This is PermitBase’s published record for Winter Park as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Winter Park building permits
VerifiedWinter Park, Colorado — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family homes, duplexes (two-family attached dwellings), and townhomes within the joint jurisdiction of Winter Park, Fraser, and Granby, administered by the Winter Park/Fraser/Granby Building Department. Reviewed under the 2021 IRC/IBC as locally amended by Winter Park Town Code Title 6, Chapter 1, including the Town's mountain-specific structural criteria (30-inch frost depth, ASCE-7-based snow/wind loads, 70 psf ground-snow-load stamping trigger).
Verified 2026-07-06 · Source
Requirements
- Fully completed and signed joint Building Permit Application (Towns of Winter Park, Fraser and Granby) — the job's town (Winter Park, Fraser, or Granby) must be circled; incomplete applications are not accepted
- All square footages must be GROSS square footage (outside to outside of exterior walls)
- Digital building plans, including a site plan previously approved by the Planning Commission (Minor Site Plan process for detached single-family/attached two-family homes), submitted in PDF to permits@wpgov.com
- Construction documents (foundations on caissons, non-conventional roof/wall framing, or site-specific ground snow load over 70 psf) must be prepared, stamped, and sealed by a licensed Colorado design professional
- Soils investigation report as required by subdivision plat notes
- Improvement Location Certificate (ILC) and Setback and Elevation Certificate from a licensed Colorado surveyor for all new foundations (Improvement Survey Plat required if within 5 ft of a property line or built into a variance-granted setback), submitted for Planning Division review/approval before framing begins
- Documentation of an approved water and sewer utility plan from the applicable water/sanitation district, including payment of tap fees
- Contractor Insurance Affidavit executed by the property owner
- Notification of Sales Tax Liability Agreement signed by the property owner
- East Grand Fire Protection District No. 4 Impact Fee Agreement signed by the property owner (Winter Park properties)
- Single-Family/Two-Family Attached Deposit Agreement plus $2,000.00 deposit (split between building exterior completion and landscaping/revegetation), required for detached single-family/attached two-family homes
- Foundation must be protected from frost per Town Code 6-1-2/6-1-3: extend 30 inches below the local frost line, design per ASCE 32, erect on solid rock, or per licensed design professional
- All footing/foundation systems must be designed AND inspected by a licensed Colorado design professional (reinforcing, UFER ground, damp-proofing/perimeter drain)
- Electrical permit is a SEPARATE application filed directly with the Colorado State Electrical Board, not with this Building Division
- Retaining walls of any height require a separate permit and licensed design professional
Required documents
- RequiredBuilding Permit Application (Towns of Winter Park, Fraser and Granby)Joint application form; submit to permits@wpgov.com
- RequiredConstruction Drawings / Site PlanDigital, PDF format; site plan must reflect prior Planning Commission Minor Site Plan approval where applicable
- RequiredILC/ISP and Setback and Elevation CertificateLicensed Colorado surveyor; ISP required if within 5 ft of property line or a granted setback variance
- RequiredSoils/Geotechnical Investigation Report
- RequiredContractor Insurance Affidavit
- RequiredNotification of Sales Tax Liability Agreement
- RequiredEast Grand Fire Protection District No. 4 Impact Fee AgreementWinter Park properties
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1.00 to $2,000.00 | $54.00 | Table 1-11-2B, Town Code Title 1 Chapter 11, per the Town's 'How to Estimate Building Permit Fees' guide |
| Building Permit Fee — valuation $2,001.00 to $25,000.00 | $54.00 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000 | — |
| Building Permit Fee — valuation $25,001.00 to $50,000.00 | $376.00 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000 | — |
| Building Permit Fee — valuation $50,001.00 to $100,000.00 | $628.50 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000 | — |
| Building Permit Fee — valuation $100,001.00 to $500,000.00 | $978.50 for the first $100,000 plus $5.10 for each additional $1,000 or fraction thereof, to and including $500,000 | — |
| Building Permit Fee — valuation $500,001.00 to $1,000,000.00 | $3,018.50 for the first $500,000 plus $4.25 for each additional $1,000 or fraction thereof, to and including $1,000,000 | — |
| Building Permit Fee — valuation $1,000,001.00 and up | $5,343.50 for the first $1,000,001 plus $3.65 for each additional $1,000 or fraction thereof | — |
| Plan Review Fee | 65% of the Building Permit Fee | Separate from and in addition to the permit fee |
| Single-Family/Two-Family Attached Deposit | $2,000.00 | Split equally between building-exterior completion and landscaping/revegetation deposits; refunded on Certificate of Occupancy and successful revegetation respectively |
| Minor Site Plan Fee | $100.00 | — |
| Driveway Permit Application & Deposit | $50.00 fee plus $1,000.00 deposit | — |
| Work Commenced Before Permit Issuance / Investigation Fee | Up to the full amount of the calculated permit fee | Town Code 6-1-2, Section 109.4/109.4.1 |
| Reinspection Fee | $47.00/hour (1-hour minimum) | — |
Residential Addition / Remodel Permit
VerifiedRequired for additions and remodels to single-family homes, duplexes, and townhomes in Winter Park, administered by the joint Winter Park/Fraser/Granby Building Department under the same joint application and 2021 IRC/IBC-based Town Code amendments as new construction.
