Change of Use Permit in Crested Butte, Colorado

Crested Butte has no standalone 'change of use permit' by that name. A change of use is instead folded directly into the Town's single Building Permit requirement: Town Code Sec. 18-13-40(a) requires a building permit before any structure is 'erected, constructed, structurally altered, moved, demolished or changed,' and the Town's own issued-permit reporting system tracks these projects with a distinct classification — 'Commercial Change of Use' — within the same BLD permit series used for new construction and alterations. This is confirmed by a real worked example from the Town's own Custom City Report: permit BLD2026-00008 at 129 Elk Ave (applicant Pinnacle Inc.), received 02/04/2026 and issued 02/06/2026 at a $342,000 valuation, tracked with Type of Use 'Commercial,' Type of Work 'Alteration,' and Type of Permit 'Commercial Change of Use.' This entry gives change-of-use its own dedicated reference; the underlying process is otherwise identical to this file's commercial-building-permit entry.

Verified 2026-08-13 · Source

When you need this permit

  • No standalone 'change of use permit' application exists; a change of use is processed through the Town's single Building Permit application under Town Code Sec. 18-13-40(a), which requires a permit before a structure is 'erected, constructed, structurally altered, moved, demolished or changed'
  • The Town's own issued-permit reports classify these projects as 'Commercial Change of Use,' distinct from but processed alongside 'Alteration Level 1 Commercial' and 'Alteration Level 2 Commercial' within the same BLD permit tracking series — confirmed via a real issued example (BLD2026-00008, 129 Elk Ave, Pinnacle Inc., received 02/04/2026, issued 02/06/2026, $342,000 valuation)
  • Any building permit located in the B1, B2, or B3 Business Districts is automatically classified 'special review' at BOZAR (Town Code Sec. 16-22-110(b)), applying the same $750 surcharge and published 3-D perspective drawing requirement documented in this file's commercial-building-permit entry to a change of use in the historic downtown core exactly as it would to new construction or alteration
  • The Colorado Wildfire Resiliency Code (Town Code Article 6.5) explicitly lists 'changes of use' among its enumerated triggers, alongside new construction, moved structures, additions increasing footprint 500+ sq ft, and replacement of more than 25% of exterior siding or roof covering — a change of use inside a mapped Class 1/Class 2 CWRC fire hazard zone can trigger structure-hardening compliance once Town enforcement begins June 1, 2026
  • Interior-only changes of use judged 'insubstantial' by the Building Inspector and a designated BOZAR member (evaluated on street visibility, extent of change relative to the structure, and neighborhood effect, per Town Code Sec. 16-1-20/16-22-100(a)) can skip the full BOZAR hearing and public notice, paying only the $120 Insubstantial Design Review - DRC fee — the same fast path already documented in this file's commercial-building-permit entry for interior tenant improvements generally
  • Billed under the same valuation-based Building Permit fee table as any other permit type (2026 Fee Schedule) — no standalone 'change of use' fee line is published; a change of use involving little or no construction valuation still pays at minimum the base Building Permit fee tier ($28.42) plus applicable plan review
  • Current Gunnison County building contractor license required for all contractors on the permit, same as any other Building Permit (Town Code Sec. 18-13-40(e)) Contractor
  • All construction documents for commercial projects (where construction accompanies the change of use) must be prepared, signed and seal-stamped by Colorado registered or licensed design professionals (Town Code Sec. 18-13-20(a)(16))
  • Certificate of occupancy required before the space may be rented, occupied, or used where the change of use involves construction (Town Code Sec. 18-13-70)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — valuation $1.00 to $500.00 (minimum tier)2026 Town of Crested Butte Fee Schedule (Exhibit A) — same valuation-based table used for all Building Permit types in this file; a change of use with little or no construction valuation still pays at minimum this base tier
$28.42
Plan Review Fee (Commercial)Same commercial plan review rate documented in this file's commercial-building-permit entry
60% of Permit Fee
Insubstantial Design Review - DRCFast path for interior-only changes of use judged to have little/no visible impact, per Town Code Sec. 16-1-20/16-22-100(a)
$120.00
BOZAR Special Review Classification surchargeAutomatic for any permit — including a change of use — located in the B1/B2/B3 Business Districts (Town Code Sec. 16-22-110(b))
$750.00 additional

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use Permit permit actually take in Crested Butte?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Building Inspection / Certificate of Occupancy

    Required before the space may be rented, occupied, or used, where the change of use is accompanied by construction work (Town Code Sec. 18-13-70); a change of use with no construction scope may not require a separate physical inspection beyond the Building Official's use classification sign-off — this file found no published Building Division procedure describing that narrower case specifically

See the full Crested Butte inspection guide — scheduling & re-inspection fees →

Tips

  • Crested Butte doesn't run a lighter-weight review track for a change of use — it's a use-type classification within the same single Building Permit application and process as new construction and alterations, carrying the same BOZAR/CWRC exposure documented in this file's commercial-building-permit entry, not a separate, simpler process.
  • A change of use with little or no construction scope still needs a Building Permit under Sec. 18-13-40(a)'s 'or changed' language and still pays at least the minimum valuation-tier permit fee — don't assume a paperwork-only conversion (e.g., retail to office) skips permitting entirely.
  • Confirm early whether your change of use is interior-only (a real shot at the $120 'insubstantial' BOZAR fast path) or automatically triggers the $750 special review classification by sitting in the B1/B2/B3 Business Districts — the difference materially changes both cost and process.
  • If your change of use falls in a mapped Colorado Wildfire Resiliency Code Class 1/Class 2 hazard zone, it is explicitly one of the CWRC's enumerated triggers — confirm parcel-level mapping via the State Wildfire Resiliency Map Viewer before assuming a use conversion alone won't pull in structure-hardening requirements.

