This is PermitBase’s published record for Crested Butte as of 2026-08-13. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Crested Butte building permits
VerifiedCrested Butte, Colorado — as published 2026-08-13.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family homes, duplexes, and accessory dwelling units within Town of Crested Butte limits. Reviewed under the 2024 IRC as locally amended (Town Code Chapter 18, Article 2), including the Town's Table R301.2 climatic design criteria (100 lbs/sq ft flat roof snow load, 115 mph wind design speed, 36-inch frost line, Seismic Design Category C), the all-electric building mandate, DOE Zero Energy Ready Home (ZERH) certification requirement, and mandatory BOZAR historic/design review approval before a building permit application may even be submitted.
Verified 2026-07-06 · Source
Requirements
- BOZAR approval (Development Permit Application) REQUIRED before a building permit application may be submitted (Town Code Sec. 18-13-10(b), 18-13-40(b)/(d)) — a narrow foundation-only early-start exception exists under specific conditions
- Engineering plans for single/two-family residences must be prepared by a Colorado-registered or licensed design professional and signed/stamped with a seal (Town Code Sec. 18-13-20(a)(15))
- Must meet Table R301.2 design criteria: 100 lbs/sq ft flat roof snow load, 115 mph wind design speed (Exposure/topographic effects: none), Seismic Design Category C, 36-inch minimum frost line depth, mandatory roof ice barrier underlayment, -16 F winter design temperature, 8,921 ft Manual J elevation
- All-electric building: no combustion equipment for space heating, water heating, or cooking appliances (exception: EPA Phase 2 qualified solid fuel-burning devices per Article 8)
- New residential construction must achieve DOE Zero Energy Ready Home (ZERH) certification
- One EV-Ready parking space per dwelling unit (208/240V, 30A receptacle, labeled 'Electric Vehicle Charging' branch circuit)
- Single-family dwellings are exempt from automatic fire sprinkler requirements; shared-wall units (duplex/triplex/quadplex/multifamily) must meet IFC Chapter 9 / IRC P2904 sprinkler provisions
- If located within a mapped Class 1 or Class 2 Colorado Wildfire Resiliency Code fire hazard area (confirm via the State Wildfire Resiliency Map Viewer), must meet CWRC structure-hardening requirements: Class A metal roof covering, No. 26 gage galvanized valley flashing, noncombustible gutters/vents, fire-resistance-rated exterior walls
- Current Gunnison County building contractor license required for all contractors on the permit (Town Code Sec. 18-13-40(e), in effect since February 1, 2023)
- Complete Sec. 18-13-20 submittal package: legal description, deed, plot plan, elevations, floor plan, site development plan, front elevation showing site context, contour depiction if grade varies more than 2 vertical feet
- Valuation determined via ICC minimum valuation table x 2.70 regional modifier, or other evidence of value, whichever is greater
Required documents
- RequiredBOZAR Development Permit ApplicationMust be approved before the building permit application is submitted
- RequiredBuilding Permit ApplicationSubmitted to the Building Department; requires Sec. 18-13-20 submittal package
- RequiredMaterials List Form - Primary StructureRequired for construction on a new or existing primary building; referenced during inspections
- RequiredGunnison County Building Contractor License
- RequiredEENH/ZERH Certification DocumentationHERS rater engagement, EENH Partner and Energy Star Partner registration required before permit issuance
- OptionalStatement of Authority FormRequired if the property is owned by an LLC or other entity
- OptionalLimited Power of AttorneyRequired if the applicant is not the property owner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1.00 to $500.00 | $28.42 | 2026 Town of Crested Butte Fee Schedule (Exhibit A), effective January 1, 2026, adopted by Resolution 34, Series 2025 |
| Building Permit Fee — valuation $501.00 to $2,000.00 | $28.42 plus $3.68 per $100 of TSV or fraction thereof above $501 | — |
| Building Permit Fee — valuation $2,001.00 to $25,000.00 | $83.74 plus $16.95 per $1,000 of TSV or fraction thereof above $2,001 | — |
| Building Permit Fee — valuation $25,001.00 to $50,000.00 | $473.79 plus $12.18 per $1,000 of TSV or fraction thereof above $25,001 | — |
| Building Permit Fee — valuation $50,001.00 to $100,000.00 | $778.58 plus $8.47 per $1,000 of TSV or fraction thereof above $50,001 | — |
| Building Permit Fee — valuation $100,001.00 to $500,000.00 | $1,202.07 plus $6.77 per $1,000 of TSV or fraction thereof above $100,001 | — |
| Building Permit Fee — valuation $500,001.00 to $1,000,000.00 | $3,911.05 plus $5.74 per $1,000 of TSV or fraction thereof above $500,001 | — |
| Building Permit Fee — valuation $1,000,001.00 to $5,000,000.00 | $6,681.04 plus $3.00 per $1,000 of TSV or fraction thereof above $1,000,001 | — |
| Building Permit Fee — valuation $5,000,001.00 and over | $18,327 plus $1.00 per $1,000 of TSV or fraction thereof above $5,000,001 | — |
| Plan Review Fee | 30% of Permit Fee (Residential) / 60% of Permit Fee (Commercial) | 2026 Fee Schedule |
| Use Tax Deposit | Not less than 4.5% of 60% of Total Project Valuation | — |
| Performance Deposit | 0.50% of Total Structure Value | — |
| Work without Permit | $250 to $1,000 per day, plus applicable permit fee | — |
Residential Addition / Remodel Permit
VerifiedRequired for additions and remodels to existing residential structures in Crested Butte. Reviewed under the 2024 IRC and International Existing Building Code (IEBC) as locally amended (Town Code Chapter 18, Articles 2 and 2.5); Level 3 alterations (renovating more than 50% of the work area) trigger additional electric-ready, EV-ready, and solar-ready requirements. BOZAR approval is required before submittal for any exterior-affecting work.
