Crested Butte building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Crested Butte, Colorado.
Last verified 2026-07-06 · Source · Embed this page’s badge · Version history
Building department
- Address
- 507 Maroon Ave, Crested Butte, CO 81224 (Building Department mailing address: PO Box 39, Crested Butte, CO 81224)
- Phone
- (970) 349-5338
- Office hours
- Monday-Friday 8:30 a.m. to 5:00 p.m. Building Official Astrid Matison (ext. 116, amatison@crestedbutte-co.gov). Building Inspector Josh Staab (ext. 127, jstaab@crestedbutte-co.gov). Community Development Director Mel Yemma (ext. 119, melyemma@crestedbutte-co.gov). BOZAR/Planning questions: planning@crestedbutte-co.gov, (970) 349-5338 ext. 121.
- Website
- Official site
Inspection guide
See how inspections work in Crested Butte — sequence, scheduling & re-inspection fees.
Codes adopted
Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.
- 2024 International Building Code (IBC), Chapters 1-35 without appendices — adopted by reference, Town Code Chapter 18, Article 1 (Sec. 18-1-10), pursuant to Title 31, Article 16, Part 2, C.R.S.
- 2024 International Residential Code (IRC) — Town Code Chapter 18, Article 2 (Sec. 18-2-10), with extensive local amendments including an all-electric mandate and Table R301.2 climatic design data (Sec. 18-2-30)
- International Existing Building Code (IEBC) — Town Code Chapter 18, Article 2.5
- International Green Construction Code (IgCC), selected sections — Town Code Chapter 18, Article 1.5 (Sec. 18-1.5-30), applicable to new commercial construction
- 2021 International Mechanical Code (IMC), including Appendix A — Town Code Chapter 18, Article 3 (Sec. 18-3-10)
- 2021 International Plumbing Code (IPC), including Appendices C and E — Town Code Chapter 18, Article 4 (Sec. 18-4-10)
- 2023 National Electrical Code (NEC) — Town Code Chapter 18, Article 5 (Sec. 18-5-10), adopted with no local amendments
- 2021 International Fire Code (IFC), including Appendices B-M — Town Code Chapter 18, Article 6 (Sec. 18-6-10), enforced with Crested Butte Fire Protection District (CBFPD) coordination
- 2025 Colorado Wildfire Resiliency Code (CWRC), 8 CCR 1507-39 — Town Code Chapter 18, Article 6.5 (Sec. 18-6.5-10), established statewide July 1, 2025; Town enforcement begins June 1, 2026 per the Town's own CWRC Summary Sheet
- 2021 International Fuel Gas Code (IFGC), including Appendices — Town Code Chapter 18, Article 7 (Sec. 18-7-10), with local amendments requiring high-efficiency direct-vent sealed-combustion appliances only (deleting IFGC's alternative combustion-air provisions)
- 2021 International Energy Conservation Code (IECC), without appendices — Town Code Chapter 18, Article 9, Sec. 18-9-40; new construction is additionally required to achieve DOE Zero Energy Ready Home (ZERH) certification per the Town's 2024 Building Code Information page and fact sheet, effective for permits starting January 1, 2026
- Colorado Model Electric Ready and Solar Ready Code — referenced throughout the Town's 2024 Building Code fact sheet for EV-ready parking, solar-ready zones, and electric-ready gas-appliance provisions
- Full Town Code Chapter 18 (Building Regulations) text hosted at townofcrestedbutte.colorado.gov (Town Code Chapter 18 Revised PDF, Supp. No. 22) and mirrored on library.municode.com/co/crested_butte
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family homes, duplexes, and accessory dwelling units within Town of Crested Butte limits. Reviewed under the 2024 IRC as locally amended (Town Code Chapter 18, Article 2), including the Town's Table R301.2 climatic design criteria (100 lbs/sq ft flat roof snow load, 115 mph wind design speed, 36-inch frost line, Seismic Design Category C), the all-electric building mandate, DOE Zero Energy Ready Home (ZERH) certification requirement, and mandatory BOZAR historic/design review approval before a building permit application may even be submitted.
Residential Addition / Remodel Permit
Required for additions and remodels to existing residential structures in Crested Butte. Reviewed under the 2024 IRC and International Existing Building Code (IEBC) as locally amended (Town Code Chapter 18, Articles 2 and 2.5); Level 3 alterations (renovating more than 50% of the work area) trigger additional electric-ready, EV-ready, and solar-ready requirements. BOZAR approval is required before submittal for any exterior-affecting work.
