Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-07-07.

Crested Butte building permits

Verified

Crested Butte, Colorado — as published 2026-07-07.

Verified 2026-07-06 · Source

Codes adopted

2024 International Building Code (IBC), Chapters 1-35 without appendices — adopted by reference, Town Code Chapter 18, Article 1 (Sec. 18-1-10), pursuant to Title 31, Article 16, Part 2, C.R.S.2024 International Residential Code (IRC) — Town Code Chapter 18, Article 2 (Sec. 18-2-10), with extensive local amendments including an all-electric mandate and Table R301.2 climatic design data (Sec. 18-2-30)International Existing Building Code (IEBC) — Town Code Chapter 18, Article 2.5International Green Construction Code (IgCC), selected sections — Town Code Chapter 18, Article 1.5 (Sec. 18-1.5-30), applicable to new commercial construction2021 International Mechanical Code (IMC), including Appendix A — Town Code Chapter 18, Article 3 (Sec. 18-3-10)2021 International Plumbing Code (IPC), including Appendices C and E — Town Code Chapter 18, Article 4 (Sec. 18-4-10)2023 National Electrical Code (NEC) — Town Code Chapter 18, Article 5 (Sec. 18-5-10), adopted with no local amendments2021 International Fire Code (IFC), including Appendices B-M — Town Code Chapter 18, Article 6 (Sec. 18-6-10), enforced with Crested Butte Fire Protection District (CBFPD) coordination2025 Colorado Wildfire Resiliency Code (CWRC), 8 CCR 1507-39 — Town Code Chapter 18, Article 6.5 (Sec. 18-6.5-10), established statewide July 1, 2025; Town enforcement begins June 1, 2026 per the Town's own CWRC Summary Sheet2021 International Fuel Gas Code (IFGC), including Appendices — Town Code Chapter 18, Article 7 (Sec. 18-7-10), with local amendments requiring high-efficiency direct-vent sealed-combustion appliances only (deleting IFGC's alternative combustion-air provisions)2021 International Energy Conservation Code (IECC), without appendices — Town Code Chapter 18, Article 9, Sec. 18-9-40; new construction is additionally required to achieve DOE Zero Energy Ready Home (ZERH) certification per the Town's 2024 Building Code Information page and fact sheet, effective for permits starting January 1, 2026Colorado Model Electric Ready and Solar Ready Code — referenced throughout the Town's 2024 Building Code fact sheet for EV-ready parking, solar-ready zones, and electric-ready gas-appliance provisionsFull Town Code Chapter 18 (Building Regulations) text hosted at townofcrestedbutte.colorado.gov (Town Code Chapter 18 Revised PDF, Supp. No. 22) and mirrored on library.municode.com/co/crested_butte

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family homes, duplexes, and accessory dwelling units within Town of Crested Butte limits. Reviewed under the 2024 IRC as locally amended (Town Code Chapter 18, Article 2), including the Town's Table R301.2 climatic design criteria (100 lbs/sq ft flat roof snow load, 115 mph wind design speed, 36-inch frost line, Seismic Design Category C), the all-electric building mandate, DOE Zero Energy Ready Home (ZERH) certification requirement, and mandatory BOZAR historic/design review approval before a building permit application may even be submitted.

Verified 2026-07-06 · Source

Requirements

  • BOZAR approval (Development Permit Application) REQUIRED before a building permit application may be submitted (Town Code Sec. 18-13-10(b), 18-13-40(b)/(d)) — a narrow foundation-only early-start exception exists under specific conditions
  • Engineering plans for single/two-family residences must be prepared by a Colorado-registered or licensed design professional and signed/stamped with a seal (Town Code Sec. 18-13-20(a)(15))
  • Must meet Table R301.2 design criteria: 100 lbs/sq ft flat roof snow load, 115 mph wind design speed (Exposure/topographic effects: none), Seismic Design Category C, 36-inch minimum frost line depth, mandatory roof ice barrier underlayment, -16 F winter design temperature, 8,921 ft Manual J elevation
  • All-electric building: no combustion equipment for space heating, water heating, or cooking appliances (exception: EPA Phase 2 qualified solid fuel-burning devices per Article 8)
  • New residential construction must achieve DOE Zero Energy Ready Home (ZERH) certification
  • One EV-Ready parking space per dwelling unit (208/240V, 30A receptacle, labeled 'Electric Vehicle Charging' branch circuit)
  • Single-family dwellings are exempt from automatic fire sprinkler requirements; shared-wall units (duplex/triplex/quadplex/multifamily) must meet IFC Chapter 9 / IRC P2904 sprinkler provisions
  • If located within a mapped Class 1 or Class 2 Colorado Wildfire Resiliency Code fire hazard area (confirm via the State Wildfire Resiliency Map Viewer), must meet CWRC structure-hardening requirements: Class A metal roof covering, No. 26 gage galvanized valley flashing, noncombustible gutters/vents, fire-resistance-rated exterior walls
  • Current Gunnison County building contractor license required for all contractors on the permit (Town Code Sec. 18-13-40(e), in effect since February 1, 2023)
  • Complete Sec. 18-13-20 submittal package: legal description, deed, plot plan, elevations, floor plan, site development plan, front elevation showing site context, contour depiction if grade varies more than 2 vertical feet
  • Valuation determined via ICC minimum valuation table x 2.70 regional modifier, or other evidence of value, whichever is greater

