Skip to main content
PermitBase

Crested Butte building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Crested Butte, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
507 Maroon Ave, Crested Butte, CO 81224 (Building Department mailing address: PO Box 39, Crested Butte, CO 81224)
Phone
(970) 349-5338
Office hours
Monday-Friday 8:30 a.m. to 5:00 p.m. Building Official Astrid Matison (ext. 116, amatison@crestedbutte-co.gov). Building Inspector Josh Staab (ext. 127, jstaab@crestedbutte-co.gov). Community Development Director Mel Yemma (ext. 119, melyemma@crestedbutte-co.gov). BOZAR/Planning questions: planning@crestedbutte-co.gov, (970) 349-5338 ext. 121.

Inspection guide

See how inspections work in Crested Butte — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2024 International Building Code (IBC), Chapters 1-35 without appendices — adopted by reference, Town Code Chapter 18, Article 1 (Sec. 18-1-10), pursuant to Title 31, Article 16, Part 2, C.R.S.
  • 2024 International Residential Code (IRC) — Town Code Chapter 18, Article 2 (Sec. 18-2-10), with extensive local amendments including an all-electric mandate and Table R301.2 climatic design data (Sec. 18-2-30)
  • International Existing Building Code (IEBC) — Town Code Chapter 18, Article 2.5
  • International Green Construction Code (IgCC), selected sections — Town Code Chapter 18, Article 1.5 (Sec. 18-1.5-30), applicable to new commercial construction
  • 2021 International Mechanical Code (IMC), including Appendix A — Town Code Chapter 18, Article 3 (Sec. 18-3-10)
  • 2021 International Plumbing Code (IPC), including Appendices C and E — Town Code Chapter 18, Article 4 (Sec. 18-4-10)
  • 2023 National Electrical Code (NEC) — Town Code Chapter 18, Article 5 (Sec. 18-5-10), adopted with no local amendments
  • 2024 International Fire Code (IFC), including Appendices B-M — Town Code Chapter 18, Article 6 (Sec. Show full text

    2024 International Fire Code (IFC), including Appendices B-M — Town Code Chapter 18, Article 6 (Sec. 18-6-10), adopted by Ordinance No. 9, Series 2025, § 2(Exh. A), effective September 15, 2025, superseding the 2021 IFC. Enforced with Crested Butte Fire Protection District (CBFPD) coordination; local amendments include IFC Sec. 507.1 as amended, requiring an approved monitored fire suppression system throughout any occupancy or structure wherever the water supply cannot provide the required fire flow (Occupancy R-3 single-family dwellings excepted), and IFC Appendix B105.1 as amended, setting a 1,500 gpm minimum fire-flow requirement for one- and two-family dwellings, R-3/R-4 buildings, and townhouses

  • 2025 Colorado Wildfire Resiliency Code (CWRC), 8 CCR 1507-39 — Town Code Chapter 18, Article 6.5 (Sec. 18-6.5-10), established statewide July 1, 2025; Town enforcement begins June 1, 2026 per the Town's own CWRC Summary Sheet
  • 2021 International Fuel Gas Code (IFGC), including Appendices — Town Code Chapter 18, Article 7 (Sec. 18-7-10), with local amendments requiring high-efficiency direct-vent sealed-combustion appliances only (deleting IFGC's alternative combustion-air provisions)
  • 2021 International Energy Conservation Code (IECC), without appendices — Town Code Chapter 18, Article 9, Sec. 18-9-40; new construction is additionally required to achieve DOE Zero Energy Ready Home (ZERH) certification per the Town's 2024 Building Code Information page and fact sheet, effective for permits starting January 1, 2026
  • Colorado Model Electric Ready and Solar Ready Code — referenced throughout the Town's 2024 Building Code fact sheet for EV-ready parking, solar-ready zones, and electric-ready gas-appliance provisions
  • Full Town Code Chapter 18 (Building Regulations) text hosted at townofcrestedbutte.colorado.gov (Town Code Chapter 18 Revised PDF, Supp. No. 22) and mirrored on library.municode.com/co/crested_butte

Permit types & fees

Crested Butte's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Crested Butte yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Crested Butte lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
0units

