This is PermitBase’s published record for Rifle as of 2026-08-02. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Rifle building permits

Verified

Rifle, Colorado — as published 2026-08-02.

Verified 2026-07-06 · Source

Codes adopted

2015 International Codes (I-Codes), as locally amended — confirmed directly on the City's Building Department page ('The City of Rifle is under the 2015 International Codes')2009 International Energy Conservation Code (IECC) — Energy Zone 52003 ANSI A117.1 (Accessible and Usable Buildings and Facilities)Full Charter and Municipal Code, Chapter 18 (Building Regulations) hosted at library.municode.com/co/rifle — the live Municode page returned an access-restricted/JS-rendered response during this extraction and could not be independently re-verified for the specific adoption-ordinance number and full local-amendment text beyond what the City's own Building Department page and permit application forms directly state; treat Chapter 18 citation as the governing local code chapter by name only, not as a verbatim-quoted source in this fileDesign criteria (Table R301.2(1)-equivalent, per the City's own Building Department page): Roof (snow) live load 40 psf; Ground snow load 47 psf; Basic wind speed 120 mph (Ultimate); Seismic Design Category C; Weathering Severe; Frost line depth 36 inches; Termite Slight/moderate; Decay Slight; Winter design temperature -2°F; Ice shield underlayment Required; Flood Hazard Yes (FIRM effective 10-15-85); Air freezing index 2,500; Mean annual temperature 48°F

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for construction of a new home or a new addition to a home within Rifle city limits. Reviewed under the City's adopted 2015 International Codes, 2009 IECC (Energy Zone 5), and 2003 ANSI A117.1, plus the City's own snow/wind/seismic/frost design criteria. Electrical work is permitted and inspected separately by the State of Colorado (DORA State Electrical Board), not the City; plumbing and mechanical scope is bundled into this single building permit.

Verified 2026-07-06 · Source

Requirements

  • A complete set of plans, as listed on the permit application, is required; plans will not be reviewed until minimum plan submittal requirements are met
  • The Senior Planner and Building Official must approve the plans and the setbacks for new construction and additions
  • A site plan must be submitted to Planning prior to or together with the building permit application for any new structure
  • Design criteria per the City's own published table: 40 psf roof snow live load, 47 psf ground snow load, 120 mph ultimate basic wind speed, Seismic Design Category C, 36-inch frost line depth, -2°F winter design temperature
  • Electrical work is NOT included in this City building permit — it is permitted and inspected exclusively by the State of Colorado (DORA State Electrical Board); electrical permit applications are available from the Building Department but must be submitted to the State
  • Plumbing and mechanical permits and their fees are paid at the time of issuance of the building permit — these are not separate standalone applications in Rifle
  • A $500 non-refundable deposit is required for residential new construction, applied toward the plan-review/building-permit fee at issuance
  • Use tax of 4.25% on construction materials (valuation divided by 2, then multiplied by 4.25%) must be paid at permit issuance; no Certificate of Occupancy issues until use tax is paid
  • A Foundation Location Certificate is required at foundation completion, before any further construction proceeds
  • All contractors performing work must hold a current City of Rifle contractor license, obtained via Cloudpermit
  • Applications submitted online via Cloudpermit (us.cloudpermit.com/gov)
  • Minimum plan submittal checklist includes (non-exhaustive): engineered foundation plan, heating calculations, soils report, site plan (existing/proposed structures, paved surfaces, refuse areas, drainage, easements, property-line distances, legal description), front elevation with height, energy plans, floor plans for each floor (heating/water heater location, room sizes/uses, window/door locations and sizes, egress-compliant bedrooms, plumbing fixture locations, smoke detector locations, attic/crawl space access), means of egress and stairway details, framing/truss/joist specifications, water and sewer utility connection locations

Required documents

  • RequiredResidential Building Permit Application (Cloudpermit)Submitted online via the City's Cloudpermit portal
  • RequiredComplete Plan Set (3 copies plus digital copy)Architectural/structural/site plans per the minimum plan submittal checklist on the application form
  • RequiredSite PlanSubmitted to Planning prior to or with the building permit application for new structures; must show structure locations/dimensions, paved surfaces, refuse areas, drainage plan, easements, property-line distances, and legal description
  • RequiredSoils ReportListed on the minimum plan submittal checklist
  • RequiredEnergy PlansRequired per the minimum plan submittal checklist, consistent with the adopted 2009 IECC

