, waste, and vent installation before concealment; license verification performed on-site by the City inspector
- 2
Final Inspection
Fixtures connected, no leaks, proper venting verified
Applies to: Solar PV Permit
- 1
Pre-Installation Inspection of Bracketing
Verifies mounting bracket installation prior to panel placement
- 2
Final Inspection
Completed installation verified
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Glenwood Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Glenwood Springs building permits
Get alerts for Glenwood Springs
We'll email you when Glenwood Springs's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.