0 buildings · $0 valuation

Trailing 12 months
6units

12 of 12 months reported · #64 in Colorado coverage by units

Year to date (2026 YTD through 2026-07)
5units

5 buildings · $9.6M valuation

7 month(s) reported to Census

Full year 2025
4units

4 buildings · $5.1M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Crested Butte is a home-rule town with its OWN Building Department — Gunnison County itself holds no building-permit jurisdiction inside any incorporated town in the county. Mt. Crested Butte, a separate incorporated town nearby, runs its own distinct building department with its own (notably higher, 155 psf) snow load — do not conflate the two towns.
  • BOZAR (Board of Zoning and Architectural Review) approval is a HARD PREREQUISITE to submitting a building permit application for essentially any project with exterior scope, per Town Code Sec. 18-13-40(b)/(d) — this is a genuinely distinct historic/design-review process from Building Division plan review, not a rubber-stamp attachment. The Town's own published schedule states all formally reviewed BOZAR projects take at least 2 months, covering staff review, two DRC meetings, two weeks of public notice, and a monthly BOZAR hearing.
  • New construction in Crested Butte is subject to an all-electric mandate for permits from January 1, 2026: no combustion equipment for space heating, water heating, or cooking, with a narrow solid-fuel fireplace exception. Residential projects must also achieve DOE Zero Energy Ready Home (ZERH) certification, and commercial projects must meet IgCC plus electric-ready, solar-ready, and EV-ready provisions. Size the electrical service and select equipment around this before ordering anything gas-fired.
  • Design criteria (Table R301.2): 100 lbs/sq ft flat roof snow load, 115 mph wind design speed, Seismic Design Category C, 36-inch frost line, -16 F winter design temp, mandatory ice barrier underlayment, 3,500 air freezing index, 8,921 ft Manual J elevation — genuinely distinct from (and in several respects milder on snow load, harsher on winter design temp/air freezing index than) neighboring mountain-resort towns like Breckenridge or Telluride; do not reuse another jurisdiction's design table.
  • The 2025 Colorado Wildfire Resiliency Code applies in Crested Butte only within mapped Class 1 (lower intensity) and Class 2 (higher intensity) fire hazard zones per the State Wildfire Resiliency Map Viewer, with enforcement beginning June 1, 2026. Check your parcel on the map viewer -- this is a mapped-zone trigger, not a blanket town-wide requirement the way Breckenridge adopted it. Separately, slate and concrete roof tile are disallowed town-wide regardless of zone, under the Town's Design Standards and Guidelines.
  • A Gunnison County building contractor license (separate from any Town of Crested Butte business license) has been required on every building permit since February 1, 2023 — a countywide credential administered outside the Town itself.
  • No standalone electrical, plumbing, or (mostly) mechanical permit fee schedule exists — most trade work is billed under the same general valuation-based Building Permit fee table (2026 Fee Schedule), except Mechanical Permit ($100 flat), Mechanical Exhaust Hood ($200 flat), and Solid Fuel Burning Device Application ($100 flat), which do carry their own flat fees.
  • The Town publishes NO numeric Building Division plan-review turnaround for any standard permit type anywhere in Town Code Chapter 18, the 2026 Fee Schedule, or the Building Code Information/Fact Sheet pages. The only genuinely published, closely-adjacent numeric figures found were the BOZAR/DRC 'at least 2 months' design-review floor (a prerequisite gate, not Building Division review) and a standalone 30-day review commitment specific to the Outdoor Energy Usage (REMP) Permit application (Town Code Sec. 18-9-90(2)(c)) when NOT bundled into a building permit.
  • Construction must be completed within 1 year of commencement (with up to a 6-month extension for good cause) or the building permit expires and a new permit — reflecting remaining work's valuation — must be obtained (Town Code Sec. 18-13-60).
  • The Town's Licensing & Permitting page describes its online permitting system as 'Coming soon! Online permitting and payment by Cloudpermit.' Confirm current submittal mechanics — paper/email versus the Cloudpermit portal — with the Building Department, since this is an active transition.
  • The Town's public-facing domain moved from crestedbutte-co.gov to townofcrestedbutte.colorado.gov, and the old domain now 301-redirects to the new one. Third-party listings still show an older Building Department street address, 508 Maroon Ave, that does not appear on the Town's current site; use the address on the Town's own permit-report letterhead instead — PO Box 39 for Building Department mail.
  • Accessory Dwelling Units and most fences/retaining walls are NOT modeled as standalone permitTypes in this record: ADUs run through the standard Building Permit / BOZAR process (with a genuine fee waiver available under a Qualified Resident restrictive covenant, Sec. 18-13-30(b)), and fences under 6 feet / retaining walls under 4 feet are explicitly exempt from requiring a building permit at all under locally amended IBC/IRC Sec. 105.2 — no separate Building Division fee/timeline track exists for either that would justify its own permitType entry.

Comparable nearby cities

Mount Crested Butte
Both in Gunnison County10 shared permit types~3 mi away
Compare fees →
Aspen
13 shared permit types~24 mi away
Compare fees →
Glenwood Springs
13 shared permit types~51 mi away
Compare fees →