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$23.50Building Permit Fee Worksheet, City of Rifle Building Department
Building Permit Fee — valuation $500.01 to $2,000.00$23.50 for the first $2,000.00 plus $3.05 for each additional $100.00 or fraction thereof, to and including $2,000.00
Building Permit Fee — valuation $2,000.01 to $25,000.00$69.25 for the first $2,000.00 plus $14.00 for each additional $1,000.00 or fraction thereof, up to $25,000.00
Building Permit Fee — valuation $25,000.01 to $50,000.00$391.25 for the first $25,000.00 plus $10.10 for each additional $1,000.00 or fraction thereof, up to $50,000.00
Building Permit Fee — valuation $50,000.01 to $100,000.00$643.75 for the first $50,000.00 plus $7.00 for each additional $1,000.00 or fraction thereof, up to $100,000.00
Building Permit Fee — valuation $100,000.01 to $500,000.00$993.75 for the first $100,000.00 plus $5.60 for each additional $1,000.00 or fraction thereof, up to $500,000.00
Building Permit Fee — valuation $500,000.01 to $1,000,000.00$3,233.75 for the first $500,000.00 plus $4.75 for each additional $1,000.00 or fraction thereof, up to $1,000,000.00
Building Permit Fee — valuation $1,000,000.01 and up$5,608.75 for the first $1,000,000.00 plus $3.15 for each additional $1,000.00 or fraction thereof
Use Tax4.25% of (project valuation ÷ 2)Paid at permit issuance; no Certificate of Occupancy until paid
Application Deposit (residential new construction)$500.00, non-refundableApplied toward the plan-review/permit fee at issuance, per the Fee Schedules page and the Building Permit Application form
Parkland Dedication Fee (new residential unit)$4,120.36 per unit (escalates 5% every January 1)Single Family Residential Fee Schedule 2026, RMC 16-1-90(d)(3); applies to new buildings, verify against subdivision/annexation agreements
Offsite Street Impact Fee (new residential unit)$6,995.95 per unit (escalates 3% every January 1)Single Family Residential Fee Schedule 2026, RMC 16-1-100 / RMC 13-6-10 et seq.
Water Rights Dedication Fee$450.00 per EQRSingle Family Residential Fee Schedule 2026, RMC 13-6-10 et seq.
Water System Improvement Fee$6,857.44 per EQR (escalates 3% every January 1)Ordinance 7, Series of 2021; RMC 13-4-70
Sewer System Improvement Fee$6,754.75 per EQR (escalates 3% every January 1)Ordinance 7, Series of 2021; RMC 3-4-10

Residential Remodel Permit

Verified

Required for residential remodel work within Rifle city limits, including demolition, new walls (structural or not), heating, plumbing, decks (including covered/elevated decks), re-roofs, fences, water heaters, furnaces, AC/swamp coolers, fireplaces, wood stoves, and gas fireplaces. Reviewed under the City's adopted 2015 International Codes as locally amended.

Verified 2026-07-06 · Source

Requirements

  • Permits are required for, at minimum: demolition; new walls (structural or not); heating; plumbing; decks (including covered and elevated decks); re-roofs; fences; hot water heaters; furnaces; AC/swamp coolers; fireplaces, wood stoves, and gas fireplaces; solar panels; ADUs; and commercial sprinkler systems, per the Residential Information page
  • A complete, code-compliant plan/scope description is required as listed on the Residential Remodel Application
  • Electrical work is NOT included in this City permit — apply directly to the State of Colorado (DORA State Electrical Board)
  • Plumbing and mechanical work is bundled into this permit; fees for both are paid at issuance
  • Applications submitted online via Cloudpermit
  • Contact the Building Department (970-665-6461) with questions about whether a specific project requires a permit

Required documents

  • RequiredResidential Remodel Application (Cloudpermit)Submitted online via the City's Cloudpermit portal

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based table as new construction)$23.50 minimum, scaling per the City's Building Permit Fee Worksheet valuation tiersBuilding Permit Fee Worksheet, City of Rifle Building Department
Use Tax4.25% of (project valuation ÷ 2)Paid at permit issuance

Electrical Permit (Issued by the State of Colorado, Not the City)

Verified

All electrical permits within Rifle are obtained from the Colorado State Electrical Board (Division of Professions and Occupations, DORA), not the City of Rifle. This is stated directly and verbatim on the City's own Non-Residential Building Permit Application: 'Electrical permits are obtained from the State Electrical Board. Applications are available from the Building Department.'

