EV Charger / Electric Vehicle Charging Station Permit in Glenwood Springs, Colorado

Installing a Level 2 (240V) EV charging circuit or EVSE unit in Glenwood Springs is electrical work, and per Municipal Code §105.2 (IBC)/§R105.2 (IRC) as amended by Ordinance 2022-06, ALL electrical permits and inspections within the City are handled exclusively by the State of Colorado DORA Electrical Board -- the City of Glenwood Springs does not itself issue or inspect electrical permits, mirroring how the City routes all other electrical work (identical mechanism already documented in this file's electrical-permit entry). Unlike solar PV, which requires a separate City structural/racking Building Permit (Table 1-A, up to $500 residential), a simple wall-mounted or pedestal EV charger with no new structure does not trigger a City building permit -- only the State electrical permit applies.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical work (the EV charger circuit itself) must be permitted and inspected directly through the State of Colorado DORA Division of Professions and Occupations, Electrical Board -- not the City of Glenwood Springs
  • The installing electrical contractor must additionally hold a City of Glenwood Springs 'Electrician' contractor registration (no charge) before being listed as electrical contractor of record, per the City's Contractor Licensing requirements -- this registration is separate from, and does not replace, the state electrical permit Contractor
  • A City of Glenwood Springs Building Permit is required IN ADDITION only if the EVSE installation includes new structural work (e.g., a new carport, canopy, or accessory structure to house the charger) -- not required for a simple charger mounted on an existing wall or a freestanding pedestal with no new structure
  • No EV-charger-specific submittal checklist analogous to the City's Solar Panel Permits page was found published by the City; electrical permitting follows the State's standard residential/commercial electrical permit process

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

City of Glenwood Springs Electrician Contractor LicenseSame registration used for all electrical work citywide, per the Contractor Licensing chart; expires concurrently with the electrician's State of Colorado Electrician's License
No charge
State of Colorado electrical permit fees (EVSE circuit)Not within this file's scope, consistent with this corpus's existing electrical-permit entry for Glenwood Springs, which documents the same city/state division of authority -- confirm the current state fee schedule directly with DORA, 303-894-7800 or dora_electricalboard@state.co.us
Set by the State of Colorado (DORA Electrical Board), not the City of Glenwood Springs
City Building Permit (only if new structure, e.g. carport/canopy, is built to house the charger)Applies only when the EV charger installation includes new structural construction; a standalone wall/pedestal charger with no new structure does not require this
Same Table 1-A hourly fee ($50.00/hr, capped $500 residential / $2,000 nonresidential) used for other City structural permits

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Glenwood Springs?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    State of Colorado Electrical Inspection

    Scheduled directly with the State of Colorado Electrical Board, not the City's Inspection Line -- verifies the new circuit, breaker sizing, and disconnect per NEC Article 625

See the full Glenwood Springs inspection guide — scheduling & re-inspection fees →

Tips

  • Do not call the City's Inspection Line (970-384-6432) to schedule an EV charger electrical inspection -- that line only covers City-permitted work (building, plumbing, mechanical, solar structural). Electrical inspections must be scheduled directly with the State of Colorado.
  • Even though the City doesn't issue the electrical permit itself, your electrician still needs a (free) City of Glenwood Springs contractor registration before being listed as the electrical contractor on any related City permit. Contractor
  • Colorado's HB24-1173 (Electric Vehicle Charging System Permits Act, 2024) directs larger Colorado municipalities and counties to streamline LAND USE permitting for public/commercial EV charging stations via the Colorado Energy Office's EV Charging Model Land Use Code -- this affects site-plan/land-use review for public charging installations, not the electrical permit itself, which remains a State DORA matter regardless of a jurisdiction's HB24-1173 compliance path. Confirm with City Community Development whether a site plan or land-use review applies for a commercial/public charging installation.
  • A simple residential Level 2 charger mounted on an existing garage wall does not need a City building permit at all -- only the State electrical permit and the (free) City contractor registration for your electrician. Contractor

Frequently asked questions

Glenwood Springs requires an ev charger / electric vehicle charging station permit for: Electrical work (the EV charger circuit itself) must be permitted and inspected directly through the State of Colorado DORA Division of Professions and Occupations, Electrical Board -- not the City of Glenwood Springs; The installing electrical contractor must additionally hold a City of Glenwood Springs 'Electrician' contractor registration (no charge) before being listed as electrical contractor of record, per the City's Contractor Licensing requirements -- this registration is separate from, and does not replace, the state electrical permit; A City of Glenwood Springs Building Permit is required IN ADDITION only if the EVSE installation includes new structural work (e.g., a new carport, canopy, or accessory structure to house the charger) -- not required for a simple charger mounted on an existing wall or a freestanding pedestal with no new structure; No EV-charger-specific submittal checklist analogous to the City's Solar Panel Permits page was found published by the City; electrical permitting follows the State's standard residential/commercial electrical permit process. If your project isn't listed, confirm with City of Glenwood Springs Building Department (Community Development Department) at 970-384-6450 before starting work.

