Fort Collins building permits
Fort Collins, Colorado — as published 2026-06-30.
Reviewed 2026-08-13 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family homes, townhomes, and duplex/ADU new construction in Fort Collins. Reviewed against the 2024 IRC with 2024 Fort Collins Amendments and the 2024 IECC with Fort Collins energy/green amendments. Fee is calculated from the Fee Schedules occupancy-based rate table (R-3 = $0.65/sq ft), split 35% Plan Check / 65% Building Permit.
Verified 2026-06-30 · Source
Requirements
- Submit one permit per detached structure
- Plans must comply with the 2024 IRC with Fort Collins Amendments and 2024 IECC with Fort Collins Amendments (current as of April 1, 2026)
- Residential Energy Code Compliance Form required
- Residential Mechanical Systems Design Submittal (Manual J/D/S load calcs) required for new mechanical systems
- Grading Plan Requirements form required
- Construction Waste and Recycling Management Declaration of Responsibility + Construction Waste Management Report required
- Homeowner Affidavit required if a homeowner is doing the work (self-permitting allowed for owner's own single-family residence, per Contractor Licensing exemptions)
- New Construction Building Permit Fee Form required
- Fee calculated from occupancy category (R-3 Single Family Detached/Duplex = $0.65/sq ft) via the Fee Schedules page: 35% Plan Check Fee due at application, 65% Building Permit Fee due at issuance
- Transportation Capital Expansion Fees (TCEF) apply for new buildings that create additional traffic
Required documents
- RequiredResidential Building Permit Application (PDF, 558KB)Primary application form for new residential construction, emailed to buildingservices@fortcollins.gov
- RequiredNew Construction Building Permit Fee FormUsed with the Fee Schedules occupancy-rate table to calculate Plan Check and Building Permit fees
- RequiredResidential Energy Code Compliance FormDemonstrates compliance with the 2024 IECC and Fort Collins energy amendments
- RequiredResidential Mechanical Systems Design SubmittalManual J/D/S load calculations for new mechanical heating/cooling systems
- RequiredGrading Plan RequirementsSite drainage and grading plan per city drainage requirements for residential permits
- RequiredConstruction Waste and Recycling Management Declaration of Responsibility + ReportWaste diversion documentation required for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — R-3 (Single Family Detached/Duplex) | $0.65 per square foot of project area | City of Fort Collins Fee Schedules page — Applicable Fee Rates Per Square Foot table; example given: 3,500 sq ft x $0.65 = $2,275 total |
| Plan Check Fee | 35% of total fee, due at application | City of Fort Collins Fee Schedules page — Fees for New Construction Projects |
| Building Permit Fee (remainder) | 65% of total fee, due at permit issuance | City of Fort Collins Fee Schedules page |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page — current rates apply; billed via project cost reports at close-out |
| Transportation Capital Expansion Fee (TCEF) | Varies — applies to new buildings/major changes that create additional traffic | City of Fort Collins Fee Schedules page; exact amount not itemized on the general fee page — confirm at application |
Residential Addition / Remodel Permit
VerifiedRequired for residential additions (garage expansions, pop-the-tops, sunrooms, enclosing a covered patio) and remodels (kitchen/bath alterations, basement finishes, layout changes) in Fort Collins. Additions use the same occupancy-based Fee Schedules rate table as new construction; interior remodels use a valuation-based tiered fee table.