Electrical Permit
Required for electrical installation, alteration, or repair in Crested Butte. Governed by the 2023 National Electrical Code (NEC), adopted by Town Code Chapter 18, Article 5 with no local amendments. No standalone electrical permit fee schedule is published separately; electrical work fees are billed under the general Building Permit valuation-based fee table (Appendix A referenced in Town Code Sec. 18-5 fees provision).
Electric Vehicle Charging Station Permit
The Town of Crested Butte does not publish a standalone EV charger/EVSE permit application or fee line distinct from its general Electrical Permit -- checked the Building Department page, Town Code Chapter 18 Article 5 (Electrical Code), and the 2026 Fee Schedule directly; none name a separate EV charger permit or fee. Installing or retrofitting an EV charger (or completing the wiring to an already-provisioned EV-Ready circuit) is electrical work and is processed as a standard Electrical Permit under the 2023 NEC as adopted (Town Code Sec. 18-5), billed on the same valuation-based Building Permit fee table used for all electrical work in Crested Butte. This is distinct from the EV-Ready parking-space wiring mandate that applies automatically to new residential construction and Level 3 alterations (documented in this file's residential-building-permit and residential-addition-remodel entries) -- that mandate provisions the circuit/receptacle during new construction, while this entry covers permitting an EV charger installation itself, whether as part of new construction or a standalone retrofit to an existing home.
Plumbing Permit
Required for plumbing installation, alteration, or repair in Crested Butte. Governed by the 2021 International Plumbing Code (IPC), including Appendices C and E, adopted by Town Code Chapter 18, Article 4. The Town's Licensing & Permitting page publishes a combined Plumbing and Mechanical Permit Application for work such as water heater replacement, gas fireplaces, heat recovery ventilation systems, and kitchen hoods.
Mechanical / HVAC Permit
Required for heating, cooling, ventilation, and gas appliance installation or replacement in Crested Butte. Governed by the 2021 International Mechanical Code (IMC), including Appendix A, adopted by Town Code Chapter 18, Article 3, and the 2021 International Fuel Gas Code (IFGC) for gas-fired equipment, which mandates high-efficiency direct-vent sealed-combustion appliances only.
Roofing Permit (Re-Roof)
Required for re-roofing work in Crested Butte, reviewed under the 2024 IBC/IRC as adopted, with mandatory ice barrier underlayment per Table R301.2. If the parcel falls within a mapped Class 1/Class 2 Colorado Wildfire Resiliency Code fire hazard area and the re-roof replaces more than 25% of the existing roof covering, the entire roof must meet CWRC Class A roof-covering and valley-flashing requirements. BOZAR/historic design review applies to visible roofing material changes given the Town's historic district status.
Solar PV Permit
Required for solar photovoltaic installation in Crested Butte, using the Town's dedicated Solar Permit Application. Requires drawings showing panel locations, solar specifications with required emergency shut-off and electrical code requirements, and a structural engineer stamped letter confirming the existing roof will remain structurally sound. Because solar panels are exterior/visible improvements in a historic district, BOZAR approval is also required alongside the standard building permit process.
Building Relocation and Demolition Permit
Required to demolish or relocate any primary or accessory structure larger than 200 square feet in Crested Butte. This is a BOZAR-reviewed Development Permit process (Building Relocation and Demolition Permit Application), given the Town's National Historic District status, rather than a standalone Building Division demolition track.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 5units
5 buildings · $9M valuation
- Trailing 12 months
- 6units
12 of 12 months reported · #56 in Colorado coverage by units
- Year to date (2026 YTD through 2026-05)
- 5units
5 buildings · $9M valuation
5 month(s) reported to Census
- Full year 2025
- 4units
4 buildings · $5.1M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity
Tips & gotchas
- Crested Butte is a home-rule town with its OWN Building Department — Gunnison County itself holds no building-permit jurisdiction inside any incorporated town in the county (confirmed directly this session, not merely carried over from prior scoping). Mt. Crested Butte, a separate incorporated town nearby, runs its own distinct building department with its own (notably higher, 155 psf) snow load — do not conflate the two towns.
