This is PermitBase’s published record for Mount Crested Butte as of 2026-08-02. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Mount Crested Butte building permits
VerifiedMount Crested Butte, Colorado — as published 2026-08-02.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family homes, duplexes, townhomes, and similar residential structures within Town of Mt. Crested Butte limits. Reviewed under the 2021 IRC as locally amended (Town Code Chapter 6, Article III), including the Town's Table R301.2 climatic design criteria (155 psf ground snow load, 105 mph wind design speed, Seismic Design Category B, 9,400 ft Manual J elevation), a stricter automatic fire sprinkler trigger than neighboring Crested Butte, and a concurrent Design Review + Permit Review process administered directly by the Community Development Department.
Verified 2026-07-06 · Source
Requirements
- Design Review and Permit Review are conducted CONCURRENTLY (not sequentially gated); Design Review approval, once granted, is valid for 1 year
- Must meet Table R301.2 design criteria: 155 psf ground snow load (2016 SEAC Colorado Design Snow Loads), 105 mph wind design speed, Seismic Design Category B, 36-inch minimum frost line depth, mandatory roof ice barrier underlayment, -16 F winter design temperature, 9,400 ft Manual J elevation
- Automatic residential fire sprinkler system required in all two-family dwellings/townhomes (no size threshold) and in one-family dwellings with gross floor area 4,800 sq ft or more (Town Code Sec. 6-59)
- Crested Butte Fire Protection District (CBFPD) approval letter required confirming access, gas meter location, and water supply comply with Town Code Chapter 8
- Construction Management Plan (CMP) required, addressing on-site parking, material staging, trash/toilets, and seasonal right-of-way parking restrictions (no parking in Town rights-of-way November 15-April 15)
- Soils report required; engineer must address foundation design, driveway design, and retaining walls per the soils report recommendations
- Site survey/plat prepared by a Colorado-licensed land surveyor required with the permit application (Town Code Sec. 6-49/R105.3)
- Landscaping point schedule required, tied to Gross Residential Floor Area (GRFA) — minimum 2,000 base points in single-family residential plus 1 additional point per sq ft above 2,500 sq ft GRFA, with minimum tree/evergreen composition thresholds
- Mt. CB Water & Sanitation District tap fee receipt required prior to permit issuance
- Contractor must hold a current Mt. CB Business License (BOLF)
- Design Review Compliance and Cleanup Deposit required for any permit with valuation $1,000 or more, tiered by total valuation (up to 2% of valuation for higher tiers), up to 50% refundable on substantial design-review completion
- 3% Use Tax on construction/building materials, calculated on 50% of estimated total valuation, reconciled within 90 days of CO issuance or final inspection
- Radon mitigation plan must be shown on drawings (per the Town's Radon Requirements IRC 2015 policy)
- Electrical and plumbing work under this permit is NOT reviewed or inspected by the Town — those permits/inspections are obtained separately and directly from the State of Colorado (Colorado Electrical Board and Colorado State Plumbing Board)
Required documents
- RequiredDesign and Permit Review Application (GovWell portal)Submitted online via app.govwell.com/mtcb; combined design and building permit review process
- RequiredBuilding Permit Application (fillable form)
- RequiredSite survey/plat by a Colorado-licensed land surveyor
- RequiredCrested Butte Fire Protection District approval letter
- RequiredConstruction Management Plan (CMP)
- RequiredSoils/Geotechnical Report
- RequiredLandscaping Plan with Point Table
- RequiredMt. CB Water & Sanitation District Tap Fee Receipt
- RequiredMt. CB Business License (BOLF) for General Contractor
- OptionalProperty Owner Authorization FormRequired if the applicant is not the property owner
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1.00 to $500.00 | $23.50 | Town Code Sec. 6-21 / Table 1-A (IBC) and Sec. 6-52 / Table R1-A (IRC), identical schedules, set directly in Ordinance No. 6, Series 2024 |
| Building Permit Fee — valuation $501.00 to $2,000.00 | $23.50 for the first $500 plus $3.05 per additional $100 or fraction thereof | — |