Verified 2026-07-06 · Source
Requirements
- BOZAR Development Permit Application approval required before submitting the building permit application for any project with exterior changes, additions, or historic rehabilitation
- All residential remodels must adhere to the 2024 International Existing Building Code (IEBC)
- Level 3 alterations (more than 50% of work area renovated, per the floor-plan-based work-area definition) additionally require: EV-Ready parking space per dwelling unit; Electric Ready gas-appliance circuit/panel provisions if gas equipment is retained; Solar Ready zone per the Colorado Model Electric Ready and Solar Ready Code
- Historic buildings undergoing a Level 3 alteration must meet the 2024 IECC without damaging the existing historic structure, and require both BOZAR and Building Official oversight
- Optional Home Energy Assessment subsidy available from the Town for Level 3 remodels
- If the addition increases footprint by 500 sq ft or more, or replaces more than 25% of exterior siding/roof covering, and the parcel falls within a mapped Class 1/Class 2 CWRC fire hazard area, full Colorado Wildfire Resiliency Code structure-hardening compliance is triggered for the affected assemblies
- Current Gunnison County building contractor license required for all contractors on the permit
- Materials List Form (Primary or Accessory Structure) required, referenced during inspections
Required documents
- RequiredBOZAR Development Permit ApplicationRequired for exterior changes, additions, and historic rehabilitation projects
- RequiredBuilding Permit Application
- RequiredMaterials List Form (Primary or Accessory Structure)
- RequiredGunnison County Building Contractor License
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-based schedule as new construction) | $28.42 minimum, scaling per the valuation tiers in the 2026 Fee Schedule | Effective January 1, 2026 |
| Plan Review Fee | 30% of Permit Fee (Residential) | — |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair in Crested Butte. Governed by the 2023 National Electrical Code (NEC), adopted by Town Code Chapter 18, Article 5 with no local amendments. No standalone electrical permit fee schedule is published separately; electrical work fees are billed under the general Building Permit valuation-based fee table (Appendix A referenced in Town Code Sec. 18-5 fees provision).
Verified 2026-07-06 · Source
Requirements
- Governed by the 2023 NEC as adopted, with no local amendments (Town Code Sec. 18-5-30: 'The code adopted herein is modified by the following amendments: None.')
- Current Gunnison County building contractor license required
- Fees billed under the same valuation-based Building Permit fee table as building permits; no separate electrical-specific fee line item found in the 2026 Fee Schedule
- Inspection requests must be submitted at least 5 working days in advance (adopted IFC Sec. 108.2.1)
Required documents
- RequiredElectrical Permit ApplicationReferences the associated building permit if applicable
- RequiredGunnison County Building Contractor License
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Fee (valuation-based, same table as Building Permit) | Per the 2026 Fee Schedule's Building Permit valuation tiers | No standalone electrical permit fee schedule is published separately in the 2026 Fee Schedule; billed under the general valuation-based table |
| Plan Review Fee | 30% of Permit Fee (Residential) / 60% (Commercial) | — |
| Reinspection Fee | $65.00/hour, minimum two-hour charge | — |
Electric Vehicle Charging Station Permit
VerifiedThe Town of Crested Butte does not publish a standalone EV charger/EVSE permit application or fee line distinct from its general Electrical Permit -- checked the Building Department page, Town Code Chapter 18 Article 5 (Electrical Code), and the 2026 Fee Schedule directly; none name a separate EV charger permit or fee. Installing or retrofitting an EV charger (or completing the wiring to an already-provisioned EV-Ready circuit) is electrical work and is processed as a standard Electrical Permit under the 2023 NEC as adopted (Town Code Sec. 18-5), billed on the same valuation-based Building Permit fee table used for all electrical work in Crested Butte. This is distinct from the EV-Ready parking-space wiring mandate that applies automatically to new residential construction and Level 3 alterations (documented in this file's residential-building-permit and residential-addition-remodel entries) -- that mandate provisions the circuit/receptacle during new construction, while this entry covers permitting an EV charger installation itself, whether as part of new construction or a standalone retrofit to an existing home.
Verified 2026-07-20 · Source
Requirements
- Governed by the 2023 NEC as adopted, with no local amendments (Town Code Sec. 18-5-30: 'The code adopted herein is modified by the following amendments: None'), including NEC Article 625 (Electric Vehicle Power Transfer System)
- For NEW residential construction and Level 3 alterations (more than 50% of work area renovated), a labeled 'Electric Vehicle Charging' branch circuit with a 208/240V, 30A receptacle in the garage or within 6 feet of the driveway is already a mandatory requirement of the underlying Building/Electrical Permit -- see this file's residential-building-permit and residential-addition-remodel entries
- For a STANDALONE EV charger retrofit to an existing home not otherwise triggering a Level 3 alteration, a standard Electrical Permit is required for the new circuit/charger installation
- Current Gunnison County building contractor license required for contractor-performed work
- Fees billed under the same valuation-based Building Permit fee table as other electrical work; no separate EV-charger-specific fee line item found in the 2026 Fee Schedule
- Inspection requests must be submitted at least 5 working days in advance (adopted IFC Sec. 108.2.1)
Required documents
- RequiredElectrical Permit ApplicationSame form used for any electrical work, including a standalone EV charger installation; references the associated building permit if applicable
- OptionalGunnison County Building Contractor License
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Fee (valuation-based, same table as Building Permit) | Per the 2026 Fee Schedule's Building Permit valuation tiers | No standalone EV-charger or electrical-specific fee schedule is published separately in the 2026 Fee Schedule; billed under the general valuation-based table, the same mechanism documented in this file's electrical-permit entry |
| Plan Review Fee | 30% of Permit Fee (Residential) / 60% (Commercial) | — |
| Reinspection Fee | $65.00/hour, minimum two-hour charge | — |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair in Crested Butte. Governed by the 2021 International Plumbing Code (IPC), including Appendices C and E, adopted by Town Code Chapter 18, Article 4. The Town's Licensing & Permitting page publishes a combined Plumbing and Mechanical Permit Application for work such as water heater replacement, gas fireplaces, heat recovery ventilation systems, and kitchen hoods.
