Version history — Winter Park, Colorado
This is PermitBase’s own verified record for Winter Park, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Winter Park’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-25Superseded
- 2026-08-14Superseded
- 2026-08-02Superseded
- Winter Park, Colorado — Commercial Building Permit record added
- Winter Park, Colorado — Tenant Improvement / Tenant Finish Permit record added
- 2026-07-20Superseded
- Winter Park, Colorado — EV Charger / Electric Vehicle Charging Station Permit fee record added: State Electrical Board Permit Fee (EV charger circuit/equipment) (Set by the State Electrical Board per C.R.S. § 12-115-121(1) based on actual inspection cost — calculated and charged online at the DPO Online Permitting System, not published as a static table)
- Winter Park, Colorado — EV Charger / Electric Vehicle Charging Station Permit fee record removed: State Electrical Board permit fees (EV charger circuit/equipment)
- Winter Park, Colorado — plan-review timeline record updated: undefined–3 business days
- Winter Park, Colorado — Solar Photovoltaic (PV) Permit fee record added: Statewide aggregate solar permit fee cap — Residential ($500 (combined Town + State Electrical Board fees))
- Winter Park, Colorado — Solar Photovoltaic (PV) Permit fee record added: Statewide aggregate solar permit fee cap — Commercial ($1,000 (combined Town + State Electrical Board fees))
- Winter Park, Colorado — Solar Photovoltaic (PV) Permit fee record updated: Valuation-based per Table 1-11-2B of the Town's Building Permit Fee Schedule, capped at $500 (residential) / $1,000 (commercial) under C.R.S. § 24-48.5-113 (HB21-1284) → Valuation-based per Table 1-11-2B of the Town's Building Permit Fee Schedule; no dedicated solar/PV line item published, subject to the statewide cap above
- Winter Park, Colorado — Solar Photovoltaic (PV) Permit record added
- Winter Park, Colorado — EV Charger / Electric Vehicle Charging Station Permit record added
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Winter Park began