Skip to main content
PermitBase

Version history — Mountain View, Colorado

This is PermitBase’s own verified record for Mountain View, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Mountain View’s actual law was at that time.

Permanent link to today’s record

/colorado/jefferson-county/mountain-view/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
  • 2026-08-25Superseded
  • 2026-08-21Superseded
    • Mountain View, Colorado — adopted-codes record updated
    • Mountain View, Colorado — Fire Sprinkler / Fire Alarm System Permit fee record updated: Not itemized on the page retrieved during this review → Not itemized on the Town's published page
  • 2026-08-20Superseded
  • 2026-08-17Superseded
  • 2026-08-14Superseded
    • Mountain View, Colorado — Sign Permit record added
    • Mountain View, Colorado — Fire Sprinkler / Fire Alarm System Permit record added
    • Mountain View, Colorado — Change of Use / Change of Occupancy record added
  • 2026-08-02Superseded
    • Mountain View, Colorado — Residential Building Permit (New Construction) fee record updated: Total project valuation x 50% (assumed materials share) x 3% (Town use-tax rate) → Total project valuation x 50% (assumed materials share) x 4% (Town use-tax rate)
    • Mountain View, Colorado — Residential Addition / Remodel Permit fee record updated: Total valuation x 50% x 3% → Total valuation x 50% x 4%
    • Mountain View, Colorado — Commercial Building Permit (New Construction / Shell / Remodel / Addition) fee record updated: Total project valuation x 50% (assumed materials share) x 3% (Town use-tax rate per the Town's Use Tax Guidelines PDF) → Total project valuation x 50% (assumed materials share) x 4% (Town use-tax rate)
    • Mountain View, Colorado — Tenant Improvement / Commercial Tenant Finish Permit fee record updated: Total project valuation x 50% (assumed materials share) x 3% (Town use-tax rate per the Town's Use Tax Guidelines PDF) → Total project valuation x 50% (assumed materials share) x 4% (Town use-tax rate)
    • Mountain View, Colorado — Commercial Building Permit (New Construction / Shell / Remodel / Addition) record added
    • Mountain View, Colorado — Tenant Improvement / Commercial Tenant Finish Permit record added
  • 2026-07-23Superseded
    • Mountain View, Colorado — adopted-codes record updated
    • Mountain View, Colorado — fee schedule re-verified across 8 permit types
    • Mountain View, Colorado — adopted-codes record updated
    • Mountain View, Colorado — Electric Vehicle (EV) Charger Permit fee record added: Building/Electrical Permit Fee (valuation-based, Council-adopted schedule) (Per Resolution No. 2024-12-16H, Exhibit A 'Town of Mountain View Fee Schedule' (Chapter 18 - Building Regulations, 'Building Permit Fees Set By Resolution' table, updated 12/12/2024): $40.00 for valuation $1.00-$500.00; $40.00 for the first $500.00 plus $2.00 per additional $100.00 (or fraction) up to $2,000.00; $70.00 for the first $2,000.00 plus $14.00 per additional $1,000.00 (or fraction) from $2,001.00-$25,000.00; $391.25 for the first $25,000.00 plus $10.10 per additional $1,000.00 from $25,001.00-$50,000.00; $643.75 for the first $50,000.00 plus $7.00 per additional $1,000.00 from $50,001.00-$100,000.00; $993.75 for the first $100,000.00 plus $5.60 per additional $1,000.00 from $100,001.00-$500,000.00; continuing to scale down per-$1,000 above that)
    • Mountain View, Colorado — Electric Vehicle (EV) Charger Permit fee record added: Plan Review Fee (65% of the Building Permit Fee)
    • Mountain View, Colorado — Electric Vehicle (EV) Charger Permit fee record removed: Electrical Fee
    • Mountain View, Colorado — plan-review timeline record updated: 5–10 business days
  • 2026-07-20Superseded
    • Mountain View, Colorado — Electric Vehicle (EV) Charger Permit record added
    • Mountain View, Colorado — Rooftop Solar / Photovoltaic Permit fee record added: Electrical Fee (solar interconnection scope) (Statewide valuation-based schedule under C.R.S. § 12-23-117: base fee ~$100-$120 for job valuation up to $2,000, plus roughly $10-$11.50 per $1,000 of valuation above that, which any Colorado local government (including Mountain View) may scale up to 1.15x — capped in aggregate at $500 residential/$1,000 commercial by C.R.S. § 24-48.5-113)
    • Mountain View, Colorado — Rooftop Solar / Photovoltaic Permit fee record removed: Electrical Fee
  • 2026-07-07Superseded
  • 2026-07-06Initial record — coverage of Mountain View began