Verified 2026-07-06 · Source

Requirements

  • Apply for the electrical permit directly with the Colorado Division of Professions and Occupations (DORA), State Electrical Board — not the City of Rifle
  • Electrical permit application forms are available from the City's Building Department even though the City itself does not process or issue the permit
  • Electrical valuation should still be identified/tracked as part of overall project scope even though the City does not permit the electrical work itself

Required documents

  • RequiredState of Colorado Electrical Permit (DORA / State Electrical Board)Obtained directly from the State, not the City; application forms available from the City's Building Department

Fee schedule

Fee typeAmountNotes
State of Colorado electrical permit feesSet by the State of Colorado (DORA State Electrical Board), not the City of RifleNot within this file's scope — confirm current state fee schedule directly with DORA (dpo.colorado.gov/Electrical)

Plumbing Permit (Bundled with Building Permit)

Verified

Plumbing work in Rifle is permitted through the same building permit application as the overall project, not a separate standalone plumbing permit. The City's own Non-Residential Building Permit Application states directly: 'Plumbing and mechanical permits, as well as all fees, are paid for at the time of issuance of the Building Permit.'

Verified 2026-07-06 · Source

Requirements

  • Plumbing scope is included in the building permit application — there is no separate standalone plumbing permit application in Rifle, unlike some other jurisdictions in this corpus
  • Plumbing permit fees are paid together with the building permit fee at the time of building permit issuance
  • Plumbing work must comply with the City's adopted code edition (2015 International Codes, which includes the International Plumbing Code by reference) as locally amended
  • Contractors performing plumbing work must hold a current City of Rifle contractor license (via Cloudpermit)

Required documents

  • RequiredBuilding Permit Application (Cloudpermit) — plumbing scope includedPlumbing work is described within the overall building permit application; no separate plumbing-specific form exists

Fee schedule

Fee typeAmountNotes
Plumbing permit feeIncluded within, and paid together with, the overall Building Permit Fee at issuancePer the City's own Non-Residential Building Permit Application: 'Plumbing and mechanical permits, as well as all fees, are paid for at the time of issuance of the Building Permit'

Mechanical / HVAC Permit (Bundled with Building Permit)

Verified

Mechanical/HVAC work (heating, furnaces, AC/swamp coolers, fireplaces, wood stoves, gas fireplaces) in Rifle is permitted through the same building permit application as the overall project, consistent with the City's stated process: 'Plumbing and mechanical permits, as well as all fees, are paid for at the time of issuance of the Building Permit.'

Verified 2026-07-06 · Source

Requirements

  • Heating, furnace, AC/swamp cooler, fireplace, wood stove, and gas fireplace work all require a permit per the Residential Information page's explicit list
  • Mechanical scope is included in the building permit application — there is no separate standalone mechanical permit application in Rifle
  • Mechanical permit fees are paid together with the building permit fee at the time of building permit issuance
  • Work must comply with the City's adopted 2015 International Codes (which includes the International Mechanical Code by reference) as locally amended

Required documents

  • RequiredBuilding Permit / Residential Remodel Application (Cloudpermit) — mechanical scope includedMechanical work is described within the overall permit application; no separate mechanical-specific form exists

Fee schedule

Fee typeAmountNotes
Mechanical permit feeIncluded within, and paid together with, the overall Building Permit Fee at issuancePer the City's own Non-Residential Building Permit Application: 'Plumbing and mechanical permits, as well as all fees, are paid for at the time of issuance of the Building Permit'

Solar PV Permit (Building Permit + State-Issued Electrical, Statewide Fee Cap)

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems within Rifle city limits. The structural/roof-mounting scope is processed through the City's standard building permit (Cloudpermit), same as any other residential remodel item explicitly listed on the City's own Residential Information page ('solar panels'). The electrical-connection scope is NOT issued by the City — like all electrical work in Rifle, it is permitted and inspected exclusively by the Colorado State Electrical Board (DORA). Statewide law caps the combined government fees a solar installation may be charged and requires larger municipalities to offer automated permitting.