| Building Permit Fee — valuation $2,001.00 to $25,000.00 | $69.25 for the first $2,000 plus $14.00 per additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $25,001.00 to $50,000.00 | $391.75 for the first $25,000 plus $10.10 per additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $50,001.00 to $100,000.00 | $643.75 for the first $50,000 plus $7.00 per additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $100,001.00 to $500,000.00 | $993.75 for the first $100,000 plus $5.60 per additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $500,001.00 to $1,000,000.00 | $3,233.75 for the first $500,000 plus $4.75 per additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $1,000,001.00 and up | $5,608.75 for the first $1,000,000 plus $3.65 per additional $1,000 or fraction thereof | — |
| Plan Check Fee | 65% of the Building Permit Fee | Separate from and in addition to the permit fee, per Town Code Sec. 109.5/R108.5 |
| Use Tax | 3% of 50% of total estimated project valuation | Reconciled within 90 days of CO issuance or final inspection approval |
| Design Review Compliance and Cleanup Deposit — valuation $1,000-$4,999 | $500 | — |
| Design Review Compliance and Cleanup Deposit — valuation $5,000-$9,999 | $1,000 | — |
| Design Review Compliance and Cleanup Deposit — valuation $10,000-$49,999 | $2,000, or 2% of total valuation for higher tiers per the Building Official's determination | — |
| Work Done without a Building Permit | $100.00 or the permit fee, whichever is greater | 2026 Fee Resolution No. 9, Series 2026, effective May 20, 2026 |
Residential Addition / Remodel Permit
Required for additions, interior remodels, and exterior remodels to existing residential structures in Mt. Crested Butte, per the Town's own Permit Policy document covering remodels, additions, repairs, excavation, and driveway improvements. Reviewed under the 2021 IRC and IEBC as locally amended (Town Code Chapter 6); additions of 1,000 sq ft or more that bring total gross floor area to 4,800 sq ft or more trigger whole-structure fire sprinkler requirements.
Reviewed 2026-08-02 · Source
Requirements
- Interior remodels requiring a permit include basement finishes, attic conversions, kitchen/bathroom remodels, structural changes (adding/removing doors, windows, walls, or changing rough opening sizes), new/rerouted ductwork or mechanical ventilation, insulation changes to the exterior thermal envelope, gas/solid-fuel appliance changes, and drywall teardown/replacement over a 4x8 ft sheet
- Exterior remodels requiring a permit include roofing replacement or new roof, siding replacement, and deck structural element replacement or new deck
- No permit required for like-for-like replacement of cabinets, countertops, tiling, flooring, windows, or doors (provided rough openings don't change), or drywall patching under a 4x8 ft sheet — all replacements must still meet International Energy Code requirements
- Additions of 1,000 sq ft or more that bring total gross floor area to 4,800 sq ft or more require the ENTIRE structure to be protected with an automatic fire sprinkler system (Town Code Sec. 6-59)
- Level 3 alterations to existing structures with gross floor area 4,800 sq ft or more require automatic fire sprinkler protection
- Retaining walls over 4 feet require engineering and must be textured, colored, or faced per the Town's Design and Permit Review Punch List
- Design Review Compliance and Cleanup Deposit required for permits with valuation $1,000 or more
- 3% Use Tax on construction/building materials, calculated on 50% of estimated total valuation
Required documents
- RequiredBuilding Permit Application (fillable form)
- OptionalDesign and Permit Review Application (GovWell portal, for exterior-affecting projects)
- RequiredMt. CB Business License (BOLF) for General Contractor
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (same valuation-tiered schedule as new construction, Table R1-A) | $23.50 minimum, scaling per Town Code Sec. 6-52 | Ordinance No. 6, Series 2024 |
| Plan Check Fee | 65% of the Building Permit Fee | — |
| Use Tax | 3% of 50% of total estimated project valuation | — |
Mechanical / HVAC Permit
Required for heating, cooling, ventilation, and appliance installation, alteration, or repair in Mt. Crested Butte. Governed by the 2021 International Mechanical Code (IMC), adopted by Town Code Chapter 6, Article IV, with a locally set flat-fee Table 1-AM schedule (Town Code Sec. 6-75) rather than a valuation-based fee.