Verified 2026-07-06 · Source
Requirements
- Governed by the 2021 IPC (Appendices C and E) as locally adopted
- Combined Plumbing and Mechanical Permit Application used for scopes including replacement of existing water heaters, gas fireplaces, heat recovery ventilation systems, and kitchen hoods — applicants are directed to consult the Building Inspector to confirm the correct application for their project
- Current Gunnison County building contractor license required
- Inspection requests must be submitted at least 5 working days in advance
Required documents
- RequiredPlumbing and Mechanical Permit ApplicationCombined application form used for plumbing and mechanical scopes
- RequiredGunnison County Building Contractor License
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Fee (valuation-based, same table as Building Permit) | Per the 2026 Fee Schedule's Building Permit valuation tiers | No standalone plumbing permit fee schedule is published separately |
| Plan Review Fee | 30% of Permit Fee (Residential) / 60% (Commercial) | — |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, ventilation, and gas appliance installation or replacement in Crested Butte. Governed by the 2021 International Mechanical Code (IMC), including Appendix A, adopted by Town Code Chapter 18, Article 3, and the 2021 International Fuel Gas Code (IFGC) for gas-fired equipment, which mandates high-efficiency direct-vent sealed-combustion appliances only.
Verified 2026-07-06 · Source
Requirements
- Governed by the 2021 IMC (Appendix A) as locally adopted
- Gas-fired equipment governed by the 2021 IFGC as locally amended: all installed fuel gas burning appliances must be high-efficiency direct-vent appliances with sealed combustion (Town Code Sec. 18-7-30(3)); several standard IFGC combustion-air provisions (Sections 304.2, 304.3, 304.5-304.8) are deleted in favor of manufacturer installation instructions
- Combined Plumbing and Mechanical Permit Application used for common scopes including gas fireplaces, heat recovery ventilation systems, and kitchen exhaust hoods
- Boiler/Compressor/Absorption System and Mechanical Exhaust Hood have their own flat fee line items in the 2026 Fee Schedule
- Current Gunnison County building contractor license required
Required documents
- RequiredPlumbing and Mechanical Permit Application
- RequiredGunnison County Building Contractor License
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit | $100.00 | 2026 Town of Crested Butte Fee Schedule (Exhibit A), effective January 1, 2026 |
| Mechanical Exhaust Hood | $200.00 | — |
| Solid Fuel Burning Device Application | $100.00 | — |
Roofing Permit (Re-Roof)
VerifiedRequired for re-roofing work in Crested Butte, reviewed under the 2024 IBC/IRC as adopted, with mandatory ice barrier underlayment per Table R301.2. If the parcel falls within a mapped Class 1/Class 2 Colorado Wildfire Resiliency Code fire hazard area and the re-roof replaces more than 25% of the existing roof covering, the entire roof must meet CWRC Class A roof-covering and valley-flashing requirements. BOZAR/historic design review applies to visible roofing material changes given the Town's historic district status.
Verified 2026-07-06 · Source
Requirements
- Roof Ice Barrier Underlayment Required: Yes, per Table R301.2 (Town Code Sec. 18-2-30(3))
- If the parcel is within a mapped CWRC Class 1 or Class 2 fire hazard zone and the project replaces more than 25% of the existing roof covering, the ENTIRE roof must meet CWRC structure-hardening requirements: Class A roof covering (metal only — slate and concrete tile are currently not allowed per the Town's Design Standards and Guidelines), No. 26 gage galvanized valley flashing over 36-inch minimum underlayment, noncombustible gutters/downspouts with leaf guards, fire-resistance-rated or noncombustible fascia/soffit materials, and noncombustible ember-resistant vent mesh (1/8-1/16 inch)
- BOZAR/Design Review Committee approval is required for exterior roofing material changes since Crested Butte is a National Historic District town; consult the Design Guidelines by zone
- Current Gunnison County building contractor license required
- Inspection requests must be submitted at least 5 working days in advance
Required documents
- RequiredBuilding Permit Application — Roofing scope
- RequiredBOZAR Development Permit ApplicationRequired for visible/exterior roofing material or design changes
- RequiredGunnison County Building Contractor License
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, same table as new construction) | $28.42 minimum, scaling per the 2026 Fee Schedule valuation tiers | No standalone flat re-roof fee is published; billed under the general valuation-based Building Permit fee table based on roofing project valuation |
| Plan Review Fee | 30% of Permit Fee (Residential) / 60% (Commercial) | — |
Solar PV Permit
VerifiedRequired for solar photovoltaic installation in Crested Butte, using the Town's dedicated Solar Permit Application. Requires drawings showing panel locations, solar specifications with required emergency shut-off and electrical code requirements, and a structural engineer stamped letter confirming the existing roof will remain structurally sound. Because solar panels are exterior/visible improvements in a historic district, BOZAR approval is also required alongside the standard building permit process.