Verified 2026-06-30 · Source
Requirements
- Additions: enlarging/expanding enclosed area (pop-the-top, lean-to, garage expansion, sunroom, enclosing a covered patio) — fee calculated via Fee Schedules occupancy rate table
- Remodels: kitchen/bath alterations, interior layout changes, garage/attic/accessory-building-to-living-space conversions, converting living space to bedroom, digging out a crawlspace for a basement, finishing a large attic — fee calculated via the tiered valuation-based Permit Fee table
- Residential Mechanical Systems Design Submittal required if a mechanical system is completely new or the type of heating/cooling is changing
- Residential Energy Code Compliance Form required when a non-heated space becomes heated
- Construction Waste and Recycling Management Declaration of Responsibility required for additions larger than 2,500 sq ft
- Homeowner Affidavit required if homeowner is doing the work
- Basement Finish is processed as its own Fast-Track permit type with a flat $155 Building Permit Fee (see notes)
Required documents
- RequiredBuilding Permit Application (PDF, 619KB)Standard application for residential additions/remodels
- OptionalNew Residential Addition Submittal GuideCity guidance for pop-the-top, garage expansion, sunroom and similar addition scopes
- OptionalResidential Mechanical Systems Design SubmittalManual J/D/S load calcs, required when a new/second primary heating or cooling system is proposed
- OptionalResidential Energy Code Compliance FormRequired when converting unheated to heated space
- OptionalBasement Finish Permit Application (PDF, 501KB)Fast-Track permit application for full/partial residential basement finish; requires an engineer's evaluation letter for structural work including new/larger basement windows
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Addition — occupancy-based (Fee Schedules Table) | $0.65 per square foot (R-3) of added enclosed area | City of Fort Collins Fee Schedules page; same occupancy rate table as new residential construction |
| Residential Remodel (Single Family or Multifamily) — valuation-based | Up to $2,000: flat $105.00. $2,000–$25,000: $105 + $15.50 per additional $1,000. $25,000–$50,000: $461.50 + $10.50 per additional $1,000. $50,000–$100,000: $724.00 + $6.50 per additional $1,000. $100,000–$500,000: $1,049.00 + $60 per additional $10,000 ($6/$1,000 equivalent). Above $500,000: $3,449.00 + $55 per additional $10,000 ($5.50/$1,000 equivalent). | City of Fort Collins Building Permits page — Remodel and Alteration Permits fee table (Residential Remodels, Single Family) |
| Basement Finish (Fast-Track flat fee) | $155.00 | City of Fort Collins Building Permits page — Fast-Track Permits, Basement Finish |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page |
Electrical Permit
VerifiedRequired for outlets, panels, wiring, repairs, lighting, EV chargers, and other electrical work in Fort Collins. The CITY of Fort Collins Building Services issues and reviews electrical permits (not a Colorado state board directly) — but individuals performing electrical work must hold a State of Colorado electrical license, and Master Electricians must additionally register with the City of Fort Collins Contractor Licensing office to work under permits in city limits. Governed by the 2023 NEC (effective Aug. 1, 2023), matching the state-adopted electrical code.
Verified 2026-06-30 · Source
Requirements
- Work included: outlets, panels, wiring, repairs, lighting, electric for ground-mounted pre-fabricated hot tubs, residential EV chargers for single-family detached/duplex/townhomes (Fast-Track eligible)
- If more than one trade is involved, or an unheated space becomes heated, or for commercial EV chargers, submit a Remodel/Alteration permit instead of the Fast-Track Electric permit
- Master Electricians must be licensed by the State of Colorado (Supervisor relationship) AND separately register with the City of Fort Collins (no additional City exam required for the registration)
- General/Trade Contractors performing electrical work as part of broader scope need the applicable City of Fort Collins contractor license
- Commercial EV charging stations require accessible parking/EV charging compliance documentation
Required documents
- RequiredElectric Permit Application (PDF, 432KB)Fast-Track application for residential/light-commercial electrical work
- OptionalHomeowner Affidavit (PDF, 469KB)Required if a homeowner is doing the electrical work themselves
- OptionalOwner Authorization Form (PDF, 374KB)Required for commercial electrical permits
- RequiredMaster License Registration Packet (PDF, 620KB)Required for Master Electricians to register with the City, in addition to their State of Colorado license
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electric (Fast-Track Building Permit Fee) | $65.00 | City of Fort Collins Building Permits page — Fast-Track Permits, Electric |
| EV Charger (Commercial and Multifamily) — valuation-based | Up to $2,000: flat $105.00. $2,000–$25,000: $105 + $15.50 per additional $1,000. $25,000–$50,000: $461.50 + $10.50/$1,000. $50,000–$100,000: $724.00 + $6.50/$1,000. $100,000–$500,000: $1,049.00 + $6/$1,000. Above $500,000: $3,449.00 + $5.50/$1,000. | City of Fort Collins Building Permits page — Remodel and Alteration Permits, EV Charger (Commercial and Multifamily) |
| Master Electrician Registration (new/reinstatement) | $300.00 (License and Supervisor's Certificate, new or reinstatement) | City of Fort Collins Contractor Licensing page — Fees table; renewal is $225.00 |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page |
Plumbing Permit
VerifiedRequired for water, sewer, gas piping and valve work in Fort Collins. The CITY of Fort Collins Building Services issues and reviews plumbing permits directly — individuals performing plumbing work must hold a State of Colorado plumbing license, and Master Plumbers must additionally register with the City of Fort Collins. Governed by the 2024 International Plumbing Code (IPC) with Fort Collins Amendments (Fort Collins uses the IPC, unlike Reno's UPC).
