Mountain View building permits
VerifiedMountain View, Colorado — as published 2026-07-07.
Verified 2026-07-23 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family or multi-family residential construction in the Town of Mountain View. Reviewed by SAFEbuilt on behalf of the Town's Building Department under the 2021 IRC (as referenced in the Town's current Helpful Building Permit Handouts and Building Permit Application) plus current-edition NEC and IPC for electrical/plumbing systems.
Verified 2026-07-23 · Source
Requirements
- Submit a completed Town of Mountain View Building Permit Application (paper/PDF or via the CommunityCore online portal) with a Plot Plan and Use Tax Calculation valuation form
- No Town of Mountain View contractor license or registration is required, but all work must meet applicable municipal and building code requirements; contractors must create a CommunityCore login for registration/user-interface purposes
- A completed application, use-tax valuation form, copy of contractor's license (if applicable, from any surrounding municipality), and proof of contractor's liability insurance must be emailed to the Building Department to obtain a permit
- Use Tax (50% of total project valuation x 3% Town use-tax rate) is due at time of permit issuance; project valuation is determined by the Town Building Inspector using the ICC Building Valuation Data table
- A hard-stock permit card must be posted in the front window of the property, visible from the street, for the duration of construction
- GOVERNING FIGURE (corrected 2026-07-23): per the Town's codified Municipal Code §18.02.040, work must commence within 60 days of permit issuance or the permit expires/is cancelled by the Town, and must be substantially completed within 2 years of issuance or it likewise expires. The Town's own Building Permit Application (page 2 Notice section, PDF 'Updated: 2022') separately states a conflicting 180-day commencement/work-stoppage figure ('In the event construction is not commenced within 180 days of issuance of this permit, then the same is automatically void. Cessation of work for a period of 180 continuous days shall also cause this permit to be void.'); the codified ordinance governs, but applicants should be aware the form itself prints the longer 180-day figure. Permits are not transferable.
Required documents
- RequiredBuilding Permit ApplicationTown of Mountain View's own 3-page application form (Job info, contacts, square footage/use/utilities/improvement type, valuation, fees, signature); available as a fillable PDF or via CommunityCore
- RequiredPlot PlanSite plan showing the structure and lot lines/setbacks
- RequiredUse Tax CalculationValuation form used to compute the Town's use tax at 50% of total project valuation x 3%
- OptionalContractor's License CopyRequired if applicable, from any surrounding municipality (Mountain View itself does not license contractors)
- RequiredProof of Liability InsuranceContractor's certificate of liability insurance
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Fee | $40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; $3,233.75 for the first $500,000.00 plus $4.75 per additional $1,000.00 (or fraction) from $500,001.00-$1,000,000.00; $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 (or fraction) above $1,000,000.00 | GAP CLOSED 2026-07-23: full 'Total Valuation / Building Permit Fee' table transcribed verbatim from Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule' (Chapter 18 - Building Regulations, 'Building Permit Fees Set By Resolution' table, updated 12/12/2024; fetched live at tomv.org/media/2046, HTTP 200, PDF text-extracted and verified). This is the Town's single, universal valuation-based Building Permit Fee schedule (no separate commercial/residential columns); it governs the Application's 'Permit Fee $___' line for every permit type. Supersedes prior 'no published dollar table' note, which reflected only the Building Department's public-facing webpages, not its Council resolution archive. |
| Plan Review Fee | 65% of the Building Permit Fee | GAP CLOSED 2026-07-23: per Resolution No. 2024-12-16H, Exhibit A Fee Schedule ('Plan Review Fees by Resolution' table, updated 12/12/2024, tomv.org/media/2046). Must be paid up front, prior to plan review taking place, per the Building Department FAQ. |
| Use Tax | Total project valuation x 50% (assumed materials share) x 3% (Town use-tax rate) | e.g. $100,000 valuation = $50,000 assumed materials x 3% = $1,500 use tax due at permit issuance; per the Town's Use Tax Guidelines PDF and Building Department FAQ (identical formula and worked example in both) |
| Deposit | Amount varies; listed as its own line item on the Building Permit Application | Application form includes a 'Deposit $___' field distinct from the Permit Fee |
Residential Addition / Remodel Permit
VerifiedRequired for additions, garage/attic/sunroom conversions to habitable space, kitchen/basement/bathroom remodels, and structural modifications to existing residential structures in Mountain View.