- BOZAR (Board of Zoning and Architectural Review) approval is a HARD PREREQUISITE to submitting a building permit application for essentially any project with exterior scope, per Town Code Sec. 18-13-40(b)/(d) — this is a genuinely distinct historic/design-review process from Building Division plan review, not a rubber-stamp attachment. The Town's own published schedule states all formally reviewed BOZAR projects take at least 2 months, covering staff review, two DRC meetings, two weeks of public notice, and a monthly BOZAR hearing.
- New construction in Crested Butte is subject to a genuinely aggressive all-electric mandate effective for permits from January 1, 2026: no combustion equipment for space heating, water heating, or cooking (narrow solid-fuel-fireplace exception), plus mandatory DOE Zero Energy Ready Home (ZERH) certification for residential and IgCC/electric-ready/solar-ready/EV-ready provisions for commercial. This is one of the more stringent electrification mandates found in this corpus to date.
- Design criteria (Table R301.2): 100 lbs/sq ft flat roof snow load, 115 mph wind design speed, Seismic Design Category C, 36-inch frost line, -16 F winter design temp, mandatory ice barrier underlayment, 3,500 air freezing index, 8,921 ft Manual J elevation — genuinely distinct from (and in several respects milder on snow load, harsher on winter design temp/air freezing index than) neighboring mountain-resort towns like Breckenridge or Telluride; do not reuse another jurisdiction's design table.
- The 2025 Colorado Wildfire Resiliency Code applies to Crested Butte via genuinely MAPPED Class 1 (lower intensity) and Class 2 (higher intensity) fire hazard zones per the State Wildfire Resiliency Map Viewer, enforcement beginning June 1, 2026 — this is a mapped-zone trigger, not a blanket town-wide requirement as adopted in some peer jurisdictions (e.g. Breckenridge). Slate and concrete roof tile are currently disallowed town-wide regardless of zone, per the Town's own Design Standards and Guidelines.
- A Gunnison County building contractor license (separate from any Town of Crested Butte business license) has been required on every building permit since February 1, 2023 — a countywide credential administered outside the Town itself.
- No standalone electrical, plumbing, or (mostly) mechanical permit fee schedule exists — most trade work is billed under the same general valuation-based Building Permit fee table (2026 Fee Schedule), except Mechanical Permit ($100 flat), Mechanical Exhaust Hood ($200 flat), and Solid Fuel Burning Device Application ($100 flat), which do carry their own flat fees.
- The Town publishes NO numeric Building Division plan-review turnaround for any standard permit type anywhere in Town Code Chapter 18, the 2026 Fee Schedule, or the Building Code Information/Fact Sheet pages. The only genuinely published, closely-adjacent numeric figures found were the BOZAR/DRC 'at least 2 months' design-review floor (a prerequisite gate, not Building Division review) and a standalone 30-day review commitment specific to the Outdoor Energy Usage (REMP) Permit application (Town Code Sec. 18-9-90(2)(c)) when NOT bundled into a building permit.
- Construction must be completed within 1 year of commencement (with up to a 6-month extension for good cause) or the building permit expires and a new permit — reflecting remaining work's valuation — must be obtained (Town Code Sec. 18-13-60).
- The Town's online permitting system was described on its own Licensing & Permitting page as 'Coming soon! Online permitting and payment by Cloudpermit' at the time of this research — applicants should confirm current submittal mechanics (paper/email vs. the new Cloudpermit portal) directly with the Building Department, since this is an active transition.
- The Town's public-facing domain migrated from crestedbutte-co.gov to townofcrestedbutte.colorado.gov (a live 301 redirect was confirmed during this research) — a handful of third-party-indexed snippets citing an older Building Department street address (508 Maroon Ave) could not be reconfirmed on the current live site and were deliberately NOT used in this file; the Town's own current permit-report letterhead (PO Box 39 for Building Department mail) was used instead.
- Accessory Dwelling Units and most fences/retaining walls are NOT modeled as standalone permitTypes in this file: ADUs run through the standard Building Permit / BOZAR process (with a genuine fee waiver available under a Qualified Resident restrictive covenant, Sec. 18-13-30(b)), and fences under 6 feet / retaining walls under 4 feet are explicitly exempt from requiring a building permit at all under locally amended IBC/IRC Sec. 105.2 — no separate Building Division fee/timeline track exists for either that would justify its own permitType entry.