Required documents

  • RequiredBOZAR Development Permit ApplicationMust be approved before the building permit application is submitted
  • RequiredBuilding Permit ApplicationSubmitted to the Building Department; requires Sec. 18-13-20 submittal package
  • RequiredMaterials List Form - Primary StructureRequired for construction on a new or existing primary building; referenced during inspections
  • RequiredGunnison County Building Contractor License
  • RequiredEENH/ZERH Certification DocumentationHERS rater engagement, EENH Partner and Energy Star Partner registration required before permit issuance
  • OptionalStatement of Authority FormRequired if the property is owned by an LLC or other entity
  • OptionalLimited Power of AttorneyRequired if the applicant is not the property owner

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $1.00 to $500.00$28.422026 Town of Crested Butte Fee Schedule (Exhibit A), effective January 1, 2026, adopted by Resolution 34, Series 2025
Building Permit Fee — valuation $501.00 to $2,000.00$28.42 plus $3.68 per $100 of TSV or fraction thereof above $501
Building Permit Fee — valuation $2,001.00 to $25,000.00$83.74 plus $16.95 per $1,000 of TSV or fraction thereof above $2,001
Building Permit Fee — valuation $25,001.00 to $50,000.00$473.79 plus $12.18 per $1,000 of TSV or fraction thereof above $25,001
Building Permit Fee — valuation $50,001.00 to $100,000.00$778.58 plus $8.47 per $1,000 of TSV or fraction thereof above $50,001
Building Permit Fee — valuation $100,001.00 to $500,000.00$1,202.07 plus $6.77 per $1,000 of TSV or fraction thereof above $100,001
Building Permit Fee — valuation $500,001.00 to $1,000,000.00$3,911.05 plus $5.74 per $1,000 of TSV or fraction thereof above $500,001
Building Permit Fee — valuation $1,000,001.00 to $5,000,000.00$6,681.04 plus $3.00 per $1,000 of TSV or fraction thereof above $1,000,001
Building Permit Fee — valuation $5,000,001.00 and over$18,327 plus $1.00 per $1,000 of TSV or fraction thereof above $5,000,001
Plan Review Fee30% of Permit Fee (Residential) / 60% of Permit Fee (Commercial)2026 Fee Schedule
Use Tax DepositNot less than 4.5% of 60% of Total Project Valuation
Performance Deposit0.50% of Total Structure Value
Work without Permit$250 to $1,000 per day, plus applicable permit fee

Residential Addition / Remodel Permit

Verified

Required for additions and remodels to existing residential structures in Crested Butte. Reviewed under the 2024 IRC and International Existing Building Code (IEBC) as locally amended (Town Code Chapter 18, Articles 2 and 2.5); Level 3 alterations (renovating more than 50% of the work area) trigger additional electric-ready, EV-ready, and solar-ready requirements. BOZAR approval is required before submittal for any exterior-affecting work.