Verified 2026-07-23 · Source
Requirements
- Same application, valuation, use-tax, and insurance-documentation process as new residential construction
- Town Building Department FAQ explicitly lists 'Additions,' 'Remodeling IE: Kitchen remodel, Basement finish, Bathroom remodel, etc.,' 'Garage Conversions, Attic Space Conversion and Sunroom Conversions to habitable space,' and 'Structural Modifications' among common projects requiring a permit
- A Licensed professional (not homeowner self-performed) is required if the home is intended for immediate sale/resale or is a rental occupied/to-be-occupied by tenants
Required documents
- RequiredBuilding Permit ApplicationSame Town application form used for all Building Department permit types
- RequiredPlot PlanRequired for additions affecting the building footprint/setbacks
- RequiredUse Tax CalculationValuation form for the addition/remodel scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Fee | $40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; $3,233.75 for the first $500,000.00 plus $4.75 per additional $1,000.00 (or fraction) from $500,001.00-$1,000,000.00; $5,608.75 for the first $1,000,000.00 plus $3.65 per additional $1,000.00 (or fraction) above $1,000,000.00 | GAP CLOSED 2026-07-23: per Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule' (Chapter 18 - Building Regulations, 'Building Permit Fees Set By Resolution' table, updated 12/12/2024, tomv.org/media/2046, HTTP 200). Applied to the addition/remodel's stated total valuation, same as new construction. |
| Plan Review Fee | 65% of the Building Permit Fee | GAP CLOSED 2026-07-23: per Resolution No. 2024-12-16H, Exhibit A Fee Schedule ('Plan Review Fees by Resolution' table, updated 12/12/2024). Paid up front, before review, per the Building Department FAQ. |
| Use Tax | Total valuation x 50% x 3% | Applies to additions that add new materials/value; interior remodels are valued per the same formula on the remodel's stated valuation |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Mountain View. Issued directly by the Town's own Building Department (via SAFEbuilt) rather than deferred entirely to the Colorado State Electrical Board, though state electrical licensure is contemporaneously verified per Colorado statute. Homeowners may self-perform electrical work on their own non-rental, non-resale dwelling under a Homeowner Permit.
Verified 2026-07-23 · Source
Requirements
- Governed by the current edition of the National Electrical Code (NEC) as adopted by the Town, per the Building Permit Application's Homeowner Electrical/Plumbing certification page
- Electrical contractors must provide a Colorado contractor license number on the Building Permit Application (Electricity Contact section); the Town performs contemporaneous review of electrical licensure per its published 'Procedure for Contemporaneous Reviews of Electrical and Plumbing Licenses' (developed under HB19-1086/SB19-156, now C.R.S. Title 12 Article 115)
- No Town of Mountain View contractor license is separately required
- Homeowner permits available for a homeowner's own dwelling (not intended for immediate sale/resale, not a tenant-occupied rental); homeowner-performed work requires a minimum of two inspections (before concealment, and at completion/prior to power release)
Required documents
- RequiredBuilding Permit Application (Electricity Contact section)Same combined Town application form; Electricity Contact fields require license #, contact info
- OptionalHomeowner Electrical and Plumbing Permit Certification (page 3 of Application)Required signed certification if a homeowner is self-performing electrical or plumbing work on their own dwelling
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Fee | $40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; continuing per the same table above $500,000.00 | GAP CLOSED 2026-07-23: the Building Permit Application's 'Electrical $___' field (under Value of Construction) captures the electrical scope's own stated valuation; the Town charges the SAME general Council-adopted Building Permit Fee valuation table (Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule,' updated 12/12/2024, tomv.org/media/2046) against that valuation — Mountain View publishes no SEPARATE, electrical-only dollar table distinct from this general schedule. Plus a Plan Review Fee of 65% of the resulting fee, per the same resolution. |
| Plan Review Fee | 65% of the Electrical Fee (Building Permit Fee schedule) | GAP CLOSED 2026-07-23: per Resolution No. 2024-12-16H, Exhibit A Fee Schedule ('Plan Review Fees by Resolution' table, updated 12/12/2024). |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Mountain View. Issued directly by the Town's own Building Department (via SAFEbuilt), governed by the current edition of the International Plumbing Code (IPC) as adopted by the Town. State plumbing licensure is contemporaneously verified per Colorado statute; homeowners may self-perform plumbing work on their own non-rental, non-resale dwelling under a Homeowner Permit.