Verified 2026-07-19 · Source

Requirements

  • Structural/roof-mounting scope: submit via the City's Cloudpermit portal (us.cloudpermit.com/gov) using the Residential Remodel Application (or the Residential/Non-Residential Building Permit Application for new construction), since 'solar panels' is explicitly listed among items requiring a residential permit on the City's Residential Information page
  • Electrical-connection scope: apply directly to the Colorado State Electrical Board (DORA, Division of Professions and Occupations) — NOT through the City — per the City's own Building Permit Application language that all electrical permits are obtained from the State Electrical Board
  • Statewide fee cap under C.R.S. § 24-48.5-113 (enacted by HB21-1284): the AGGREGATE of all charges/fees any Colorado local government may impose to install an active solar energy system is capped at $500 for a residential system under 10kW and $1,000 for a commercial system or a residential system 10kW or over — this cap applies to the City's building-permit-side fee for the solar installation, on top of (and separate from) whatever DORA charges for the state electrical permit
  • Automated-permitting mandate under HB25-1096 (C.R.S., effective 8/6/2025): municipalities with population over 5,000 — which includes Rifle (population ~10,600) — must adopt an automated residential solar permitting platform (e.g., SolarAPP+) capable of processing at least 75% of code-compliant applications for existing single-family homes; as of this review, Rifle is not listed among the small number of Colorado jurisdictions SolarAPP+'s own Colorado landing page names as live (Bennett, Wheat Ridge, City & County of Denver, Alamosa County, Gilpin County) — confirm current implementation status directly with the Building Department (970-665-6461)
  • A Foundation Location Certificate and the general building-permit submittal/plan-review process otherwise apply the same as for any other residential remodel item

Required documents

  • RequiredResidential Remodel Application (Cloudpermit) — structural/roof-mounting scopeSame City form used for other listed remodel items (decks, re-roofs, fences); describe the solar installation's mounting scope and location
  • RequiredState of Colorado Electrical Permit (DORA / State Electrical Board) — electrical-connection scopeObtained directly from the State, not the City; application forms available from the City's Building Department per its own Building Permit Application

Fee schedule

Fee typeAmountNotes
City of Rifle Building Permit Fee (structural/roof-mounting scope) — subject to statewide capCalculated per the City's standard valuation-based Building Permit Fee Worksheet, but the AGGREGATE of all City fees/charges for the solar installation cannot exceed $500 (residential, under 10kW) or $1,000 (commercial, or residential 10kW+), per C.R.S. § 24-48.5-113 (HB21-1284)
C.R.S. § 24-48.5-113, enacted by HB21-1284 (2021); Show full citation

C.R.S. § 24-48.5-113, enacted by HB21-1284 (2021); applies statewide to every Colorado local government, overriding the City's general Table 1-A-style valuation fee schedule specifically for solar installations once that schedule would otherwise exceed the statutory cap. The City does not publish a solar-specific line item on its own Building Permit Fee Worksheet — this cap is the governing ceiling regardless. Re-verified 2026-07-30 against the SIGNED BILL (leg.colorado.gov 2021a_1284_signed.pdf): the caps are $500 residential / $1,000 nonresidential, and the bill's own markup shows why the older $2,000 figure still circulates — it reads 'five hundred dollars for a residential application or [two] ONE thousand dollars for a nonresidential application', i.e. HB21-1284 amended the prior two-thousand-dollar nonresidential cap DOWN to one thousand. Anything citing $2,000 for a nonresidential solar permit is pre-2021 law. DRIFT-CHECK CAVEAT: this entry will be flagged every sweep and it is NOT drift — the tokenizer splits the statute citation 'C.R.S. § 24-48.5-113' into the numbers 24, 48.5 and 113 and treats 48.5/113 as claimed dollar figures. They are section numbers, not fees. Same hyphen-group collision the detector already documents for phone numbers, but occurring on the claim side rather than in the page haystack.