Verified 2026-07-06 · Source
Requirements
- Use the Town's Solar Permit Application specifically for solar-only projects
- Submittal must include drawings showing solar panel locations, solar specifications including required emergency shut-off and electrical code compliance, and a structural engineer stamped letter confirming the existing roof will remain structurally sound
- Per Town Code Sec. 18-9-100(3)(b), if a proposed renewable energy system used to offset outdoor energy usage (REMP) is solar in nature, the panels/collectors must be approved through the standard building permit process AND approved by the Board (BOZAR)
- Current Gunnison County building contractor license required
- Governed by the 2023 NEC (electrical) and applicable structural provisions of the 2024 IBC/IRC
Required documents
- RequiredSolar Permit Application
- RequiredStructural Engineer Stamped LetterConfirms existing roof will remain structurally sound
- RequiredGunnison County Building Contractor License
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Fee (valuation-based, same table as Building Permit) | Per the 2026 Fee Schedule's Building Permit valuation tiers | No standalone solar-specific flat fee is published; billed under the general fee schedule |
Building Relocation and Demolition Permit
VerifiedRequired to demolish or relocate any primary or accessory structure larger than 200 square feet in Crested Butte. This is a BOZAR-reviewed Development Permit process (Building Relocation and Demolition Permit Application), given the Town's National Historic District status, rather than a standalone Building Division demolition track.
Verified 2026-07-06 · Source
Requirements
- Use the Building Relocation and Demolition Permit Application for any proposal to demolish or relocate a primary or accessory structure larger than 200 sq ft
- Reviewed by BOZAR (the Town's own Demolition FAQ sheet provides additional guidance)
- Structures 200 sq ft or smaller are not subject to this permit track per the Town's own application scope language
- Historic structures may be eligible for a variance under CWRC Section 102.9 if a required upgrade would jeopardize continued historic designation, but this is a separate CWRC provision, not a demolition-permit exemption
Required documents
- RequiredBuilding Relocation and Demolition Permit Application
- OptionalDemolition FAQ SheetTown-published guidance document for this application
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Fee | Not separately published as a flat demolition fee in the 2026 Fee Schedule; billed via the applicable Design Review Application and Publication fee tiers ($120-$1,000+ depending on project classification) plus any associated Building Permit valuation fee | 2026 Town of Crested Butte Fee Schedule, Building & Planning section |
Commercial Building Permit (New Construction, Alteration & Tenant Improvement)
VerifiedRequired for all commercial construction in the Town of Crested Butte — new commercial and mixed-use buildings, additions, alterations, changes of use, and tenant improvements — under Town Code Sec. 18-13-40(a) ('No building or structure shall be erected, constructed, structurally altered, moved, demolished or changed without first obtaining a building permit'). Reviewed under the 2024 IBC (Chapter 18, Article 1), the IEBC for work on existing buildings, and the Town's IgCC Article 1.5 green-construction provisions for new commercial construction. Crested Butte has no separate commercial permit application or tenant-improvement permit type: the Town's own Jan-June 2026 issued-permit report shows commercial interior projects run through the single Building Permit process classified as 'Alteration Level 1 Commercial', 'Alteration Level 2 Commercial', or 'Commercial Change of Use'. Because most of downtown sits in the B1/B2/B3 Business Districts inside the National Historic District, commercial building permit applications are automatically classified 'special review' at BOZAR (Town Code Sec. 16-22-110(b)), the Town's historic/architectural review board — BOZAR approval is required BEFORE the building permit application may be submitted.
Verified 2026-08-02 · Source
Requirements
- BOZAR (Board of Zoning and Architectural Review) approval of a Development Permit Application is required before a building permit application may be submitted (Town Code Sec. 18-13-40(d); BOZAR page: 'you must receive BOZAR approval before applying for building permits') — BOZAR, not a separately named 'Historic Preservation Commission', is the body that administers historic-district design review in Crested Butte
- Automatic 'special review' BOZAR classification for any building permit in a B1, B2 or B3 Business District (Town Code Sec. 16-22-110(b)) — special review applications pay an additional $750 fee and their public notice must include a published three-dimensional perspective drawing showing the building's facade and relationship to neighboring structures plus a location map
- All construction documents for commercial projects must be prepared by Colorado registered or licensed design professionals and signed and stamped with a seal (Town Code Sec. 18-13-20(a)(16))
- New commercial buildings must be All Electric Buildings — no combustion equipment for space heating, water heating, or clothes drying; Commercial Food Heat-processing Equipment is exempt from the electrification mandate (IBC Sec. 1301.1.2 as amended by Town Code Sec. 18-1-30; All Electric Building definition, Town Code Chapter 18)
- EV parking for new commercial: buildings/accessory structures with 2+ parking spaces must provide one Level II EVSE; 10% of total required spaces (rounded up) must be Electric Vehicle Ready; one 25 kW DC Fast Charger required where 5 or more parking spaces are required (IBC Sec. 1301.1.3 as amended)
- Solar for new commercial: buildings under 5,000 sq ft must install Solar Ready Components; buildings 5,000 sq ft or larger must install rooftop solar PV per Town Code Sec. 18-1.5-30(5), capped at Gunnison County Electric Association net-metering limits (IBC Sec. 1301.1.4 as amended; Town Code Sec. 18-9-50)
- New commercial construction must comply with the Town's adopted International Green Construction Code sections (Town Code Article 1.5): stormwater management, building water use reduction, appliance/HVAC efficiency, commercial food service operations, hot water distribution, on-site renewable energy systems, and kitchen exhaust systems
- Alterations, repairs, additions and changes of occupancy of existing commercial buildings are governed by the 2021 IEBC (Town Code Article 2.5; IECC Chapter 5 [CE] as replaced); commercial Level 3 alterations must additionally be Electric Ready, install Solar Ready Components (under 5,000 sq ft) or rooftop PV (5,000+ sq ft), and provide Level II EVSE plus 10% EV-Ready spaces where the building has 2+ parking spaces (IEBC Secs. 907.2-907.3 as amended)
- Current Gunnison County building contractor license required — no permit issued since February 1, 2023 without one (Town Code Sec. 18-13-40(e))