Verified 2026-07-23 · Source
Requirements
- Governed by the current edition of the IPC as adopted by the Town, per the Building Permit Application's Homeowner Electrical/Plumbing certification page
- Plumbing contractors must provide a Colorado contractor license number on the Building Permit Application (Plumbing Contact section); contemporaneous license review is performed per the Town's published verification procedure (developed under HB19-1086, now C.R.S. Title 12 Article 155)
- No Town of Mountain View contractor license is separately required
- Homeowner permits available under the same conditions as electrical: own dwelling only, not for immediate sale/resale, not a tenant-occupied rental
Required documents
- RequiredBuilding Permit Application (Plumbing Contact section)Same combined Town application form; Plumbing Contact fields require license #, contact info
- OptionalHomeowner Electrical and Plumbing Permit Certification (page 3 of Application)Required if a homeowner is self-performing plumbing work on their own dwelling
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Fee | $40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; continuing per the same table above $500,000.00 | GAP CLOSED 2026-07-23: the Application's 'Plumbing $___' field captures the plumbing scope's own stated valuation; the Town charges the SAME general Council-adopted Building Permit Fee valuation table (Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule,' updated 12/12/2024, tomv.org/media/2046) against that valuation — no separate plumbing-only dollar table is published. Plus a Plan Review Fee of 65% of the resulting fee, per the same resolution. |
| Plan Review Fee | 65% of the Plumbing Fee (Building Permit Fee schedule) | GAP CLOSED 2026-07-23: per Resolution No. 2024-12-16H, Exhibit A Fee Schedule ('Plan Review Fees by Resolution' table, updated 12/12/2024). |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, and ventilation equipment installation or replacement in Mountain View, including furnaces, heat pumps, mini-splits, and AC units.
Verified 2026-07-23 · Source
Requirements
- Town Building Department FAQ explicitly lists 'Replacement or new Mechanical Appliances: IE-Furnaces, heat pumps, mini-splits, AC units, etc.' among projects requiring a permit
- Mechanical/HVAC contractors provide contact info on the Heating Contact section of the Building Permit Application
- No Town of Mountain View contractor license is separately required
Required documents
- RequiredBuilding Permit Application (Heating Contact section)Same combined Town application form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Gas / Mechanical Fee | $40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; continuing per the same table above $500,000.00 | GAP CLOSED 2026-07-23: the Application form's 'Gas $___' valuation-of-construction line (mechanical work is billed under Gas, per the Town's own form; no separate itemized Mechanical line exists) feeds into the SAME general Council-adopted Building Permit Fee valuation table (Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule,' updated 12/12/2024, tomv.org/media/2046) — no mechanical/gas-specific dollar table is published separately. Plus a Plan Review Fee of 65% of the resulting fee, per the same resolution. |
| Plan Review Fee | 65% of the Gas / Mechanical Fee (Building Permit Fee schedule) | GAP CLOSED 2026-07-23: per Resolution No. 2024-12-16H, Exhibit A Fee Schedule ('Plan Review Fees by Resolution' table, updated 12/12/2024). |
Reroofing Permit
VerifiedRequired for roof replacement/reroofing in Mountain View. The Town's current live materials point to a general reroof-guide handout (2021 IRC-based, via the Colorado Chapter ICC), and this 2021 IRC edition is now directly confirmed by the Town's own live Municipal Code (Section 18.13.010, accessed 2026-07-23 at mountainview.municipal.codes/Code/18.13: 'The International Residential Code, 2021 Edition ... is hereby adopted'); an older, legacy Town-hosted page separately details specific 2015-IRC-referenced Residential Roofing Requirements, which is confirmed superseded rather than merely suspected, since the Town's live ordinance text establishes 2021 (not 2015) as the current-adopted edition.