Verified 2026-06-30 · Source
Requirements
- Work included: water, sewer, gas piping and valves
- If more than one trade is involved (HVAC, electric, plumbing), submit a Remodel/Alteration permit instead of the Fast-Track Plumbing permit
- If a gas line is installed for a heater, submit a Mechanical permit instead
- Master Plumbers must be licensed by the State of Colorado (Supervisor relationship) AND separately register with the City of Fort Collins (no additional City exam required)
- Governed by the 2024 IPC with Fort Collins Amendments (current as of April 1, 2026); Colorado Plumbing Code also referenced on the Building Code page
Required documents
- RequiredPlumbing Permit Application (PDF, 432KB)Fast-Track application for plumbing work
- OptionalHomeowner Affidavit (PDF, 469KB)Required if a homeowner is doing the plumbing work themselves
- OptionalOwner Authorization Form (PDF, 374KB)Required for commercial plumbing permits
- RequiredMaster License Registration Packet (PDF, 620KB)Required for Master Plumbers to register with the City
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing (Fast-Track Building Permit Fee) | $65.00 | City of Fort Collins Building Permits page — Fast-Track Permits, Plumbing |
| Master Plumber Registration (new, renewal or reinstatement) | $200.00 | City of Fort Collins Contractor Licensing page — Fees table |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, ductwork, exhaust, mini-splits, heat pumps, air handlers, rooftop unit replacement, A/C, furnaces, and water heaters in Fort Collins. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel and Gas Code (IFGC) with Fort Collins Amendments.
Verified 2026-06-30 · Source
Requirements
- Work included: heating, cooling, ductwork, exhaust, mini-splits, heat pump, air handler, rooftop unit (RTU) replacement, A/C and furnace
- If more than one trade is involved, or an unheated space becomes heated, submit a Remodel/Alteration permit instead
- If an RTU is a new size, weight or location, submit a structural evaluation from a Colorado-licensed structural engineer
- Water heater replacement is its own Fast-Track line item under the Heating/Cooling permit application, billed per water heater
- For a water heater replacement in a commercial food service establishment, also contact the Larimer County Health Department
Required documents
- RequiredHeating or Cooling Permit Application (PDF, 483KB)Fast-Track application covering furnace, A/C, heat pump, mini-split, and water heater work
- OptionalHomeowner Affidavit (PDF, 469KB)Required if a homeowner is doing the work
- OptionalOwner Authorization Form (PDF, 374KB)Required for commercial mechanical permits
- OptionalResidential Mechanical Systems Design Submittal (PDF, 314KB)Manual J/D/S calcs, required for new mechanical systems submitted as part of additions/remodels/new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical (Fast-Track Building Permit Fee) | $65.00 per heating appliance | City of Fort Collins Building Permits page — Fast-Track Permits, Mechanical |
| Water Heater (Fast-Track Building Permit Fee) | $65.00 per water heater | City of Fort Collins Building Permits page — Fast-Track Permits, Water Heater |
| Fireplace, Wood Stove or Fire Pit (Fast-Track Building Permit Fee) | $65.00 | City of Fort Collins Building Permits page — Fast-Track Permits, Fireplace/Wood Stove/Fire Pit |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page |
Roofing Permit (Reroof)
VerifiedRequired for roof replacement/repair beyond a minor threshold on residential and commercial buildings in Fort Collins. Flat-fee Fast-Track permit; residential and commercial rates differ. Fort Collins requires Class 4 impact-resistant asphalt shingles when replacing 50% or more of a roof and mandates ice barrier at all eaves.