Verified 2026-07-06 · Source

Requirements

  • BOZAR Development Permit Application approval required before submitting the building permit application for any project with exterior changes, additions, or historic rehabilitation
  • All residential remodels must adhere to the 2024 International Existing Building Code (IEBC)
  • Level 3 alterations (more than 50% of work area renovated, per the floor-plan-based work-area definition) additionally require: EV-Ready parking space per dwelling unit; Electric Ready gas-appliance circuit/panel provisions if gas equipment is retained; Solar Ready zone per the Colorado Model Electric Ready and Solar Ready Code
  • Historic buildings undergoing a Level 3 alteration must meet the 2024 IECC without damaging the existing historic structure, and require both BOZAR and Building Official oversight
  • Optional Home Energy Assessment subsidy available from the Town for Level 3 remodels
  • If the addition increases footprint by 500 sq ft or more, or replaces more than 25% of exterior siding/roof covering, and the parcel falls within a mapped Class 1/Class 2 CWRC fire hazard area, full Colorado Wildfire Resiliency Code structure-hardening compliance is triggered for the affected assemblies
  • Current Gunnison County building contractor license required for all contractors on the permit
  • Materials List Form (Primary or Accessory Structure) required, referenced during inspections

Required documents

  • RequiredBOZAR Development Permit ApplicationRequired for exterior changes, additions, and historic rehabilitation projects
  • RequiredBuilding Permit Application
  • RequiredMaterials List Form (Primary or Accessory Structure)
  • RequiredGunnison County Building Contractor License

Fee schedule

Fee typeAmountNotes
Building Permit Fee (same valuation-based schedule as new construction)$28.42 minimum, scaling per the valuation tiers in the 2026 Fee ScheduleEffective January 1, 2026
Plan Review Fee30% of Permit Fee (Residential)

Electrical Permit

Verified

Required for electrical installation, alteration, or repair in Crested Butte. Governed by the 2023 National Electrical Code (NEC), adopted by Town Code Chapter 18, Article 5 with no local amendments. No standalone electrical permit fee schedule is published separately; electrical work fees are billed under the general Building Permit valuation-based fee table (Appendix A referenced in Town Code Sec. 18-5 fees provision).

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2023 NEC as adopted, with no local amendments (Town Code Sec. 18-5-30: 'The code adopted herein is modified by the following amendments: None.')
  • Current Gunnison County building contractor license required
  • Fees billed under the same valuation-based Building Permit fee table as building permits; no separate electrical-specific fee line item found in the 2026 Fee Schedule
  • Inspection requests must be submitted at least 5 working days in advance (adopted IFC Sec. 108.2.1)

Required documents

  • RequiredElectrical Permit ApplicationReferences the associated building permit if applicable
  • RequiredGunnison County Building Contractor License

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based, same table as Building Permit)Per the 2026 Fee Schedule's Building Permit valuation tiersNo standalone electrical permit fee schedule is published separately in the 2026 Fee Schedule; billed under the general valuation-based table
Plan Review Fee30% of Permit Fee (Residential) / 60% (Commercial)
Reinspection Fee$65.00/hour, minimum two-hour charge

Electric Vehicle Charging Station Permit

Verified

The Town of Crested Butte does not publish a standalone EV charger/EVSE permit application or fee line distinct from its general Electrical Permit -- checked the Building Department page, Town Code Chapter 18 Article 5 (Electrical Code), and the 2026 Fee Schedule directly; none name a separate EV charger permit or fee. Installing or retrofitting an EV charger (or completing the wiring to an already-provisioned EV-Ready circuit) is electrical work and is processed as a standard Electrical Permit under the 2023 NEC as adopted (Town Code Sec. 18-5), billed on the same valuation-based Building Permit fee table used for all electrical work in Crested Butte. This is distinct from the EV-Ready parking-space wiring mandate that applies automatically to new residential construction and Level 3 alterations (documented in this file's residential-building-permit and residential-addition-remodel entries) -- that mandate provisions the circuit/receptacle during new construction, while this entry covers permitting an EV charger installation itself, whether as part of new construction or a standalone retrofit to an existing home.

Verified 2026-07-20 · Source

Requirements

  • Governed by the 2023 NEC as adopted, with no local amendments (Town Code Sec. 18-5-30: 'The code adopted herein is modified by the following amendments: None'), including NEC Article 625 (Electric Vehicle Power Transfer System)
  • For NEW residential construction and Level 3 alterations (more than 50% of work area renovated), a labeled 'Electric Vehicle Charging' branch circuit with a 208/240V, 30A receptacle in the garage or within 6 feet of the driveway is already a mandatory requirement of the underlying Building/Electrical Permit -- see this file's residential-building-permit and residential-addition-remodel entries
  • For a STANDALONE EV charger retrofit to an existing home not otherwise triggering a Level 3 alteration, a standard Electrical Permit is required for the new circuit/charger installation
  • Current Gunnison County building contractor license required for contractor-performed work
  • Fees billed under the same valuation-based Building Permit fee table as other electrical work; no separate EV-charger-specific fee line item found in the 2026 Fee Schedule
  • Inspection requests must be submitted at least 5 working days in advance (adopted IFC Sec. 108.2.1)