State of Colorado electrical permit fees (electrical-connection scope)Set by the State of Colorado (DORA State Electrical Board), not the City of Rifle
Confirm current state fee schedule directly with DORA (dpo.colorado.gov/Electrical); Show full citation

Confirm current state fee schedule directly with DORA (dpo.colorado.gov/Electrical); this state-level fee is separate from, and not itself capped in the same statute as, the City's own fee ceiling above (the statutory cap in C.R.S. § 24-48.5-113 governs local-government charges, i.e., the City's fee).

Roofing Permit (Re-Roofing)

Verified

A permit is required for re-roofing within Rifle city limits, per the City's own Residential Information page, which explicitly lists 're-roofs' among the work types requiring a residential permit. Reviewed under the City's adopted 2015 International Codes.

Verified 2026-07-06 · Source

Requirements

  • Re-roofing is explicitly listed as requiring a permit on the City's Residential Information page
  • Applications submitted online via Cloudpermit
  • Work must comply with the City's adopted 2015 International Residential Code roofing provisions and the City's published snow-load design criteria (40 psf roof live load, 47 psf ground snow load)

Required documents

  • RequiredResidential Remodel Application (Cloudpermit)Re-roofing is submitted under the general residential remodel permit application

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based table)$23.50 minimum, scaling per the City's Building Permit Fee Worksheet valuation tiersThe City's fee schedule materials do not carry a distinct flat re-roofing fee tier (unlike some other jurisdictions in this corpus) — re-roofing is fee'd via the same general valuation-based Building Permit Fee Worksheet

Fence Permit

Verified

A permit is required to install a fence within Rifle city limits, per the City's own Residential Information page, which explicitly lists 'fences' among the work types requiring a residential permit.

Verified 2026-07-06 · Source

Requirements

  • Fences are explicitly listed as requiring a permit on the City's Residential Information page
  • Applications submitted online via Cloudpermit
  • Contact the Building Department (970-665-6461) to confirm any height, setback, or zoning-specific limitations that may apply beyond the building-permit requirement itself — this file could not independently locate a published fence-height/zoning threshold document during this extraction

Required documents

  • RequiredResidential Remodel Application (Cloudpermit)Fences are submitted under the general residential remodel permit application

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based table)$23.50 minimum, scaling per the City's Building Permit Fee Worksheet valuation tiersNo distinct flat fence-permit fee tier was found published; fences appear to be fee'd via the same general valuation-based worksheet

Accessory Dwelling Unit (ADU) Permit

Verified

A permit is required for ADU construction within Rifle city limits, per the City's own Residential Information page, which explicitly lists 'ADU's' among the work types requiring a residential permit. This file could not independently locate Rifle's specific ADU zoning standards (size caps, setback, parking, or design requirements) during this extraction beyond the building-permit requirement itself.

Verified 2026-07-06 · Source

Requirements

  • ADUs are explicitly listed as requiring a permit on the City's Residential Information page
  • Applications submitted online via Cloudpermit
  • Contact the Building Department (970-665-6461) or Community Development for ADU-specific zoning standards (size, setback, parking, design) — this file could not confirm a published ADU-specific zoning ordinance section during this extraction and does not want to invent size/setback figures not directly sourced

Required documents

  • RequiredResidential Remodel Application / Building Permit Application (Cloudpermit)ADU construction is submitted through the general building/remodel permit application; a separate zoning/land-use review may also apply and should be confirmed with Community Development

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based table)$23.50 minimum, scaling per the City's Building Permit Fee Worksheet valuation tiersNo ADU-specific flat fee was found published; confirm with Community Development whether any separate land-use application fee also applies

EV Charging Station Permit (Issued by the State of Colorado, Not the City)

Verified

As with all electrical work in Rifle, the permit for a Level 2 (or higher) electric vehicle charging station/EVSE is obtained from the Colorado State Electrical Board (Division of Professions and Occupations, DORA), not the City of Rifle — the same finding this file's electrical-permit entry documents, stated verbatim on the City's own Non-Residential Building Permit Application: 'Electrical permits are obtained from the State Electrical Board.' No separate City building permit is required for a standalone EVSE circuit unless it also involves a new structure, in which case the City's own valuation-based Building Permit Fee Worksheet applies to that scope (this file found no evidence the statutory $500/$1,000 solar fee cap under C.R.S. § 24-48.5-113 extends to EV chargers — that cap is solar-specific).