Verified 2026-07-01 · Source
Requirements
- Roofing repairs up to 100 sq ft (one roofing square) per building are permit-exempt; larger repairs and full reroofs require a permit
- Historic-designated buildings must be checked before submitting
- If an existing solar PV system must be removed and reinstalled for the reroof, submit a separate Solar PV Reinstallation permit
- Class 4 impact-resistant asphalt shingles required when replacing 50% or more of a roof (on the portion being replaced)
- Roof overlays allowed only as a second layer (max), weighing under 3 lb/sq ft (else a structural evaluation is required), manufacturer-permitted, and installed for high-wind per manufacturer instructions/code
- Ice barrier required at all roof eaves — minimum 24 in. upslope from the low eave edge (36 in. for slopes 8:12 or steeper)
- Drip edge required at eaves and gables of asphalt shingle roofs; continuous or step flashing at vertical sidewalls (except masonry/stucco)
Required documents
- RequiredRoofing Permit Application (PDF, 2MB)Application for reroof/roof repair work
- OptionalHomeowner Affidavit (PDF, 469KB)Required if a homeowner is doing the work
- OptionalOwner Authorization Form (PDF, 374KB)Required for commercial/multifamily roofing permits
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Roofing — Residential (flat Building Permit Fee) | $85.00 | City of Fort Collins Building Permits page, "Apply for a Building Permit" section (#section-3) — Roofing accordion, "Fees and Taxes": "Building Permit Fee: $85 residential; $210 commercial." (verified 2026-07-01 by expanding the Roofing accordion; this content is client-side rendered and not visible to plain HTTP fetch/curl) |
| Roofing — Commercial (flat Building Permit Fee) | $210.00 | City of Fort Collins Building Permits page, "Apply for a Building Permit" section (#section-3) — Roofing accordion, "Fees and Taxes": "Building Permit Fee: $85 residential; $210 commercial." (verified 2026-07-01 by expanding the Roofing accordion; this content is client-side rendered and not visible to plain HTTP fetch/curl) |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page |
Solar PV Permit
VerifiedRequired for rooftop or ground-mounted solar PV installation, reinstallation, and energy storage systems (ESS) in Fort Collins. Because Fort Collins Utilities is the city's own municipal electric utility, solar/battery projects require a SEPARATE Utilities Interconnect and Rebate Application in addition to the Building Services permit. A separate Poudre Fire Authority permit is also required for new installations and larger ESS.
Verified 2026-06-30 · Source
Requirements
- New installation: site plan, roof plan (if roof-mounted), panel layout, structural engineering for wind/snow loads and attachment (stamped by Colorado-licensed engineer), engineered electrical one-line diagram (stamped)
- A separate permit from Poudre Fire Authority is required for new solar PV installations, including fire access/clearances per the International Fire Code
- Reinstallation (same location/identical panels, no system changes): before-photo of existing system required; roof plan with panel layout only if the system changes
- Energy Storage System (ESS): location/spacing must comply with 2021 IRC R328 and the city's interpretation; requires a Master Electrician or Homeowner Affidavit; separate PFA permit required above 20 kWh (individual units), 40 kWh aggregate (utility closets/basements/storage), or 80 kWh aggregate (garages/exterior/outdoor)
- Utilities Interconnect and Rebate Application (separate from the building permit) must be submitted to Fort Collins Utilities — see Residential Solar and Battery Storage program
Required documents
- RequiredSolar PV Permit Application (PDF, 401KB)Application for new solar PV installation or ESS
- OptionalResidential Solar PV Guide (PDF, 546KB)City guidance on submittal requirements for residential solar PV
- OptionalHomeowner Affidavit (PDF, 469KB)Required if homeowner is doing the work, including for ESS installs without a Master Electrician
- OptionalOwner Authorization Form (PDF, 374KB)Required for commercial/multifamily solar permits
- RequiredUtilities Interconnect and Rebate ApplicationSeparate submittal to Fort Collins Utilities (Solar-Rebates@fortcollins.gov), required in addition to the Building Services permit for interconnection and any applicable rebate
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar PV New Installation — Residential | $85.00 total application fee ($29.75 Plan Check due at application + $55.25 Building Permit Fee due at issuance) | City of Fort Collins Building Permits page — Solar PV (New Installation), Residential |
| Solar PV New Installation — Commercial | $155.00 total application fee ($54.25 Plan Check due at application + $100.75 Building Permit Fee due at issuance) | City of Fort Collins Building Permits page — Solar PV (New Installation), Commercial |
| Solar PV Reinstallation (flat fee) | $65.00 | City of Fort Collins Building Permits page — Solar PV Reinstallation |
| Solar PV — Energy Storage System (ESS) (flat fee) | $65.00 | City of Fort Collins Building Permits page — Solar PV, Energy Storage System |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page |
Accessory Dwelling Unit (ADU) Permit
VerifiedRequired for construction of a new attached or detached ADU in Fort Collins. Since February 2025, Colorado state law HB 24-1152 allows ADUs in all Fort Collins zone districts (previously limited to Old Town and select neighborhoods), and prohibits owner-occupancy requirements — ADUs may be rented out separately from the primary home. Fort Collins is home to Colorado State University, making ADUs relevant for rental/student housing demand. All ADUs require a mandatory Basic Development Review before a building permit.