- Complete Sec. 18-13-20 submittal package: legal description, deed, plot plan, elevations, floor plans, site development plan (paving, walls/fences, landscaping, exterior lighting), front elevation showing site context, and cross-sections
- Valuation set by the Building Official from the ICC building valuation data table multiplied by a 2.70 regional modifier, or other evidence of value, whichever is greater (Town Code Sec. 18-13-40(b))
- If the parcel falls in a mapped Class 1 or Class 2 Colorado Wildfire Resiliency Code fire hazard area, CWRC structure-hardening applies to new commercial structures, changes of use, additions increasing footprint 500+ sq ft, and replacement of more than 25% of exterior siding or roof covering (Town Code Article 6.5; Town enforcement begins June 1, 2026)
- Certificate of occupancy required before any structure or altered portion may be rented, occupied or used (Town Code Sec. 18-13-70)
- Construction must commence within 180 days of permit issuance; the permit expires one year after issuance with a single 6-month renewal available for good cause (Building Permit Contract Agreement; Town Code Sec. 18-13-60)
Required documents
- RequiredBOZAR Development Permit ApplicationMust be approved before the building permit application is submitted; commercial-district (B1/B2/B3) applications are automatically classified special review
- RequiredBuilding Permit ApplicationThe Town's single building permit form (Town of Crested Butte Building Department, PO Box 39) covering all use types — includes USE TYPE, OCCUPANCY, materials/labor valuation, and FAR fields; no separate commercial or tenant-improvement application exists
- RequiredSealed commercial construction documentsAll construction documents for commercial projects must be prepared, signed and seal-stamped by Colorado registered or licensed design professionals (Town Code Sec. 18-13-20(a)(16))
- RequiredGunnison County Building Contractor LicenseCounty-level contractor license required on every permit since February 1, 2023
- RequiredMaterials List Form - Primary StructureRequired for construction on a new or existing primary building; referenced during building inspections
- OptionalStatement of Authority FormRequired if the property is owned by an LLC or other legal entity
- OptionalLimited Power of AttorneyRequired as part of both the BOZAR and building permit applications if the applicant is not the property owner
- OptionalPretreatment Application (Fats, Oils & Grease)Required for food-service tenant improvements discharging grease to the Town sewer; $48.50 application fee per the 2026 Fee Schedule
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1.00 to $500.00 | $28.42 | 2026 Town of Crested Butte Fee Schedule (Exhibit A), effective January 1, 2026, adopted by Resolution 34, Series 2025; same valuation-based table for residential and commercial |
| Building Permit Fee — valuation $501.00 to $2,000.00 | $28.42 plus $3.68 per $100 of TSV or fraction thereof above $501 | — |
| Building Permit Fee — valuation $2,001.00 to $25,000.00 | $83.74 plus $16.95 per $1,000 of TSV or fraction thereof above $2,001 | — |
| Building Permit Fee — valuation $25,001.00 to $50,000.00 | $473.79 plus $12.18 per $1,000 of TSV or fraction thereof above $25,001 | — |
| Building Permit Fee — valuation $50,001.00 to $100,000.00 | $778.58 plus $8.47 per $1,000 of TSV or fraction thereof above $50,001 | — |
| Building Permit Fee — valuation $100,001.00 to $500,000.00 | $1,202.07 plus $6.77 per $1,000 of TSV or fraction thereof above $100,001 | — |
| Building Permit Fee — valuation $500,001.00 to $1,000,000.00 | $3,911.05 plus $5.74 per $1,000 of TSV or fraction thereof above $500,001 | — |
| Building Permit Fee — valuation $1,000,001.00 to $5,000,000.00 | $6,681.04 plus $3.00 per $1,000 of TSV or fraction thereof above $1,000,001 | — |
| Building Permit Fee — valuation $5,000,001.00 and over | $18,327 plus $1.00 per $1,000 of TSV or fraction thereof above $5,000,001 | — |
| Plan Review Fee (Commercial) | 60% of Permit Fee | 2026 Fee Schedule: 'Plan Review Fee 30% Permit Fee Residential/60% Commercial' — commercial plan review is double the residential rate |
| Construction Documents Examination (Commercial) | 60% of Permit Fee | Separate 2026 Fee Schedule line: 60% commercial / 30% residential; outside consultants billed at actual cost, other examination at $65/hour |
| BOZAR Design Review — Major Project | $1,000.00 plus $125.00 publication fee | Maximum fee depending on complexity; plus $300 for each full Board meeting and $60 for each DRC meeting beyond the first 2 |
| BOZAR Design Review — Minor Project (small remodel/accessory building) | $750.00 plus $125.00 publication fee ($700.00 with no-picture publication) | — |
| BOZAR Special Review Classification surcharge | $750.00 additional | Automatic for building permits in B1/B2/B3 Business Districts per Town Code Sec. 16-22-110(b) — effectively a standard cost of commercial-district projects |
| Insubstantial Design Review - DRC | $120.00 | For work the Building Inspector and a designated BOZAR member deem insubstantial under Town Code Sec. 16-1-20 / 16-22-100(a) — the typical path for interior-only tenant improvements |
| Additional DRC Meeting | $100.00 per meeting beyond the first 2 | — |
| Use Tax Deposit | Not less than 4.5% of 60% of Total Project Valuation | — |
| Performance Deposit | 0.50% of Total Structure Value | — |
| Affordable housing payment-in-lieu (new non-residential floor area) | $41.82 per sq ft | 2026 Fee Schedule: assessed on newly constructed non-residential floor area in lieu of providing Resident Occupied Affordable Housing units; $4,445.76 per lodging unit for new lodging/short-term accommodation units |
| Capital Expansion Fee — Fire (business/commercial/tourist) | $0.14 per sq ft | 2026 Fee Schedule capital expansion section |
| Mechanical Permit (boiler/compressor/absorption system) | $100.00 | — |
| Mechanical Exhaust Hood | $200.00 | Directly relevant to restaurant tenant improvements |
| Water/Sewer Tap Fees (new construction) | $14,349 water plus $17,726 sewer, per EQR | 2026 Fee Schedule; EQR = Equivalent Residential Usage of a standard 1,875 sq ft residential unit |
| Work without Permit | $250 to $1,000 per day, plus applicable permit fee | — |
Sign Permit
VerifiedRequired for most business identification, freestanding, projecting, and wall signage in Crested Butte under Town Code Chapter 16 (Zoning), Article 18 — Signs (Sec. 16-18-10 through 16-18-100). Uniquely among this file's permit types, a sign permit is issued jointly by the Building Inspector AND the Board (BOZAR), reflecting the Town's National Historic District status; the fee is a flat $20.00 plus $2.00 per square foot of sign area above 10 square feet, confirmed identically on both the Town's dedicated Sign Permit Application form and its 2026 Fee Schedule. Article 18 also carries its own genuine insubstantial-determination shortcut (Sec. 16-18-100) distinct from, but structurally parallel to, the BOZAR-wide insubstantial process already documented in this file's commercial-building-permit entry.