No. Solar has its own City structural-permit fee (Table 1-A, up to $500 residential) because it involves roof/racking structural review. A standalone EV charger has no analogous City fee because the work is purely electrical, and electrical permitting statewide (not just in Glenwood Springs) is a State DORA function, not a City one.

Glenwood Springs does not publish a plan-review timeline for this permit. Contact City of Glenwood Springs Building Department (Community Development Department) at 970-384-6450 for current turnaround.

You'll need: State of Colorado Electrical Permit (DORA Electrical Board); City of Glenwood Springs Electrician Contractor Registration. See the required-documents checklist on this page for details on each.

Glenwood Springs requires 1 inspection(s) for an ev charger / electric vehicle charging station permit, in order: State of Colorado Electrical Inspection. Schedule each through City of Glenwood Springs Building Department (Community Development Department) (970-384-6450).

Apply through City of Glenwood Springs Building Department (Community Development Department) at 101 W. 8th Street, Second Floor, Glenwood Springs, CO 81601. Phone: 970-384-6450, email: Building@cogs.us. Office hours: Glenwood Springs City Hall Hours: 7:30 AM to 5:30 PM, Mondays-Thursdays (closed Fridays), per the City's Contact Us footer. Building Department direct line 970-384-6450; Fax 970-945-8582; Inspection Line (24-hour automated request system) 970-384-6432; Building Official Victor Meraz, 970-384-6410.. Official information: https://www.cogs.us/283/Building-Department.

Glenwood Springs, Colorado has adopted: 2021 International Building Code (IBC), with local amendments — adopted by Ordinance No. 06, Series of 2022 (effective 90 days after second publication, passed 03/03/2022), repealing and reenacting Title 060 of the Glenwood Springs Municipal Code in its entirety; 2021 International Residential Code (IRC), with local amendments; 2021 International Plumbing Code (IPC), with local amendments; 2021 International Mechanical Code (IMC), with local amendments; 2021 International Property Maintenance Code (IPMC); 2021 International Existing Building Code (IEBC); 2021 International Energy Conservation Code (IECC); 2021 International Fire Code (IFC), with Appendices D (Fire Apparatus Access Roads), H (Hazardous Materials Management Plan/Inventory Statement), and J (Building Information Sign) adopted; 2021 International Fuel Gas Code (IFGC); 2021 International Swimming Pool and Spa Code (ISPSC); 2020 National Electrical Code (NEC) and 2020 National Electrical Safety Code — administered exclusively by the State of Colorado, not the City (see localAmendments); Colorado Wildfire Resiliency Code (CWRC, based on the 2024 International Wildland-Urban Interface Code) — state-mandated statewide program (C.R.S., administered by the Colorado Division of Fire Prevention and Control); the City's own Building Department page states enforcement in Glenwood Springs 'Starts Wednesday, July 1st, 2026,' consistent with the statewide April 1, 2026 local-adoption deadline and July 1, 2026 full-compliance deadline for jurisdictions with mapped Wildland-Urban Interface area; IBC Appendices adopted: Appendix C (Group U-Agricultural Buildings), Appendix E (Supplementary Accessibility Requirements), Appendix G (Flood-Resistant Construction), Appendix I (Patio Covers), Appendix J (Grading); IRC Appendices adopted: Appendix AE (Manufactured Housing Used As Dwellings), Appendix AF (Radon Control Methods), Appendix AG (Piping Standards for Various Applications), Appendix AH (Patio Covers), Appendix AJ (Existing Building and Structures), Appendix AM (Home Day Care), Appendix AQ (Tiny Houses), Appendix AT (Solar-Ready Provisions); Full Title 060 (Construction Building Codes and Regulations) text available via library.municode.com/co/glenwood_springs; Ordinance 2022-06 PDF hosted directly by the City. Local amendments apply — see the Glenwood Springs overview page for the full list.

The electrical work itself is permitted directly through the State of Colorado DORA Electrical Board, not the City -- the City of Glenwood Springs does not issue or inspect electrical permits for any project, per Municipal Code §105.2/§R105.2 as amended by Ordinance 2022-06. A City building permit is only needed in addition if new structural work (like a carport) is built to house the charger.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Glenwood Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.