Verified 2026-06-30 · Source
Requirements
- No new units allowed in the Poudre River 100-year floodplain
- Property must have (or be allowed to build) a house, duplex, or triplex on the lot
- Most properties may add one ADU only; some zones (RUL, RF, CC, CCN, CCR, CG, CS, CL, LMN, MMN, HMN, NC, D, HC, E, I, RC) may allow a second detached house
- Detached ADU size: up to 750 sq ft if main home is under 1,667 sq ft; up to 1,000 sq ft or 45% of main home (whichever is less) if larger; existing accessory buildings may convert up to 800 sq ft
- Attached ADU size: above-grade up to 750 sq ft or 45% of main home; basement ADU up to 750 sq ft or 100% of that floor
- Detached ADU height may not exceed the main building or the zone's max height; must sit behind the front wall of the home, at least 5 ft from other buildings, and follow zone setbacks
- A walkway must connect the ADU's main door to the street, and the ADU's address must be visible from the street
- ADU needs its own electric meter (Fort Collins Utilities); may require nearby transformer upgrade or trenching payment
- Utility separations: 10 ft between water/sewer lines, 10 ft between storm drains and other utilities, 6 ft trees to water/sewer, 4 ft shrubs to water/sewer
- Stormwater quality treatment (rain gardens, permeable pavers) required if the project creates more than 1,000 sq ft of new impervious surface
- Mandatory Basic Development Review (flat $6,925 fee) precedes the building permit — decision made administratively by Planning Manager or Community Development Director per HB 24-1152 (no public hearing/subjective design review)
- Building Code requirements: fire-rated separation between units (attached ADUs), separate heating systems (attached ADUs), minimum kitchen/bathroom standards, separate exit doors
- Short-term rental of ADUs is prohibited, except in Planned Unit Developments (PUDs) where STRs were previously allowed
Required documents
- RequiredBasic Development Review ApplicationMandatory pre-building-permit zoning/development review covering Planning, Utilities, Fire, and Stormwater departments
- RequiredResidential Building Permit Application (PDF, 558KB)Building permit application, submitted after Development Review approval
- RequiredResidential Mechanical Systems Design SubmittalManual J/D/S load calcs for the ADU's mechanical system
- RequiredResidential Energy Code Compliance FormDemonstrates 2024 IECC/Fort Collins amendments compliance
- OptionalResidential Demolition Permit (PDF, 441KB)Required if demolishing an existing structure to build the ADU
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Basic Development Review (BDR) | $6,925 (flat fee, mandatory for ADU projects) | City of Fort Collins ADU page — Step 4: Budget for Fees; also listed on Fee Schedules — Development Review Fees, Planning Services table |
| Building Permit Fee | Based on project value/occupancy — see Residential Building Permit fee entry (R-3 occupancy-based rate) | City of Fort Collins ADU page and Fee Schedules page |
| Utility fees (water, sewer, electric capacity charges) | Varies by project — not itemized as a single figure on the ADU page | City of Fort Collins ADU page — Step 4: Budget for Fees |
| Transportation fees (Larimer County road impact + City capital expansion) | Varies by project | City of Fort Collins ADU page — Step 4: Budget for Fees |
| Total estimated ADU development fees (all-in) | Approximately $20,000–$25,000 | City of Fort Collins ADU page — Step 4: Budget for Fees; city's own stated estimate range combining BDR, utility, transportation, and building permit fees |
Demolition Permit
VerifiedRequired for demolishing an existing structure in Fort Collins, whether interior/non-structural, interior structural, partial building, or complete building demolition. Requirements scale with demolition scope (asbestos disclosure/assessment, state approval notice, construction waste management).