Verified 2026-08-13 · Source
Requirements
- No sign shall be erected, constructed, altered, remodeled or changed until a permit is issued by BOTH the Building Inspector and the Board (BOZAR) — Town Code Sec. 16-18-10(a)
- Exempt from the permit requirement (Sec. 16-18-10(b)): historic markers on buildings for 40+ consecutive years as of July 31, 2012 conveying only historic use, residential identification signs, real estate sale/rent signs, construction/remodeling signs, institutional identification signs, and transient-merchant signs — none of these count toward a property's allowable sign total either
- Also permit-free: one open/closed sign per business up to 2 sq ft, one business-hours sign up to 2 sq ft (Sec. 16-18-20(2)(a)-(b)), and signs/pictures/posters within 5 feet of the inside of windows, provided they are not internally lit/neon, moving, 'Day-Glo,' flashing, or redundant as to subject matter (Sec. 16-18-20(16))
- Beyond the exemptions, each business may generally have up to 2 additional permitted signs, plus a third permitted alley-facing sign (max 6 sq ft, wall-mounted only, not visible from a numbered street) — Sec. 16-18-20(2)(c), (e)
- No internally lit, neon, phosphorescent, flashing, animated, or moving-part signs, except one narrow wooden-framed glass-door box (max 4 sq ft) that may be internally lit with shielded white incandescent light (Sec. 16-18-20(8), (18))
- Aggregate sign area cap (Sec. 16-18-50): buildings with an 800+ sq ft front facade may have up to 100 sq ft of signage in aggregate; buildings under 800 sq ft are capped at 1/8 of the front facade area; no single sign may exceed 32 sq ft; variances are NOT allowed for sign measurements
- Structural limits (Sec. 16-18-40): freestanding signs limited to one per building/parcel, no taller than 12 feet above grade; tallest individual letter may not exceed 18 inches; wall signs may not project more than 6 inches from the building wall
- Off-site signs (advertising a business not located at the sign's location) are permitted only adjacent to Elk Avenue in Blocks 19-23 and 26-30 of the B-1, B-3, and B-4 Business Districts, within 266 linear feet of Elk Avenue frontage, subject to uniform dimension limits (Sec. 16-18-20(24))
- A sign permit may be issued concurrently with, and without a separate application or fee from, a building permit if the Board considers the sign at the same time it considers the architectural appropriateness of the building (Sec. 16-18-70)
- The Building Inspector and the Chair of the Board may jointly designate a complete, code-compliant sign application as 'insubstantial' if it will have little or no visible impact on the surrounding neighborhood — this waives full Board approval, subject to the Building Inspector reporting the designation to the Board at its next meeting (Sec. 16-18-100)
- The Board may waive all or part of the sign permit fee for good cause shown or to promote substantial justice (Sec. 16-18-80)
- In flux: the Town's Draft Chapter 16 Zoning Code rewrite (discussed at BOZAR through mid-2026, per Crested Butte News reporting, with council giving unofficial approval to a final draft on June 15, 2026 before it returned to BOZAR and Council) is understood to touch sign code, lighting, and FAR provisions — the live Municode Article 18 text used for this entry is current only through Ordinance No. 5, Series 2026 (adopted March 16, 2026) and shows no post-rewrite amendment as of the last verification; confirm current requirements directly with Planning before finalizing a design
Required documents
- RequiredSign Permit Application (Town of Crested Butte Building Department form)Records applicant, sign type, size, and fee; includes space to draw or attach a rendering of the proposed sign
- RequiredScaled Drawing or Rendering of Proposed SignMust show location, dimensions, materials, colors, mounting, and wording
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit Fee | $20.00 plus $2.00 per square foot of sign area over 10 square feet | Confirmed identically on the Town's Sign Permit Application form and the 2026 Town of Crested Butte Fee Schedule (Exhibit A), effective January 1, 2026 |
| Fee Waiver | Discretionary — all or part of the fee | The Board may waive the fee for good cause shown or to promote substantial justice (Town Code Sec. 16-18-80); no separate sign permit fee applies if the sign is reviewed by the Board concurrently with a building permit's architectural appropriateness review (Sec. 16-18-70) |
Fire Sprinkler and Fire Alarm System Permit
VerifiedFire sprinkler and fire alarm/detection system work in Crested Butte is permitted, plan-reviewed, and inspected by the Crested Butte Fire Protection District (CBFPD) — a special district separate from the Town's own Building Department, mirroring the dual-agency pattern documented at peer Colorado mountain towns in this corpus. Unlike Breckenridge (Red, White & Blue Fire District) or Aspen, CBFPD does not charge a standalone per-sprinkler-head or per-device fee: its own Plan Review & Fee Schedule (effective 4/1/2022) bundles fire suppression and monitored fire alarm system plan review and inspection into a single gross-floor-area-based 'New Construction and Alterations' fee that covers the whole project. CBFPD approval is also a genuine precondition to the Town issuing the underlying building permit at all, per CBFPD's own published Plan Submittal Process: CBFPD reviews and approves plans FIRST, sends an approval letter to both the applicant and the Town Building Department, and only then does the Town issue the building permit.