Reviewed 2026-08-02 · Source
Requirements
- Governed by the 2021 IMC as locally adopted (Town Code Sec. 6-73 through 6-75)
- No separate mechanical permit required if the mechanical work is already covered by an issued building permit (Town Code amendment to IMC Sec. 106.2)
- Flat per-unit fees apply by equipment category rather than a project-valuation-based fee
- Contractor must hold a current Mt. CB Business License (BOLF)
Required documents
- RequiredMechanical Permit Application
- RequiredMt. CB Business License (BOLF)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Issuance Fee | $50.00 | Town Code Sec. 6-75, Table 1-AM, per permit issued — set directly in Ordinance No. 6, Series 2024 |
| Supplemental Permit (original permit not expired/canceled/finished) | $50.00 | — |
| Repair/Addition of Heating, Cooling, Absorption, or Evaporative-Cooling System | $50.00 | — |
| Air-Handling Unit (up to 10,000 cfm, including attached ducts) | $50.00 | — |
| Air-Handling Unit (over 10,000 cfm) | $50.00 | — |
| Evaporative Cooler (non-portable) | $50.00 | — |
| Ventilation Fan (single duct) | $50.00 | — |
| Ventilation System (not part of a heating/cooling system on a permit) | $50.00 | — |
| Exhaust Hood Installation (including ducts) | $50.00 | — |
| Miscellaneous Appliance/Equipment (not otherwise classified) | $50.00 | — |
Roofing Permit (Re-Roof)
Required for re-roofing work in Mt. Crested Butte, reviewed under the 2021 IBC/IRC as adopted, with mandatory ice barrier underlayment per Table R301.2. If the re-roof affects 25% or more of the structure, the entire roof must meet Colorado Wildfire Resiliency Code (WRC) Class A roof-covering, valley-flashing, and vent-mesh requirements per the Town's own WRC Standards Summary.
Reviewed 2026-08-02 · Source
Requirements
- Roof Ice Barrier Underlayment Required: Yes, per Table R301.2 (Mt. CB Design Criteria 2021)
- If the re-roof project affects 25% or more of the structure, the ENTIRE roof must meet Colorado Wildfire Resiliency Code requirements: Class A roofing materials, minimum 26-gauge metal roof valleys, noncombustible gutters/downspouts, noncombustible corrosion-resistant vent mesh with 1/8-inch maximum openings
- Roofing is explicitly listed as one of the design-review application types that 'does not require drawings/engineering' under the Town's own Design Review Fees schedule, carrying a lower flat design-review fee than projects requiring drawings
- Contractor must hold a current Mt. CB Business License (BOLF)
Required documents
- RequiredBuilding Permit Application — Roofing scope
- RequiredDesign Review Application (no-drawings track)
- RequiredMt. CB Business License (BOLF)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Design Review Fee — application not requiring drawings/engineering (e.g., roofing, mechanical) | $100.00 | Resolution No. 9, Series 2026 Fee Schedule, effective May 20, 2026 |
| Building Permit Fee (valuation-based, same schedule as new construction) | $23.50 minimum, scaling per Town Code Sec. 6-52 / Table R1-A | No standalone flat re-roof fee is published; billed under the general valuation-based Building Permit fee table based on roofing project valuation |
| Plan Check Fee | 65% of the Building Permit Fee | — |
Solar Photovoltaic (PV) Permit
Required for rooftop or ground-mounted solar photovoltaic installation in the Town of Mt. Crested Butte. The Town's own Building Division does NOT issue or inspect electrical permits at all — electrical work, including PV wiring and utility interconnection, is handled entirely by the Colorado State Electrical Board (Division of Professions and Occupations), capped at $500 for a residential permit and $1,000 for a commercial permit under the statewide solar permit fee cap, C.R.S. § 24-48.5-113 (HB21-1284). The Town's own Building Permit (valuation-based Table 1-A fee, or the Design Review 'no drawings/engineering' $100 fee for simple roof-mounted work) covers only the structural/mounting scope. The Town has adopted the Model Colorado Electric and Solar Ready Code provisions for new construction.