Verified 2026-07-20 · Source

Requirements

  • Apply for the electrical permit directly with the Colorado Division of Professions and Occupations (DORA), State Electrical Board — not the City of Rifle
  • Electrical permit application forms are available from the City's Building Department even though the City itself does not process or issue the permit
  • Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System) and any state electrical board amendments
  • Rifle's own population (approximately 9,900 per the 2020 Census) falls under the 10,000-person threshold for a 'covered municipality' under Colorado's HB24-1173 EV charger permitting law, but Garfield County (population well over 20,000) is a 'covered county' subject to the law's 12/31/2025 permitting-process compliance deadline

Required documents

  • RequiredState of Colorado Electrical Permit (DORA / State Electrical Board)Obtained directly from the State, not the City; application forms available from the City's Building Department

Fee schedule

Fee typeAmountNotes
State of Colorado electrical permit feesSet by the State of Colorado (DORA State Electrical Board), not the City of RifleNot within this file's scope — confirm current state fee schedule directly with DORA (dpo.colorado.gov/Electrical). Same mechanism this file's electrical-permit entry documents; no dedicated EV/EVSE fee line item was located.

Commercial Building Permit (New Construction)

Required for new commercial/non-residential building construction within Rifle city limits, using the City's own Non-Residential / Commercial Building Permit Application (distinct in form and deposit amount from the residential application, though it draws fees from the same valuation-based Building Permit Fee Worksheet). Reviewed under the City's adopted 2015 International Codes as locally amended. As with residential work, electrical scope is permitted and inspected separately by the State of Colorado (DORA State Electrical Board), not the City; plumbing and mechanical scope is bundled into this single building permit.

Reviewed 2026-08-02 · Source

Requirements

  • Apply via the City's Non-Residential/Commercial Building Permit Application, submitted online through Cloudpermit (us.cloudpermit.com/gov), per the Commercial Information page ('Apply for your commercial permit on Cloudpermit')
  • A non-refundable $1,500 Application Deposit is required for any NEW commercial construction (distinct from the $500 deposit for commercial remodel/tenant finish), due at the time of application and applied toward plan review fees at permit issuance — per the City's own Fee Schedules ('Building Permit Fee Estimator') page and confirmed on the face of the Non-Residential Building Permit Application form itself, which prints '$1,500.00 DEPOSIT' in its City-use header block
  • Plan review fees are calculated at 65% of the building permit fee, per the City's own Fee Schedules page ('Calculating the Building Permit Fee, Plan Review Fee & Use Tax') — this fee is separate from, and in addition to, the base Building Permit Fee itself
  • Building Permit Fee is calculated from the same valuation-based fee table used for residential permits (e.g. $23.50 minimum up to $5,608.75 + $3.15/$1,000 over $1,000,000), per the City's own Building Permit Fee Worksheet, which states the fee table applies without a separate commercial-specific schedule
  • Use tax of 4.25% on construction materials (valuation divided by 2, then multiplied by 4.25%) must be paid at permit issuance; no Certificate of Occupancy issues until use tax is paid
  • A complete set of plans (three copies plus a digital copy) meeting the minimum plan submittal checklist is required; only COMPLETE applications will be reviewed
  • A site plan must be submitted to Planning prior to or together with the building permit application for all new structures
  • Owner approval (a letter from the property owner) is required on the application if the applicant is not the property owner
  • Project valuation, occupancy group, type of construction, and required parking spaces are determined/recorded by the Building Department as part of application processing, per the fields on the face of the Non-Residential Building Permit Application
  • A Foundation Location Certificate is required at the time of foundation completion and before any other construction is commenced, per the face of the Non-Residential Building Permit Application
  • All contractors performing work must hold a current City of Rifle contractor license, obtained via Cloudpermit
  • Electrical work is NOT included in this City building permit — it is permitted and inspected exclusively by the State of Colorado (DORA State Electrical Board); electrical permit applications are available from the Building Department but must be submitted to the State
  • Plumbing and mechanical permits and their fees are paid at the time of issuance of the building permit — these are not separate standalone applications in Rifle
  • Non-residential-specific impact/utility fees may apply on top of the building permit fee, including Water Rights Dedication Fee, Water System Improvement Fee, Sewer System Improvement Fee, Water Meter Cost (by meter size), Water Connection/Inspection Fee, Sewer Connection Inspection Fee, and an Offsite Street Impact Fee calculated case-by-case for nonresidential uses, per the City's Non-Residential General Fee Schedule 2026