Verified 2026-08-13 · Source
Requirements
- CBFPD plan review approval is required BEFORE the Town's Building Department will issue a building permit for new construction or alterations — per CBFPD's own published Plan Submittal Process flowchart: proponent submits plans to CBFPD, CBFPD invoices and performs its plan review, CBFPD sends an approval letter to the applicant AND copies the appropriate Town building department, and only then does the building department issue the Building Permit
- Governed by the 2024 International Fire Code as adopted by Town Code Sec. 18-6-10 (Ord. No. 9, Series 2025, effective September 15, 2025), locally amended: IFC Sec. 507.1 requires an approved monitored fire suppression system throughout any occupancy or structure wherever the water supply cannot provide the required fire flow, EXCEPT Occupancy R-3 single-family dwellings (Town Code Sec. 18-6-20(5))
- This water-supply-based trigger operates independently of, and in addition to, the fire-area-based sprinkler triggers already documented in this file's residential- and commercial-building-permit entries (single-family dwellings exempt from IRC R313.2 sprinklers under Sec. 18-2-30(6); shared-wall units — duplex/triplex/quadplex/multifamily — must meet IFC Chapter 9/IRC P2904) — an otherwise-exempt building can still be required to sprinkler if the site's available fire flow is inadequate
- CBFPD's Plan Review & Fee Schedule (effective 4/1/2022) bundles plan review and inspection for automatic fire suppression systems and/or monitored fire alarm systems, if required, into its single gross-floor-area-based 'New Construction and Alterations' fee (Section 1001.A) — there is no separate CBFPD fee line specifically for sprinkler heads or alarm devices, unlike the itemized per-head fee structures documented at peer jurisdictions in this corpus
- Monitored fire suppression/alarm systems require the contractor to obtain a State of Colorado 'Electrical Rough-in' inspection BEFORE CBFPD will schedule its own corresponding 'Rough-in' inspection, and a State of Colorado 'Electrical Final' inspection BEFORE CBFPD will schedule its 'Fire Final' inspection
- CBFPD will not schedule a Fire Final inspection until the project's construction is complete and 'move-in ready'
- A Pre-Application Meeting with CBFPD is available on request to help ensure a complete plan submittal before formal review begins
- Inspection requests under the Town's own adopted Fire Code (as distinct from CBFPD's development plan review process) must be submitted at least 5 working days in advance (IFC Sec. 104.7.2.1 as amended, Town Code Sec. 18-6-20(4))
- Distinct from the Town's own flat Capital Expansion Fee — Fire ($388.79 per residential dwelling unit for new construction; $0.14 per sq ft for business/commercial/tourist uses), which is collected by the Town itself as part of the standard Building Permit fee package (per this file's residential- and commercial-building-permit entries) and is separate from, and in addition to, CBFPD's own independently invoiced plan review and impact fees
- No numeric plan-review-timeline SLA is published anywhere on CBFPD's Application & Plan Review page, its Fee Schedule, or its Builders Packet
Required documents
- RequiredCBFPD Plan Review Application (submitted via cbfpd.org)Covers new construction and alterations generally, including any automatic fire suppression and/or monitored fire alarm system scope
- RequiredComplete Set of Plans
- RequiredAccess Plans (Driveway) and Utilities Location
- OptionalPre-Application Meeting RequestOptional, available on request to ensure a complete submittal
- OptionalState of Colorado Electrical Rough-in / Electrical Final Inspection RecordsRequired for monitored systems before CBFPD will schedule its corresponding Rough-in or Fire Final inspection
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| CBFPD Plan Review Fee — Gross Floor Area 0 - 2,500 sq ft | $700 | CBFPD Plan Review & Fee Schedule, effective 4/1/2022 (Section 1001.A) — includes up to 30 minutes of pre-plan consultation, one initial plan review, one rough-in inspection, one fire final… Show full citationHideCBFPD Plan Review & Fee Schedule, effective 4/1/2022 (Section 1001.A) — includes up to 30 minutes of pre-plan consultation, one initial plan review, one rough-in inspection, one fire final inspection, one residential fire suppression underground inspection, alternate water supply review (if required), and plan review/inspection for automatic fire suppression systems and/or monitored fire alarm systems (if required) |
| CBFPD Plan Review Fee — Gross Floor Area 2,501 - 3,600 sq ft | $2,520 | — |
| CBFPD Plan Review Fee — Gross Floor Area 3,601 - 5,000 sq ft | $5,250 | — |
| CBFPD Plan Review Fee — Gross Floor Area 5,001 - 10,000 sq ft | $10,500 | — |
| CBFPD Plan Review Fee — Gross Floor Area greater than 10,001 sq ft | $10,500 plus $1.05 per sq ft | — |
| CBFPD Impact Fee — Residential (new dwelling unit only) | $388.79 per dwelling unit | — |
| CBFPD Impact Fee — Commercial | $0.138 per sq ft | — |
| CBFPD Photovoltaic Plan Review (independent) | $150 | — |
| CBFPD Additional Plan Review/Consultation (changes after initial submission) | $200 per hour | — |
| CBFPD Re-Inspection Fee — Residential | $250 first occurrence; $500 additional occurrences | — |
| CBFPD Re-Inspection Fee — Commercial | $500 first occurrence; $1,000 additional occurrences | — |
| CBFPD Waiver Request to Board of Directors | $1,500 | — |
| Town Capital Expansion Fee — Fire (separate from CBFPD's fees; collected by the Town as part of the Building Permit) | $388.79 per residential dwelling unit (new); $0.14 per sq ft business/commercial/tourist | 2026 Town of Crested Butte Fee Schedule — do not conflate with CBFPD's own independently invoiced impact fee of the same $388.79 residential figure; the two are billed by different entities |