Reviewed 2026-08-02 · Source
Requirements
- Town Building Permit required for the array mounting/structural scope, submitted via the Town's GovWell online portal
- Electrical permit for PV wiring/interconnection must be obtained directly from the Colorado State Electrical Board (dpo.colorado.gov/Electrical), NOT from the Town — the Town's Building Division does not issue or inspect electrical permits
- Colorado State Electrical Board Solar/Alternative Energy System permits may use a SolarApp+ or Symbium expedited plan review pathway per the Board's published process
- State Electrical Board permit is valid for one year from the date of issuance
- Design Review approval required through the Community Development Department; a solar-only installation that does not require drawings/engineering (e.g., a straightforward roof-mount) falls under the $100 Design Review fee tier; installations requiring drawings/engineering are billed at the $200+ tier
Required documents
- RequiredTown Building Permit Application (GovWell)Covers the array mounting/structural scope of work
- RequiredColorado State Electrical Board Solar/Alternative Energy Permit ApplicationFiled directly with the state board (dpo.colorado.gov), independent of the Town's building permit; may use SolarApp+ or Symbium expedited plan review
- RequiredDesign Review ApplicationCommunity Development Department review; fee tier depends on whether the installation requires drawings/engineering
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Town Building Permit Fee (valuation-based, Table 1-A) | Per the Total Valuation bracket table (e.g., $69.25 for the first $2,000 plus $14.00 per additional $1,000 up to $25,000) | No solar-specific Town Building Permit fee line found in the 2026 Fee Schedule (Resolution No. 9, Series 2026); billed under the same valuation table as other construction |
| Design Review Fee (no drawings/engineering required, e.g. simple roof-mount) | $100.00 | Town of Mt. Crested Butte Resolution No. 9, Series 2026 Fee Schedule, Design Review Fees table |
| Design Review Fee (drawings/engineering required) | $200.00 | Applies if the installation requires drawings/engineering (e.g., structural analysis for a heavier array or non-standard mount) |
| Colorado State Electrical Board Solar/Alternative Energy Permit Fee (Residential) | $500.00 maximum | Statewide cap under C.R.S. § 24-48.5-113 (HB21-1284); set and collected by the State Electrical Board, not the Town. Consult dpo.colorado.gov/Electrical/PermitsandInspections for the current exact amount |
| Colorado State Electrical Board Solar/Alternative Energy Permit Fee (Commercial) | $1,000.00 maximum | Statewide cap under C.R.S. § 24-48.5-113 (HB21-1284) |
| Plan Check Fee | 65% of the Town Building Permit Fee | Applies to the valuation-based Town Building Permit portion per Town Code Sec. 109.5/R108.5; not confirmed whether it applies to the flat Design Review fee tiers |
Electric Vehicle (EV) Charger Permit
Required for installing a new electrical circuit, outlet, or panel/service upgrade to serve an EV charger in the Town of Mt. Crested Butte. As with solar PV interconnection work, the Town's Building Division does NOT issue or inspect electrical permits of any kind — all electrical work, including a new EV charger circuit, is handled directly by the Colorado State Electrical Board (Division of Professions and Occupations), independent of the Town's own Building Permit process (which only applies if structural work, such as a new garage, accompanies the charger installation).