Required documents

  • RequiredNon-Residential / Commercial Building Permit Application (Cloudpermit)Submitted online via the City's Cloudpermit portal; distinct form from the residential application, capturing occupancy group, type of construction, parking spaces required, and land use in addition to standard project fields
  • RequiredComplete Plan Set (3 copies plus digital copy)Architectural/structural/site plans per the minimum plan submittal checklist on the application form
  • RequiredSite PlanSubmitted to Planning prior to or with the building permit application for new structures
  • OptionalOwner Approval LetterRequired when the applicant is not the property owner, per the application form's 'OWNER APPROVAL: (need letter from property owner)' field

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-tier table as residential — see residential-building-permit entry for full table)$23.50 minimum (valuation $1-$500), scaling to $5,608.75 + $3.15/$1,000 over $1,000,000Building Permit Fee Worksheet, City of Rifle Building Department — the worksheet states one table is used to calculate the fee 'based on the valuation of the project,' with no separate commercial-specific tier structure found
Plan Review Fee65% of the Building Permit Fee
City of Rifle Fee Schedules page ('Building Permit Fee Estimator'): 'Plan review fees are calculated at 65% of the building permit fee.' This fee applies to all City building permits, not only… Show full citation

City of Rifle Fee Schedules page ('Building Permit Fee Estimator'): 'Plan review fees are calculated at 65% of the building permit fee.' This fee applies to all City building permits, not only commercial ones, but is documented here because it was newly confirmed during this research pass and is not yet reflected in this file's other permit-type entries.

Application Deposit (new commercial construction)$1,500.00, non-refundableDue at time of application; applied toward plan review fees at permit issuance. City of Rifle Fee Schedules page and confirmed on the face of the Non-Residential Building Permit Application form
Use Tax4.25% of (project valuation ÷ 2)Paid at permit issuance; no Certificate of Occupancy until paid
Water Rights Dedication Fee$450.00 per EQRNon-Residential General Fee Schedule 2026, RMC 13-6-10 et seq.
Water System Improvement Fee$6,857.44 per EQR (escalates 3% every January 1)Non-Residential General Fee Schedule 2026, Ordinance 7 Series of 2021, RMC 13-4-70
Sewer System Improvement Fee$6,754.75 per EQR (escalates 3% every January 1)Non-Residential General Fee Schedule 2026, Ordinance 7 Series of 2021, RMC 13-4-90
Water Meter Cost$830.00 (3/4 inch); $927.00 (1 inch); $2,554.00 (1.5 inch); $2,869.00 (2 inch)Non-Residential General Fee Schedule 2026; 2-inch displacement used for restaurants unless also connected to a sprinkler system, in which case a compound meter is used
Water Connection/Inspection Fee$119.89 (escalates 2% every January 1)Non-Residential General Fee Schedule 2026
Sewer Connection Inspection Fee$131.95 (escalates 2% every January 1)Non-Residential General Fee Schedule 2026
Offsite Street Impact FeeCalculated on a case-by-case basis for nonresidential usesNon-Residential General Fee Schedule 2026 and Non-Residential Street Impact Fee Calculator 2026; not a fixed published figure — confirm with the Building Department for a specific project
Infill Fee Reduction Area (IFRA) discount20% reduction of the fees on the Non-Residential General Fee Schedule if the project is located within the designated Infill Fee Reduction AreaNon-Residential General Fee Schedule 2026

