Version history — Wheat Ridge, Colorado
This is PermitBase’s own verified record for Wheat Ridge, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Wheat Ridge’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- Wheat Ridge, Colorado — Electrical Permit fee record updated: $85/hour, minimum 1 hour (City's Permit Valuation & Fees page); a separate $60 late-cancellation re-inspection fee is cited on the City's FAQ/Inspections page for day-of cancellations after 8 a.m. → $85/hour, minimum 1 hour (City's Permit Valuation & Fees page); a separate $60 late-cancellation re-inspection fee is cited on the City's Building Inspections page for day-of cancellations after 8 a.m.
- 2026-08-20Superseded
- 2026-08-14Superseded
- Wheat Ridge, Colorado — Sign Permit record added
- Wheat Ridge, Colorado — Fire Sprinkler & Fire Alarm Permit record added
- Wheat Ridge, Colorado — Change of Use / Change of Occupancy Permit record added
- 2026-08-02Superseded
- Wheat Ridge, Colorado — Solar PV Permit fee record added: Solar PV (Commercial) — flat rate ($1,000)
- Wheat Ridge, Colorado — Commercial Building Permit (New Construction / Shell) record added
- Wheat Ridge, Colorado — Tenant Improvement / Tenant Finish Permit record added
- 2026-07-20Superseded
- Wheat Ridge, Colorado — Electric Vehicle Charger Permit record added
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Wheat Ridge began