Change of Use Permit
VerifiedCrested Butte has no standalone 'change of use permit' by that name. A change of use is instead folded directly into the Town's single Building Permit requirement: Town Code Sec. 18-13-40(a) requires a building permit before any structure is 'erected, constructed, structurally altered, moved, demolished or changed,' and the Town's own issued-permit reporting system tracks these projects with a distinct classification — 'Commercial Change of Use' — within the same BLD permit series used for new construction and alterations. This is confirmed by a real worked example from the Town's own Custom City Report: permit BLD2026-00008 at 129 Elk Ave (applicant Pinnacle Inc.), received 02/04/2026 and issued 02/06/2026 at a $342,000 valuation, tracked with Type of Use 'Commercial,' Type of Work 'Alteration,' and Type of Permit 'Commercial Change of Use.' This entry gives change-of-use its own dedicated reference; the underlying process is otherwise identical to this file's commercial-building-permit entry.
Verified 2026-08-13 · Source
Requirements
- No standalone 'change of use permit' application exists; a change of use is processed through the Town's single Building Permit application under Town Code Sec. 18-13-40(a), which requires a permit before a structure is 'erected, constructed, structurally altered, moved, demolished or changed'
- The Town's own issued-permit reports classify these projects as 'Commercial Change of Use,' distinct from but processed alongside 'Alteration Level 1 Commercial' and 'Alteration Level 2 Commercial' within the same BLD permit tracking series — confirmed via a real issued example (BLD2026-00008, 129 Elk Ave, Pinnacle Inc., received 02/04/2026, issued 02/06/2026, $342,000 valuation)
- Any building permit located in the B1, B2, or B3 Business Districts is automatically classified 'special review' at BOZAR (Town Code Sec. 16-22-110(b)), applying the same $750 surcharge and published 3-D perspective drawing requirement documented in this file's commercial-building-permit entry to a change of use in the historic downtown core exactly as it would to new construction or alteration
- The Colorado Wildfire Resiliency Code (Town Code Article 6.5) explicitly lists 'changes of use' among its enumerated triggers, alongside new construction, moved structures, additions increasing footprint 500+ sq ft, and replacement of more than 25% of exterior siding or roof covering — a change of use inside a mapped Class 1/Class 2 CWRC fire hazard zone can trigger structure-hardening compliance once Town enforcement begins June 1, 2026
- Interior-only changes of use judged 'insubstantial' by the Building Inspector and a designated BOZAR member (evaluated on street visibility, extent of change relative to the structure, and neighborhood effect, per Town Code Sec. 16-1-20/16-22-100(a)) can skip the full BOZAR hearing and public notice, paying only the $120 Insubstantial Design Review - DRC fee — the same fast path already documented in this file's commercial-building-permit entry for interior tenant improvements generally
- Billed under the same valuation-based Building Permit fee table as any other permit type (2026 Fee Schedule) — no standalone 'change of use' fee line is published; a change of use involving little or no construction valuation still pays at minimum the base Building Permit fee tier ($28.42) plus applicable plan review
- Current Gunnison County building contractor license required for all contractors on the permit, same as any other Building Permit (Town Code Sec. 18-13-40(e))
- All construction documents for commercial projects (where construction accompanies the change of use) must be prepared, signed and seal-stamped by Colorado registered or licensed design professionals (Town Code Sec. 18-13-20(a)(16))
- Certificate of occupancy required before the space may be rented, occupied, or used where the change of use involves construction (Town Code Sec. 18-13-70)
Required documents
- RequiredBuilding Permit ApplicationThe Town's single form covering all use types, including a USE TYPE field and project description used to describe the change of use; no separate change-of-use-specific application exists
- RequiredBOZAR Development Permit ApplicationRequired before submittal for a change of use with exterior scope, or automatically for one located in the B1/B2/B3 Business Districts (special review classification); may be waived via an insubstantial determination for interior-only work
- OptionalSealed commercial construction documentsRequired where the change of use is accompanied by construction work
- RequiredGunnison County Building Contractor License
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1.00 to $500.00 (minimum tier) | $28.42 | 2026 Town of Crested Butte Fee Schedule (Exhibit A) — same valuation-based table used for all Building Permit types in this file; a change of use with little or no construction valuation still pays at minimum this base tier |
| Plan Review Fee (Commercial) | 60% of Permit Fee | Same commercial plan review rate documented in this file's commercial-building-permit entry |
| Insubstantial Design Review - DRC | $120.00 | Fast path for interior-only changes of use judged to have little/no visible impact, per Town Code Sec. 16-1-20/16-22-100(a) |
| BOZAR Special Review Classification surcharge | $750.00 additional | Automatic for any permit — including a change of use — located in the B1/B2/B3 Business Districts (Town Code Sec. 16-22-110(b)) |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Crested Butte building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.