Verified 2026-07-23 · Source
Requirements
- Reroofing/roof replacement is explicitly listed as requiring a permit on the Town's Building Department FAQ
- Current live guidance: the Town's 'Helpful Building Permit Handouts' page links a 'Residential Re-roof' guide developed by the Colorado Chapter of the International Code Council as a 2021 IRC-based basic plan submittal guide
- Legacy page detail (flagged as possibly superseded, not confirmed current): roof replacement must remove existing roof coverings down to the deck; asphalt shingles fastened to solidly sheathed decks and tested to ASTM D7158; drip edge required at eaves/rakes; specific valley-lining and fastener specifications listed; a ladder tied off to the roof required on-site for inspection
Required documents
- RequiredBuilding Permit ApplicationSame combined Town application form; Improvement Type section includes a 'Roof' checkbox
- OptionalResidential Re-roof Guide (Colorado Chapter ICC handout)General submittal/requirements guide linked from the Town's Helpful Building Permit Handouts page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Fee | $40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; continuing per the same table above $500,000.00 | GAP CLOSED 2026-07-23: this entry's earlier 'no published dollar table' note (and the file's own confidenceNote/reviewTimelineNote text) had stated the Resolution No. 2024-12-16H fee schedule was already 'applied to' this permit type, but on this pass the fees[] amount had NOT actually been filled — corrected here. Per Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule' (Chapter 18 - Building Regulations, 'Building Permit Fees Set By Resolution' table, updated 12/12/2024, tomv.org/media/2046, HTTP 200), applied to the reroof's stated project valuation, same as other Building Department permit types. Town's general Building Department FAQ separately describes basic permits like roof replacements as having a faster review tier under the legacy page's older (now-superseded) timeline scheme (see reviewTimelineNote). |
| Plan Review Fee | 65% of the Permit Fee | GAP CLOSED 2026-07-23: per Resolution No. 2024-12-16H, Exhibit A Fee Schedule ('Plan Review Fees by Resolution' table, updated 12/12/2024). |
Rooftop Solar / Photovoltaic Permit
VerifiedRequired for solar panel installation in Mountain View.