Reviewed 2026-08-02 · Source
Requirements
- Electrical permit for the EV charger circuit/outlet/service-upgrade must be obtained directly from the Colorado State Electrical Board (dpo.colorado.gov/Electrical), NOT from the Town — the Town's Building Division does not issue or inspect electrical permits
- If the charger installation is bundled with structural work (e.g., a new garage or carport), a separate Town Building Permit is required for that scope, submitted via the Town's GovWell online portal
- No dedicated EV-charger permit application, checklist, or expedited review track is published by the Town or by the Colorado State Electrical Board as of 2026-07-20
- No EV-charger line item was found in the Town's Resolution No. 9, Series 2026 Fee Schedule, which does include dedicated flat fees for Solar (item 8) and Geothermal (item 9)
Required documents
- RequiredColorado State Electrical Board Permit ApplicationFiled directly with the state board (dpo.colorado.gov) for the EV charger circuit/outlet/service-upgrade scope, independent of any Town building permit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Colorado State Electrical Board Permit Fee | Set and collected by the State Electrical Board, not the Town of Mt. Crested Butte; no statewide EV-specific fee cap comparable to the solar HB21-1284 cap was found published. Consult dpo.colorado.gov/Electrical/PermitsandInspections for the current amount. |
Commercial Building Permit (New Construction, Addition & Tenant Improvement/Alteration)
Required for new commercial construction and for tenant improvement/alteration work in existing commercial buildings within Town of Mt. Crested Butte limits — including hotel, condo-hotel/accommodation, retail, restaurant, and other non-single/two-family occupancies, and Downtown Development Authority (DDA) District development. Reviewed by the same Community Development Department (Building Division) as residential permits, under Town Code Chapter 6, Article II (2021 IBC, as locally amended by Ordinance No. 6, Series 2024) for new construction and Article IX (2021 IEBC) for alterations, using the SAME GovWell application portal and the SAME valuation-tiered Table 1-A Building Permit Fee schedule as residential (Sec. 6-21, citing IBC Sec. 109.2) — this file's residential-building-permit entry documents that Table 1-A and the parallel residential Table R1-A are identical schedules. The Town's own Fee Schedule (Resolution No. 9, Series 2026) does set a distinct, higher Design Review fee category for 'Accomdation [sic] Units, and Commerical [sic] Unit[s]' compared to Single Family Residence or Multi-Family Residential Design Review fees. No standalone commercial-specific building permit application form, submittal checklist, or Tenant Improvement Permit fee/application track distinct from this general process was found published by the Town.
Reviewed 2026-08-02 · Source
Requirements
- A current Gunnison County Building Contractor License (Class A, B, or C matching the scope of work) is REQUIRED on all commercial building permit applications, including additions and IEBC Level 2/3 alterations — Town Code Sec. 6-19(5) and Sec. 6-128 (Ordinance No. 6, Series 2024). Unlike residential, the owner-builder exception in Sec. 6-19(5) applies ONLY to property owners of an individual R-1, R-2, or R-3 UNIT acting as their own contractor — a genuinely commercial (non-residential) occupancy has no owner-builder exception at all
- Site survey/plat by a Colorado-licensed land surveyor is required for new construction, but is explicitly WAIVED under Town Code Sec. 6-19(2) when 'a building permit is sought to reconstruct or remodel totally within the limits of an existing building or structure' — i.e., a typical tenant improvement/interior remodel confined to an existing shell does not require a new survey/plat
- Crested Butte Fire Protection District (CBFPD) approval letter required confirming access, gas meter location, and water supply comply with Town Code Chapter 8 (Sec. 6-19(3))
- Construction Management Plan (CMP) required, addressing on-site parking, material staging, road cleaning, trash/toilet facilities, temporary safety fencing, hours of construction, traffic control, snow storage/removal, dust mitigation, and sediment/erosion control (Sec. 6-19(4))
- Evidence of Mt. CB Water & Sanitation District tap fee payment, or a written waiver signed by the District's superintendent, required before permit issuance if the project taps into the water/sewer system (Sec. 6-19(6))