Required documents

  • RequiredElectrical Permit ApplicationSame form used for any electrical work, including a standalone EV charger installation; references the associated building permit if applicable
  • OptionalGunnison County Building Contractor License

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based, same table as Building Permit)Per the 2026 Fee Schedule's Building Permit valuation tiersNo standalone EV-charger or electrical-specific fee schedule is published separately in the 2026 Fee Schedule; billed under the general valuation-based table, the same mechanism documented in this file's electrical-permit entry
Plan Review Fee30% of Permit Fee (Residential) / 60% (Commercial)
Reinspection Fee$65.00/hour, minimum two-hour charge

Plumbing Permit

Verified

Required for plumbing installation, alteration, or repair in Crested Butte. Governed by the 2021 International Plumbing Code (IPC), including Appendices C and E, adopted by Town Code Chapter 18, Article 4. The Town's Licensing & Permitting page publishes a combined Plumbing and Mechanical Permit Application for work such as water heater replacement, gas fireplaces, heat recovery ventilation systems, and kitchen hoods.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2021 IPC (Appendices C and E) as locally adopted
  • Combined Plumbing and Mechanical Permit Application used for scopes including replacement of existing water heaters, gas fireplaces, heat recovery ventilation systems, and kitchen hoods — applicants are directed to consult the Building Inspector to confirm the correct application for their project
  • Current Gunnison County building contractor license required
  • Inspection requests must be submitted at least 5 working days in advance

Required documents

  • RequiredPlumbing and Mechanical Permit ApplicationCombined application form used for plumbing and mechanical scopes
  • RequiredGunnison County Building Contractor License

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based, same table as Building Permit)Per the 2026 Fee Schedule's Building Permit valuation tiersNo standalone plumbing permit fee schedule is published separately
Plan Review Fee30% of Permit Fee (Residential) / 60% (Commercial)

Mechanical / HVAC Permit

Verified

Required for heating, cooling, ventilation, and gas appliance installation or replacement in Crested Butte. Governed by the 2021 International Mechanical Code (IMC), including Appendix A, adopted by Town Code Chapter 18, Article 3, and the 2021 International Fuel Gas Code (IFGC) for gas-fired equipment, which mandates high-efficiency direct-vent sealed-combustion appliances only.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2021 IMC (Appendix A) as locally adopted
  • Gas-fired equipment governed by the 2021 IFGC as locally amended: all installed fuel gas burning appliances must be high-efficiency direct-vent appliances with sealed combustion (Town Code Sec. 18-7-30(3)); several standard IFGC combustion-air provisions (Sections 304.2, 304.3, 304.5-304.8) are deleted in favor of manufacturer installation instructions
  • Combined Plumbing and Mechanical Permit Application used for common scopes including gas fireplaces, heat recovery ventilation systems, and kitchen exhaust hoods
  • Boiler/Compressor/Absorption System and Mechanical Exhaust Hood have their own flat fee line items in the 2026 Fee Schedule
  • Current Gunnison County building contractor license required

Required documents

  • RequiredPlumbing and Mechanical Permit Application
  • RequiredGunnison County Building Contractor License

Fee schedule

Fee typeAmountNotes
Mechanical Permit$100.002026 Town of Crested Butte Fee Schedule (Exhibit A), effective January 1, 2026
Mechanical Exhaust Hood$200.00
Solid Fuel Burning Device Application$100.00

Roofing Permit (Re-Roof)

Verified

Required for re-roofing work in Crested Butte, reviewed under the 2024 IBC/IRC as adopted, with mandatory ice barrier underlayment per Table R301.2. If the parcel falls within a mapped Class 1/Class 2 Colorado Wildfire Resiliency Code fire hazard area and the re-roof replaces more than 25% of the existing roof covering, the entire roof must meet CWRC Class A roof-covering and valley-flashing requirements. BOZAR/historic design review applies to visible roofing material changes given the Town's historic district status.