Verified 2026-07-20 · Source
Requirements
- Solar Panels are explicitly listed on the Town's Building Department FAQ among projects requiring a permit
- Governed by the current-edition NEC for the electrical/interconnection portion of the installation
- Electrical contractor license and contemporaneous state license verification apply, per the Town's general electrical-permit procedure
Required documents
- RequiredBuilding Permit Application (Electricity Contact section, 'Solar' checkbox under Type of Heat/Utilities)Same combined Town application form; Utilities section includes a 'Solar' checkbox
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Fee (solar interconnection scope) | Statewide valuation-based schedule under C.R.S. § 12-23-117: base fee ~$100-$120 for job valuation up to $2,000, plus roughly $10-$11.50 per $1,000 of valuation above that, which any Colorado local government (including Mountain View) may scale up to 1.15x — capped in aggregate at $500 residential/$1,000 commercial by C.R.S. § 24-48.5-113 | Mountain View's own Building Department confirms all fees, including Electrical, are valuation-based with no published dollar table anywhere on the Town's site (as previously documented). However, Colorado electrical inspections are a matter of statewide concern under C.R.S. § 12-23-117 — no local government may charge more than 1.15x the DORA State Electrical Board's own fee schedule, or impose any other electrical fee or charge. That statewide base schedule (townoflarkspur.org/media/2901, hosted live by the Town of Larkspur, CO, printed with DORA's own Denver address/phone) sets Section B "Commercial and other fees" (which Larimer County's current Table 1-E, larimer.org/sites/default/files/2020_electrical_fee_table.pdf, explicitly confirms includes solar) at $100 base for valuation up to $2,000, plus $10/thousand above. This governs the ceiling and formula for whatever Mountain View ultimately charges, even though the Town's own specific multiplier was not independently published. |
Electric Vehicle (EV) Charger Permit
VerifiedMountain View publishes no distinct EV-charger permit type or fee line. A new circuit, outlet, or panel/service upgrade to serve an EV charger falls under the Town's standard Electrical Permit, issued directly by the Building Department (via SAFEbuilt) with contemporaneous Colorado electrical-license verification. The Town's population (approximately 501 in 2024) is far below the 10,000-resident municipal threshold that triggers Colorado HB24-1173's EV-charging-permit mandate, so Mountain View is not confirmed to be legally required to have adopted EV-specific permitting standards.
Verified 2026-07-23 · Source
Requirements
- A new circuit, outlet, or panel/service upgrade to serve an EV charger requires an Electrical Permit under the current edition of the NEC as adopted by the Town
- Electrical contractors must provide a Colorado contractor license number on the Building Permit Application (Electricity Contact section); the Town performs contemporaneous review of electrical licensure
- Homeowners may self-perform the work on their own non-rental, non-resale dwelling under a Homeowner Permit, requiring a minimum of two inspections
- No EV-specific application, checklist, or expedited process was found published — apply via the standard combined Building Permit Application, Electricity Contact section
Required documents
- RequiredBuilding Permit Application (Electricity Contact section)Same combined Town application form; describe scope as new circuit/outlet or service upgrade for EV charging
- OptionalHomeowner Electrical and Plumbing Permit Certification (page 3 of Application)Required signed certification if a homeowner is self-performing the EV charger circuit work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building/Electrical Permit Fee (valuation-based, Council-adopted schedule) | Per Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule' (Chapter 18 - Building Regulations, 'Building Permit Fees Set By Resolution' table, updated 12/12/2024): $40.00 for valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) up to $2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 from $100,001.00-$500,000.00; continuing to scale down per-$1,000 above that | Exhaustive re-chase 2026-07-23: this is the Town's ONLY Council-adopted, itemized dollar-figure permit-fee table found anywhere in Town records — a general 'Building Permit Fee' schedule set by resolution and applied to the stated valuation of the permitted work (consistent with the Building Official's ICC Building Valuation Data practice already documented elsewhere in this file). No SEPARATE, EV-charger- or electrical-only-specific dollar table exists in the Town's Municipal Code, resolution archive, or public Building Department materials, so this general valuation-based schedule is what governs the Building Permit Application's 'Electrical $___' fee line for an EV-charger circuit. Found via tomv.org's live Council Meeting Materials archive (tomv.org/media/2046, HTTP 200, fetched 2026-07-23) — NOT linked from the public-facing Building Department webpage, which is why the earlier 2026-07-20 re-chase (see confidenceNote) did not surface it. Plan Review Fee is separately set at 65% of the Building Permit Fee under the same resolution (see next fee line). Caveat: the resolution states Town fees are intended to be 're-stated annually in one document' for administrative efficiency; this file checked the Town's Sep 15, 2025 and Dec 15, 2025 Council meeting agendas directly (both live primary sources) and found no subsequent fee-schedule resolution, so the Dec 2024 Exhibit A remains the most recent one identified and is treated as still governing, though a later restatement cannot be ruled out with certainty. |
| Plan Review Fee | 65% of the Building Permit Fee | Per Resolution No. 2024-12-16H, Exhibit A Fee Schedule (Chapter 18 - Building Regulations, 'Plan Review Fees by Resolution'), fetched live 2026-07-23 |
Demolition Permit
VerifiedRequired for demolition work in Mountain View, including a State asbestos permit component for structures subject to Colorado asbestos regulations.