Verified 2026-07-06 · Source
Requirements
- Same joint Building Permit Application (Towns of Winter Park, Fraser and Granby), with 'Alteration' or 'Addition' checked under Class of Work
- All measurements GROSS square footage; valuation of alterations/repairs/remodels must reflect actual cost to owner (materials and labor)
- Construction documents stamped by a licensed Colorado design professional required if structural work, non-conventional framing, or ground snow load over 70 psf is involved
- Additions requiring new foundation work must comply with the same 30-inch frost depth and design-professional inspection requirements as new construction
- Two-family (duplex) additions/remodels must maintain the required 2-hour fire-resistance-rated separation between units per Town Code 6-1-3 amending IRC R302.3
- Electrical work on an addition/remodel still requires a SEPARATE permit filed directly with the Colorado State Electrical Board
- Water/sewer utility plan documentation required if the scope changes fixture count or service demand
Required documents
- RequiredBuilding Permit Application (Towns of Winter Park, Fraser and Granby)
- RequiredConstruction Drawings (existing + proposed)
- RequiredContractor Insurance Affidavit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based Table 1-11-2B as new construction) | $54.00 minimum, scaling per the valuation tiers | Town Code Title 1, Chapter 11 |
| Plan Review Fee | 65% of the Building Permit Fee | — |
| Reinspection Fee | $47.00/hour (1-hour minimum) | — |
Electrical Permit
VerifiedElectrical permitting for Winter Park, Fraser, and Granby is administered directly by the Colorado State Electrical Board (Division of Professions and Occupations), NOT by the local Winter Park/Fraser/Granby Building Department. This is confirmed verbatim on the Town's own Building Division page: 'The Colorado State Electrical Board handles all electrical permitting in Winter Park, Fraser and Granby.'
Verified 2026-07-06 · Source
Requirements
- Apply directly to the Colorado State Electrical Board using the state's own Electrical Permit Application (linked from the Town's Building Division page as 'Download the Colorado State Electrical Application')
- Electrical work must be performed by a Colorado-licensed electrician; per the Town Code 6-1-10 (National Electrical Code section), it is unlawful to install/alter/repair electrical systems in violation of the NEC as adopted
- The State Electrical Board publishes its own Electrician License Contemporaneous Review Guidelines, linked from the Town's Building Division page
- The Town of Winter Park has separately adopted the NEC (2020 Edition per its current Codes Adopted by Reference list) by reference as a secondary code, and states it will concurrently adopt whatever edition the State of Colorado next adopts — this governs the substantive electrical standard even though the STATE handles permit issuance and inspection
- The National Electrical Code, Title 12 Article 23 of the Colorado State Electrical Laws and Rules and Regulations, applies; where Colorado's electrical code is more restrictive than the base NEC, the more restrictive standard controls
Required documents
- RequiredColorado State Electrical Board Permit ApplicationFiled with the state board directly, not the local Building Division
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State Electrical Board permit fees | Set by the Colorado State Electrical Board (Division of Professions and Occupations), not the Town | This corpus's Winter Park file does not carry the state board's fee schedule, as it is a separate statewide fee table not published by the Town; consult dpo.colorado.gov/Electrical/PermitsandInspections directly for current amounts |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair within the joint Winter Park/Fraser/Granby jurisdiction. Reviewed under the International Plumbing Code (most current edition as adopted by the State of Colorado, per Town Code 6-1-1), administered by the Winter Park/Fraser/Granby Building Department (unlike electrical, plumbing permits ARE issued locally, not by a state board).
Verified 2026-07-06 · Source
Requirements
- Plumbing scope is captured on the same joint Building Permit Application (Towns of Winter Park, Fraser and Granby) via the 'Plumbing Valuation' field, or as a standalone plumbing permit for plumbing-only work
- Governed by the International Plumbing Code as most currently adopted by the State of Colorado; where Colorado's plumbing code is more restrictive than a Town Code provision, the more restrictive standard applies
- Toilet facilities must be provided for construction workers on active job sites, maintained sanitarily from project start until certificate of occupancy (Town Code 6-1-2, Section 2901.2 / 6-1-3, Section R306.5)
- Sewer depth requirements are set by the local water and sanitation district having jurisdiction (Town Code 6-1-3, amending IRC P2603.6.1), not a fixed Town Code number
- Vent pipe roof extensions must terminate at 12 inches above the roof (24 inches from the roof peak) or, where the roof is used for purposes beyond weather protection, extend at least 7 feet above the roof (Town Code 6-1-3, amending IRC P3103.1)
Required documents
- RequiredBuilding Permit Application (Towns of Winter Park, Fraser and Granby) — Plumbing Valuation field, or standalone plumbing permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee (same valuation-based Table 1-11-2B as building permits) | $54.00 minimum, scaling per valuation tiers | Town Code Title 1, Chapter 11 |
| Plan Review Fee | 65% of the permit fee | — |
| Reinspection Fee | $47.00/hour (1-hour minimum) | — |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, ventilation, and fuel-gas equipment installation or replacement within the joint Winter Park/Fraser/Granby jurisdiction. Governed by the 2021 International Mechanical Code (IMC) as amended by Town Code 6-1-5, and the 2021 International Fuel Gas Code (IFGC).