Tenant Improvement / Commercial Remodel Permit

Required for tenant finish-out and commercial remodel work within Rifle city limits. The City's own Fee Schedules page treats 'any commercial remodel or tenant finish' as a single bundled deposit category ($500, the same deposit charged for residential new construction), distinct from the $1,500 deposit charged for entirely new commercial construction — confirming this is a genuine, separately-priced permit category rather than an assumption. Applications are submitted through the same Non-Residential/Commercial Building Permit Application and Cloudpermit portal used for new commercial construction. If the project also involves a new business/tenant use, a separate Planning Department Sales Tax Zoning Review is required before a City sales tax license can be issued.

Reviewed 2026-08-02 · Source

Requirements

  • Apply via the Non-Residential/Commercial Building Permit Application, submitted online through Cloudpermit (us.cloudpermit.com/gov), per the Commercial Information page
  • A non-refundable $500 Application Deposit is required for 'any commercial remodel or tenant finish,' due at the time of application and applied toward plan review fees at permit issuance — per the City's own Fee Schedules page
  • Plan review fees are calculated at 65% of the building permit fee, per the City's Fee Schedules page
  • Building Permit Fee is calculated from the same valuation-based fee table used for residential and new commercial construction permits, per the City's own Building Permit Fee Worksheet
  • Use tax of 4.25% on construction materials (valuation divided by 2, then multiplied by 4.25%) must be paid at permit issuance; no Certificate of Occupancy issues until use tax is paid
  • Only COMPLETE applications will be reviewed; a complete plan set is required per the minimum plan submittal checklist
  • If your business requires a City of Rifle sales tax license (i.e., a new use/tenant in the space), you must first fill out the Sales Tax Zoning Review Sheet and submit it to the Planning Department for approval before applying for the sales tax license — this is a separate Planning process from the building permit itself, and the City's own Commercial Information page notes that 'a new use of a building may have additional building code requirements for the safety of the business owner and the public'
  • Electrical work is NOT included in this City building permit — apply directly to the Colorado State Electrical Board (DORA)
  • Plumbing and mechanical permits and their fees are paid at the time of issuance of the building permit — not separate standalone applications
  • All contractors performing work must hold a current City of Rifle contractor license, obtained via Cloudpermit
  • This file could not independently locate a published, itemized 'tenant improvement' plan-submittal checklist distinct from the general Non-Residential Building Permit Application's checklist — confirm project-specific submittal requirements (e.g., for interior-only scope with no foundation/structural work) directly with the Building Department

Required documents

  • RequiredNon-Residential / Commercial Building Permit Application (Cloudpermit)Same form used for new commercial construction; submitted online via Cloudpermit
  • RequiredComplete Plan Set (3 copies plus digital copy)Scope-appropriate plans per the minimum plan submittal checklist on the application form
  • OptionalSales Tax Zoning Review Sheet (PDF)Required only if the tenant/business requires a City of Rifle sales tax license; must be approved by the Planning Department before a sales tax license application is submitted — separate from, and in addition to, the building permit

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-tier table as residential and new commercial construction — see residential-building-permit entry for full table)$23.50 minimum (valuation $1-$500), scaling to $5,608.75 + $3.15/$1,000 over $1,000,000Building Permit Fee Worksheet, City of Rifle Building Department
Plan Review Fee65% of the Building Permit FeeCity of Rifle Fee Schedules page: 'Plan review fees are calculated at 65% of the building permit fee.'
Application Deposit (commercial remodel or tenant finish)$500.00, non-refundableDue at time of application; applied toward plan review fees at permit issuance. City of Rifle Fee Schedules page: 'A non-refundable $500 deposit is required for all new residential construction and any commercial remodel or tenant finish.'
Use Tax4.25% of (project valuation ÷ 2)Paid at permit issuance; no Certificate of Occupancy until paid

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rifle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-20)Later version (2026-08-14) →View current record →All versions →

Permalink: /colorado/garfield-county/rifle/as-of/2026-08-02/

Snapshot date: 2026-08-02

Commit: 200ac62

Reproducible from PermitBase’s version-controlled dataset, commit 200ac62.