- Design Review and Permit Review are conducted CONCURRENTLY through the Community Development Department, per the Town's general (not commercial-specific) combined-process description; Design Review approval, once granted, is valid for 1 year. Proposed development within the Downtown Development Authority (DDA) District receives additional Community Development Department review for DDA compliance, per the Town's own description of the Building Division's role
- Design Review Scheduling Floor — CONFIRMED THIS SESSION (2026-08-02) directly from Town Code Chapter 21 (Zoning), Article V (Design Review), Sec. 21-303 (Approval Procedure), a genuinely new source for this file (via ecode360.com/MT4975): design review for any development OTHER than 'single-family residential areas of PUDs and the SFR zone districts' (Sec. 21-303(a), handled administratively by the zoning administrator, no fixed timeline) — i.e., essentially all commercial/Business District/Commercial District/PAD development — is decided by the Planning Commission, and Sec. 21-303(b) requires the zoning administrator to schedule that hearing 'no less than 14 days and no later than 28 days after the receipt of all such materials.' This is a genuine numeric floor for scheduling the initial hearing, NOT a guaranteed decision/completion time: Sec. 21-303(d) lets the Planning Commission table or continue action 'to a date certain' with no outer limit stated, and the separate concurrent Building/Permit Review step (Article II of Chapter 6, IBC Sec. 105.3, re-confirmed this session to be amended only to add application-content subparagraphs, NOT a review-turnaround timeframe) still carries no Town-published numeric SLA at all
- Downtown Development Authority (DDA) Carve-Out — Town Code Sec. 21-301(d): commercial/development projects within the DDA District boundary do NOT follow the Sec. 21-303 procedure above at all; they instead 'shall follow the design review policies and design standards of the Mt. Crested Butte Downtown Development Authority Architectural and Site Design Standards,' a separate DDA-authored document. That document was checked for this session directly on the Town's DDA page (mtcb.colorado.gov/government/downtown-development-authority-dda) and was not found published/linked there — its own review timeline, if any, remains unconfirmed
- Fire alarm systems, where required by IBC Sec. 907.2, must meet International Fire Code Sec. 907.8.2 as identified in Town Code Chapter 8 (Sec. 6-25)
- Ice barrier underlayment required on all roofs (Sec. 6-31, amending IBC Sec. 1507.2.8.2), except detached accessory structures without conditioned floor area
- Design snow load of 155 psf per the 2016 SEAC Colorado Design Snow Loads (Sec. 6-32, amending IBC Sec. 1608.1) applies to commercial construction the same as residential
- Minimum footing depth of 36 inches below finished grade unless an alternative is engineer-recommended (Sec. 6-33)
- No local IBC-Article-II amendment to Chapter 9 (Fire Protection Systems) automatic-sprinkler trigger comparable to Article III's residential Sec. 6-59 was found — commercial sprinkler requirements were not confirmed to follow a Town-specific threshold and should be assumed to follow the unamended 2021 IBC Chapter 9 provisions by occupancy/area unless the Building Division states otherwise
- Tenant improvements/alterations to existing commercial buildings are governed by the IEBC (Town Code Article IX, Sec. 6-126 et seq.) as Level 1/2/3 alterations; Level 2/3 alterations require the same Gunnison County Contractor License proof as new construction (Sec. 6-128)
- Electrical and plumbing work is NOT reviewed or inspected by the Town — those permits/inspections are obtained separately and directly from the State of Colorado (Colorado Electrical Board and Colorado State Plumbing Board), the same statewide carve-out documented for residential permits in this file
- 3% Use Tax on construction/building materials, calculated on 50% of estimated total valuation (or documented actual materials valuation), reconciled within 90 days of Certificate of Occupancy issuance or final inspection approval — Town Code Sec. 19-105/19-21, which is not restricted to residential projects
- Contractor must hold a current Mt. CB Business License (BOLF)
Required documents
- RequiredBuilding Permit Application (fillable form)Same generic application form used Town-wide for all Building Division permits, submitted via app.govwell.com/mtcb
- RequiredDesign and Permit Review Application (GovWell portal)
- OptionalSite survey/plat by a Colorado-licensed land surveyorRequired for new construction; waived for remodels confined entirely within an existing building's limits (Sec. 6-19(2))
- RequiredCrested Butte Fire Protection District approval letter
- RequiredConstruction Management Plan (CMP)
- RequiredGunnison County Building Contractor License (Class A, B, or C matching scope)