Verified 2026-07-23 · Source
Requirements
- Demolition Work is explicitly listed on the Town's Building Department FAQ among projects requiring a permit
- The Building Permit Application's Demolition section (F) includes checkboxes for Site Plan, State Permit, and Asbestos Permit — indicating a State-level asbestos permit is a distinct required component tracked alongside the Town demolition permit
Required documents
- RequiredBuilding Permit Application (Demolition section)Section F of the Town's application: Site Plan, State Permit, Asbestos Permit checkboxes
- RequiredSite PlanRequired for demolition scope
- OptionalAsbestos Permit (State of Colorado)Required where applicable per Colorado asbestos regulations, tracked as a distinct checkbox on the Town's own application
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Fee | $40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; continuing per the same table above $500,000.00 | GAP CLOSED 2026-07-23: no demolition-specific flat fee is separately published; billed under the same general valuation-based Building Permit Fee table as other permit types, per Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule' (Chapter 18 - Building Regulations, 'Building Permit Fees Set By Resolution' table, updated 12/12/2024, tomv.org/media/2046). |
| Plan Review Fee | 65% of the Permit Fee | GAP CLOSED 2026-07-23: per Resolution No. 2024-12-16H, Exhibit A Fee Schedule ('Plan Review Fees by Resolution' table, updated 12/12/2024). |
Deck / Covered Patio / Patio Enclosure Permit
VerifiedRequired for decks, patio covers, and patio enclosures in Mountain View.
Verified 2026-07-23 · Source
Requirements
- Decks and Patio Enclosures are explicitly listed on the Town's Building Department FAQ among projects requiring a permit
- The Town's Helpful Building Permit Handouts page links Colorado Chapter ICC 2021-IRC-based guides for 'Decks,' 'Patio Cover,' and 'Enclosing a Patio Cover' specifically
- Building Permit Application's Improvement Type/Square Footage sections include explicit Deck, Covered Porch, and Patio (Attached/Detached) checkboxes
Required documents
- RequiredBuilding Permit Application (Improvement Type / Square Footage sections)Same combined Town application form; includes Deck, Covered Porch, and Patio checkboxes
- OptionalDecks Building Guide (Colorado Chapter ICC, 2021 IRC)General submittal/requirements guide for uncovered decks
- OptionalPatio Cover Building Guide (Colorado Chapter ICC, 2021 IRC)General submittal/requirements guide for patio covers
- OptionalEnclosing a Patio Cover Building Guide (Colorado Chapter ICC, 2021 IRC)General submittal/requirements guide for enclosing an existing patio cover
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Fee | $40.00 for total valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) from $501.00-$2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 (or fraction) from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 (or fraction) from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 (or fraction) from $100,001.00-$500,000.00; continuing per the same table above $500,000.00 | GAP CLOSED 2026-07-23: per Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule' (Chapter 18 - Building Regulations, 'Building Permit Fees Set By Resolution' table, updated 12/12/2024, tomv.org/media/2046), applied to the deck/patio's stated project valuation. |
| Plan Review Fee | 65% of the Permit Fee | GAP CLOSED 2026-07-23: per Resolution No. 2024-12-16H, Exhibit A Fee Schedule ('Plan Review Fees by Resolution' table, updated 12/12/2024). |
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mountain View building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.