Frequently asked questions

Crested Butte requires a change of use permit for: No standalone 'change of use permit' application exists; a change of use is processed through the Town's single Building Permit application under Town Code Sec. 18-13-40(a), which requires a permit before a structure is 'erected, constructed, structurally altered, moved, demolished or changed'; The Town's own issued-permit reports classify these projects as 'Commercial Change of Use,' distinct from but processed alongside 'Alteration Level 1 Commercial' and 'Alteration Level 2 Commercial' within the same BLD permit tracking series — confirmed via a real issued example (BLD2026-00008, 129 Elk Ave, Pinnacle Inc., received 02/04/2026, issued 02/06/2026, $342,000 valuation); Any building permit located in the B1, B2, or B3 Business Districts is automatically classified 'special review' at BOZAR (Town Code Sec. 16-22-110(b)), applying the same $750 surcharge and published 3-D perspective drawing requirement documented in this file's commercial-building-permit entry to a change of use in the historic downtown core exactly as it would to new construction or alteration; The Colorado Wildfire Resiliency Code (Town Code Article 6.5) explicitly lists 'changes of use' among its enumerated triggers, alongside new construction, moved structures, additions increasing footprint 500+ sq ft, and replacement of more than 25% of exterior siding or roof covering — a change of use inside a mapped Class 1/Class 2 CWRC fire hazard zone can trigger structure-hardening compliance once Town enforcement begins June 1, 2026; Interior-only changes of use judged 'insubstantial' by the Building Inspector and a designated BOZAR member (evaluated on street visibility, extent of change relative to the structure, and neighborhood effect, per Town Code Sec. 16-1-20/16-22-100(a)) can skip the full BOZAR hearing and public notice, paying only the $120 Insubstantial Design Review - DRC fee — the same fast path already documented in this file's commercial-building-permit entry for interior tenant improvements generally; Billed under the same valuation-based Building Permit fee table as any other permit type (2026 Fee Schedule) — no standalone 'change of use' fee line is published; a change of use involving little or no construction valuation still pays at minimum the base Building Permit fee tier ($28.42) plus applicable plan review; Current Gunnison County building contractor license required for all contractors on the permit, same as any other Building Permit (Town Code Sec. 18-13-40(e)); All construction documents for commercial projects (where construction accompanies the change of use) must be prepared, signed and seal-stamped by Colorado registered or licensed design professionals (Town Code Sec. 18-13-20(a)(16)); Certificate of occupancy required before the space may be rented, occupied, or used where the change of use involves construction (Town Code Sec. 18-13-70). If your project isn't listed, confirm with Town of Crested Butte Building Department (Community Development Department) at (970) 349-5338 before starting work.

In Crested Butte, the published Building Permit Fee — valuation $1.00 to $500.00 (minimum tier) is: $28.42. Additional published fees: Plan Review Fee (Commercial) — 60% of Permit Fee; Insubstantial Design Review - DRC — $120.00; BOZAR Special Review Classification surcharge — $750.00 additional. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

No numeric SLA is published. A real example from the Town's own permit report (BLD2026-00008, 129 Elk Ave) shows a 2-day gap between received and issued dates, but this is a single data point, not a guaranteed turnaround. Where BOZAR review is triggered, the Town's published BOZAR clocks (60-90 days, or 'at least 2 months' generally) apply instead.

You'll need: Building Permit Application; BOZAR Development Permit Application; Gunnison County Building Contractor License. Depending on your project, Crested Butte may also ask for: Sealed commercial construction documents. See the required-documents checklist on this page for details on each.

Crested Butte requires 1 inspection(s) for a change of use permit, in order: Final Building Inspection / Certificate of Occupancy. Schedule each through Town of Crested Butte Building Department (Community Development Department) ((970) 349-5338).

Apply through Town of Crested Butte Building Department (Community Development Department) at 507 Maroon Ave, Crested Butte, CO 81224 (Building Department mailing address: PO Box 39, Crested Butte, CO 81224). Phone: (970) 349-5338, email: building@crestedbutte-co.gov. Office hours: Monday-Friday 8:30 a.m. to 5:00 p.m. Building Official Astrid Matison (ext. 116, amatison@crestedbutte-co.gov). Building Inspector Josh Staab (ext. 127, jstaab@crestedbutte-co.gov). Community Development Director Mel Yemma (ext. 119, melyemma@crestedbutte-co.gov). BOZAR/Planning questions: planning@crestedbutte-co.gov, (970) 349-5338 ext. 121.. Official information: https://townofcrestedbutte.colorado.gov/planning-permitting/community-development.

No. Town Code Sec. 18-13-40(a) folds 'changed' use into the same Building Permit requirement as new construction, alteration, or demolition. The Town's own issued-permit reports track these projects separately as 'Commercial Change of Use' within the same BLD permit series, but there is no distinct application or process.

If the property sits in the B1, B2, or B3 Business Districts, yes — it's automatically classified 'special review' at BOZAR with a $750 surcharge, the same as new construction or alteration in those districts. Interior-only conversions with little visible impact can instead potentially clear the $120 insubstantial-determination fast path.