Verified 2026-07-06 · Source

Requirements

  • Roof Ice Barrier Underlayment Required: Yes, per Table R301.2 (Town Code Sec. 18-2-30(3))
  • If the parcel is within a mapped CWRC Class 1 or Class 2 fire hazard zone and the project replaces more than 25% of the existing roof covering, the ENTIRE roof must meet CWRC structure-hardening requirements: Class A roof covering (metal only — slate and concrete tile are currently not allowed per the Town's Design Standards and Guidelines), No. 26 gage galvanized valley flashing over 36-inch minimum underlayment, noncombustible gutters/downspouts with leaf guards, fire-resistance-rated or noncombustible fascia/soffit materials, and noncombustible ember-resistant vent mesh (1/8-1/16 inch)
  • BOZAR/Design Review Committee approval is required for exterior roofing material changes since Crested Butte is a National Historic District town; consult the Design Guidelines by zone
  • Current Gunnison County building contractor license required
  • Inspection requests must be submitted at least 5 working days in advance

Required documents

  • RequiredBuilding Permit Application — Roofing scope
  • RequiredBOZAR Development Permit ApplicationRequired for visible/exterior roofing material or design changes
  • RequiredGunnison County Building Contractor License

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same table as new construction)$28.42 minimum, scaling per the 2026 Fee Schedule valuation tiersNo standalone flat re-roof fee is published; billed under the general valuation-based Building Permit fee table based on roofing project valuation
Plan Review Fee30% of Permit Fee (Residential) / 60% (Commercial)

Solar PV Permit

Verified

Required for solar photovoltaic installation in Crested Butte, using the Town's dedicated Solar Permit Application. Requires drawings showing panel locations, solar specifications with required emergency shut-off and electrical code requirements, and a structural engineer stamped letter confirming the existing roof will remain structurally sound. Because solar panels are exterior/visible improvements in a historic district, BOZAR approval is also required alongside the standard building permit process.

Verified 2026-07-06 · Source

Requirements

  • Use the Town's Solar Permit Application specifically for solar-only projects
  • Submittal must include drawings showing solar panel locations, solar specifications including required emergency shut-off and electrical code compliance, and a structural engineer stamped letter confirming the existing roof will remain structurally sound
  • Per Town Code Sec. 18-9-100(3)(b), if a proposed renewable energy system used to offset outdoor energy usage (REMP) is solar in nature, the panels/collectors must be approved through the standard building permit process AND approved by the Board (BOZAR)
  • Current Gunnison County building contractor license required
  • Governed by the 2023 NEC (electrical) and applicable structural provisions of the 2024 IBC/IRC

Required documents

  • RequiredSolar Permit Application
  • RequiredStructural Engineer Stamped LetterConfirms existing roof will remain structurally sound
  • RequiredGunnison County Building Contractor License

Fee schedule

Fee typeAmountNotes
Permit Fee (valuation-based, same table as Building Permit)Per the 2026 Fee Schedule's Building Permit valuation tiersNo standalone solar-specific flat fee is published; billed under the general fee schedule

Building Relocation and Demolition Permit

Verified

Required to demolish or relocate any primary or accessory structure larger than 200 square feet in Crested Butte. This is a BOZAR-reviewed Development Permit process (Building Relocation and Demolition Permit Application), given the Town's National Historic District status, rather than a standalone Building Division demolition track.

Verified 2026-07-06 · Source

Requirements

  • Use the Building Relocation and Demolition Permit Application for any proposal to demolish or relocate a primary or accessory structure larger than 200 sq ft
  • Reviewed by BOZAR (the Town's own Demolition FAQ sheet provides additional guidance)
  • Structures 200 sq ft or smaller are not subject to this permit track per the Town's own application scope language
  • Historic structures may be eligible for a variance under CWRC Section 102.9 if a required upgrade would jeopardize continued historic designation, but this is a separate CWRC provision, not a demolition-permit exemption

Required documents

  • RequiredBuilding Relocation and Demolition Permit Application
  • OptionalDemolition FAQ SheetTown-published guidance document for this application

Fee schedule

Fee typeAmountNotes
Permit FeeNot separately published as a flat demolition fee in the 2026 Fee Schedule; billed via the applicable Design Review Application and Publication fee tiers ($120-$1,000+ depending on project classification) plus any associated Building Permit valuation fee2026 Town of Crested Butte Fee Schedule, Building & Planning section

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Crested Butte building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →

Permalink: /colorado/gunnison-county/crested-butte/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 371a356

Reproducible from PermitBase’s version-controlled dataset, commit 371a356.