Verified 2026-07-06 · Source
Requirements
- Mechanical scope is captured on the joint Building Permit Application via the 'Mechanical Valuation' field, or as a standalone mechanical permit
- Unvented gas log heaters and unvented room heaters are prohibited (Town Code 6-1-5, amending IMC 903.3; Town Code 6-1-3, amending IRC M1410.1/G2425.8/G2433/G2445)
- Fireplace stoves and solid-fuel-type room heaters must be listed/labeled, tested to UL737 (stoves) or UL 1482 (room heaters/inserts), and installed per manufacturer instructions; detached one/two-family dwellings are limited to one solid-fuel-burning device per property; must meet EPA Phase II or Colorado Phase III air quality requirements (Town Code 6-1-5, Section 905.1)
- Boilers and pressure vessels must be operated/maintained per nationally recognized standards, with State Boiler Inspector oversight (Town Code 6-1-5, Section 1001.2)
Required documents
- RequiredBuilding Permit Application (Towns of Winter Park, Fraser and Granby) — Mechanical Valuation field, or standalone mechanical permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee (same valuation-based Table 1-11-2B) | $54.00 minimum, scaling per valuation tiers | Town Code Title 1, Chapter 11 |
| Plan Review Fee | 65% of the permit fee | — |
| Reinspection Fee | $47.00/hour (1-hour minimum) | — |
Roofing Permit (Re-Roof)
VerifiedRequired for re-roofing work within the joint Winter Park/Fraser/Granby jurisdiction. Governed by 2021 IBC/IRC ice-barrier, snow-shed-barrier, and drip-edge/underlayment amendments (Town Code 6-1-2/6-1-3). Winter Park is additionally subject to the new statewide 2025 Colorado Wildfire Resiliency Code (statutory compliance deadline July 1, 2026), but the Town had not published its own locally-amended Wildfire Resiliency Code section text as of this extraction — see note below.
Verified 2026-07-06 · Source
Requirements
- An ice barrier of approved self-adhering polymer-modified bitumen sheet is required on all sloped roofs in lieu of normal underlayment, extending from the eaves to a point 6 feet inside the exterior wall line and 24 inches from the center line of all valleys, fully adhered to the substrate (roofs under 4:12 pitch require double underlayment with 100% base-layer coverage); detached accessory structures with no conditioned floor area are exempt (Town Code 6-1-2, Section 1507.1.1/1507.2.8.2; 6-1-3, Section R905.1.2)
- Roofs must be designed with snow-shed barriers preventing accumulation from shedding onto exterior balconies, decks, exits, stairways, sidewalks, streets, alleys, or gas/electric utility meters — mechanical snow-retention devices must be secured to framing per manufacturer instructions, installed in at least two rows (first row within 24 inches of the eave), staggered at 24-inch centers, with continuous barriers at 48-inch centers (Town Code 6-1-2, Section 1503.6/1507.4/1507.5; 6-1-3, Section R905.1.3/R905.4.7/R905.10.5.1)
- A drip edge is required at eave and rake edges of all pitched roofs, minimum 1-inch vertical leg, lapped not less than 1 inch, extended back on the deck not less than 2 inches, mechanically fastened at intervals not exceeding 18 inches (Town Code 6-1-2, Section 1507.2.8.3)
- New roof coverings must not be installed over existing layers where the existing roof is water-soaked/deteriorated, is wood shake/slate/clay/cement/asbestos-cement tile, or already has more than one existing layer (Town Code 6-1-3, amending IRC R907.3)
- On all metal roofs, vent pipes/stacks must terminate within 3 feet of the ridge or use a snow splitter/cricket (Town Code 6-1-2, Section 1503.5)
- Changing roofing materials/coverings to something other than like materials may require a roof evaluation from a licensed Colorado design professional (Town Code 6-1-2, Section 1608.1)
Required documents
- RequiredBuilding Permit Application (Towns of Winter Park, Fraser and Granby) — Roofing scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based Table 1-11-2B) | $54.00 minimum, scaling per valuation tiers | Town Code Title 1, Chapter 11 |
| Plan Review Fee | 65% of the permit fee | — |
| Reinspection Fee | $47.00/hour (1-hour minimum) | — |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Winter Park building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.