- OptionalMt. CB Water & Sanitation District Tap Fee Receipt or written waiver
- RequiredMt. CB Business License (BOLF) for General Contractor
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation $1.00 to $500.00 | $23.50 | Town Code Sec. 6-21, Table 1-A (IBC Sec. 109.2, as locally amended) — same valuation-tiered schedule confirmed identical to the residential Table R1-A (Sec. 6-52); set directly in Ordinance No. 6, Series 2024 |
| Building Permit Fee — valuation $501.00 to $2,000.00 | $23.50 for the first $500 plus $3.05 per additional $100 or fraction thereof | — |
| Building Permit Fee — valuation $2,001.00 to $25,000.00 | $69.25 for the first $2,000 plus $14.00 per additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $25,001.00 to $50,000.00 | $391.75 for the first $25,000 plus $10.10 per additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $50,001.00 to $100,000.00 | $643.75 for the first $50,000 plus $7.00 per additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $100,001.00 to $500,000.00 | $993.75 for the first $100,000 plus $5.60 per additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $500,001.00 to $1,000,000.00 | $3,233.75 for the first $500,000 plus $4.75 per additional $1,000 or fraction thereof | — |
| Building Permit Fee — valuation $1,000,001.00 and up | $5,608.75 for the first $1,000,000 plus $3.65 per additional $1,000 or fraction thereof | — |
| Plan Check Fee | 65% of the Building Permit Fee | Town Code Sec. 6-21 amending IBC Sec. 109.5; separate from and in addition to the permit fee |
| Inspections Outside Normal Business Hours (Table 1-B) | $47.00 per hour, 2-hour minimum charge | Town Code Sec. 6-22, Table 1-B, amending IBC Sec. 110; or the Town's actual hourly cost, whichever is greater |
| Re-inspection Fee (Table 1-B) | $47.00 per hour, 2-hour minimum charge | Applies after the initial inspection and one reinspection |
| Additional Plan Review from Changes/Additions/Revisions (Table 1-B) | $47.00 per hour, 2-hour minimum charge | — |
| Use of Outside Consultants for Plan Checking/Inspections/Enforcement (Table 1-B) | Actual costs | Includes administrative, attorney, and overhead costs |
| Design Review Fee — Application requiring drawings/engineering | $200.00 | Resolution No. 9, Series 2026 Fee Schedule, Design Review Fees table (example given is a residential deck); Show full citationHideResolution No. 9, Series 2026 Fee Schedule, Design Review Fees table (example given is a residential deck); the Fee Schedule does not state an explicit unit-count threshold distinguishing when this generic tier vs. the dedicated Accommodation/Commercial Unit tier below applies to a single small commercial tenant space — genuinely ambiguous from the primary source, not independently confirmed with the Building Division |
| Design Review Fee — 'Accomdation [sic] Units, and Commerical [sic] Unit' Base Fee | $1,500.00 | Resolution No. 9, Series 2026 Fee Schedule, Design Review Fees table, quoted verbatim including the Town's own apparent typos ('Accomdation', 'Commerical'); Show full citationHideResolution No. 9, Series 2026 Fee Schedule, Design Review Fees table, quoted verbatim including the Town's own apparent typos ('Accomdation', 'Commerical'); distinct from and priced above the Single Family Residence ($700) and equal to the Multi-Family Residential ($1,500) Design Review base fees |
| Design Review Fee — Accommodation/Commercial Unit charge, 2 to 5 units | $100.00 per unit | Per Resolution No. 9, Series 2026 Fee Schedule; charged in addition to the $1,500 base fee |
| Design Review Fee — Accommodation/Commercial Unit charge, 6 to 10 units | $75.00 per unit | — |
| Design Review Fee — Accommodation/Commercial Unit charge, 11 units or more | $50.00 per unit | — |
| Design Review Compliance and Cleanup Deposit — valuation $1,000-$4,999 | $500 | Town Code Sec. 109.7, added to IBC Sec. 109 within Article II — confirmed to apply to IBC-governed (commercial) permits, not just the residential/IRC track |
| Design Review Compliance and Cleanup Deposit — valuation $5,000-$9,999 | $1,000 | — |
| Design Review Compliance and Cleanup Deposit — valuation $10,000-$49,999 | $2,000, or 2% of total valuation for higher tiers per the Building Official's determination | — |
| Use Tax | 3% of 50% of total estimated project valuation | Town Code Sec. 19-105/19-21; reconciled within 90 days of CO issuance or final inspection approval |
| Work Done without a Building Permit | $100.00 or the permit fee, whichever is greater | Resolution No. 9, Series 2026 Fee Schedule |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mount Crested Butte building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.