Crested Butte building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Crested Butte, Colorado.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 507 Maroon Ave, Crested Butte, CO 81224 (Building Department mailing address: PO Box 39, Crested Butte, CO 81224)
- Phone
- (970) 349-5338
- Office hours
- Monday-Friday 8:30 a.m. to 5:00 p.m. Building Official Astrid Matison (ext. 116, amatison@crestedbutte-co.gov). Building Inspector Josh Staab (ext. 127, jstaab@crestedbutte-co.gov). Community Development Director Mel Yemma (ext. 119, melyemma@crestedbutte-co.gov). BOZAR/Planning questions: planning@crestedbutte-co.gov, (970) 349-5338 ext. 121.
- Website
- Official site
Published scheduling rules
- Inspection requests must be submitted at least 5 working days in advance (adopted IFC Sec. 108.2.1) (Electrical Permit)
- Inspection requests must be submitted at least 5 working days in advance (adopted IFC Sec. 108.2.1) (Electric Vehicle Charging Station Permit)
- Inspection requests must be submitted at least 5 working days in advance (Plumbing Permit)
- Inspection requests must be submitted at least 5 working days in advance (Roofing Permit (Re-Roof))
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation
Before concrete pour, per 36-inch minimum frost line depth
- 2
Rough Frame
Framing complete before cover
- 3
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment; inspection requests must be submitted at least 5 working days in advance (adopted IFC Sec. 108.2.1)
- 4
Final Building Inspection / Certificate of Occupancy
Exterior construction must be completed within 1 year of commencement (6-month extension available for good cause) or the permit expires
Applies to: Residential Addition / Remodel Permit
- 1
Rough Frame
Framing/structural modifications complete before cover
- 2
Rough Electrical / Plumbing / Mechanical
Trade rough-ins before concealment; 5 working days advance notice required
- 3
Final Building Inspection
Applies to: Electric Vehicle Charging Station Permit
- 1
Rough Electrical
New circuit/wiring for the charger installed before concealment; 5 working days advance notice required
- 2
Final Electrical
Charger installed and connected, circuit verified before energizing
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring and panel installed before concealment; 5 working days advance notice required
- 2
Final Electrical
Applies to: Mechanical / HVAC Permit
- 1
Rough Mechanical
Ductwork, flues, and equipment placement before concealment; 5 working days advance notice required
- 2
Final Mechanical
Applies to: Plumbing Permit
- 1
Rough Plumbing
Before concealment; 5 working days advance notice required
- 2
Final Plumbing
Applies to: Roofing Permit (Re-Roof)
- 1
Underlayment and Flashing Inspection
Ice barrier underlayment and valley flashing verified before roof covering installation is completed
- 2
Final Building Inspection
Applies to: Solar PV Permit
- 1
Rough/Structural Inspection
Racking and roof attachment verified before panel installation is completed
- 2
Final Electrical / Final Building Inspection
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Crested Butte building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Crested Butte building permits
Get alerts for Crested Butte
We'll email you when Crested Butte's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.