Verified 2026-06-30 · Source
Requirements
- Interior, Non-Structural Demolition: Demolition Permit Application, Construction Waste Management Plan, Asbestos Awareness Disclosure
- Interior Structural Demolition: same as above plus applicable structural documentation
- Partial Building Demolition: Demolition Permit Application, Construction Waste Management Plan, asbestos assessment showing clear of asbestos by certified contractor
- Complete Building Demolition: Demolition Permit Application, Construction Waste Management Plan, State Demolition Approval Notice
- Homeowner Affidavit required if a homeowner is doing the work
Required documents
- RequiredDemolition Permit Application (PDF, 387KB)Primary demolition application form
- RequiredAsbestos Awareness Disclosure (PDF, 161KB)Required for interior demolition scopes
- RequiredConstruction Waste and Recycling Management Declaration of Responsibility (PDF, 467KB) + Construction Waste Management ReportRequired for all demolition scopes
- OptionalState Demolition Approval NoticeRequired for complete building demolition, per Colorado state requirements
- OptionalResidential Demolition Submittal Guide / Commercial Demolition Submittal Guide (PDF, 441KB each)City guidance documents for the applicable demolition scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition (Application/Building Permit Fee) | $65.00 | City of Fort Collins Building Permits page — Demolition section: 'Application Fee: $65 (Building Permit Fee)' |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page |
Commercial Tenant Improvement / Remodel Permit
VerifiedRequired for commercial alterations, change of function/use/occupancy, tenant finish, and vanilla shell/white box/landlord work in Fort Collins. Uses the same tiered valuation-based fee table as residential remodels.
Verified 2026-06-30 · Source
Requirements
- Covers alterations, change of function/use/occupancy, tenant finish, and vanilla shell/white box/landlord work
- Change of Occupancy Permit Requirements apply if the use/occupancy classification changes
- Accessibility upgrades may be required (per Accessibility Upgrades Information guidance) depending on scope
- Construction Waste and Recycling Declaration of Responsibility + Report required
- Owner Authorization Form required for commercial/multifamily projects
- Submit one permit per commercial tenant space or unit
Required documents
- RequiredCommercial Remodel Permit Application (PDF, 530KB)Primary application for commercial remodels/tenant improvements
- OptionalCommercial Remodel Submittal Guide (PDF, 919KB)City guidance for commercial remodel/tenant-finish submittals
- OptionalChange of Occupancy Permit Requirements (PDF, 512KB)Required documentation set if the project changes occupancy classification
- RequiredOwner Authorization Form (PDF, 374KB)Required for commercial/multifamily projects
- RequiredConstruction Waste and Recycling Declaration of Responsibility + ReportRequired waste diversion documentation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial Remodel — valuation-based | Up to $2,000: flat $105.00. $2,000–$25,000: $105 + $15.50 per additional $1,000. $25,000–$50,000: $461.50 + $10.50/$1,000. $50,000–$100,000: $724.00 + $6.50/$1,000. $100,000–$500,000: $1,049.00 + $6/$1,000 (via $60 per $10,000). Above $500,000: $3,449.00 + $5.50/$1,000 (via $55 per $10,000). | City of Fort Collins Building Permits page — Remodel and Alteration Permits, Commercial Remodels fee table |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page |
Deck / Covered Patio Permit
VerifiedRequired for decks, stairs, ramps, landings, and patio/porch covers in Fort Collins (except small decks under 200 sq ft / 30 in. high, which are permit-exempt). Flat-fee Fast-Track/Exterior permit; pre-built structures and commercial projects require a Colorado-licensed structural engineer's stamp.
Verified 2026-07-01 · Source
Requirements
- Deck/Stairs/Ramp/Landing: site plan, deck plans; commercial structural work must be stamped by a Colorado-registered structural engineer; City-approved specialty products (diamond piers, PWT engineered deck products) usable without a full engineered design if complete product specs are submitted
- Patio/Porch Cover: commercial projects and pre-built structures must be designed and stamped by a Colorado-licensed structural engineer
- Small decks are permit-EXEMPT if: area ≤200 sq ft, height ≤30 in. above grade, not attached to the dwelling, and not serving a required exit door
- Construction Waste and Recycling Management Declaration of Responsibility + Report required for decks
- Homeowner Affidavit required if homeowner is doing the work
Required documents
- RequiredBuilding Permit Application (PDF, 619KB)Standard application used for deck and patio cover permits
- RequiredResidential Deck Guide (PDF, 1MB)City guidance to fill out and include with deck plans
- OptionalResidential Patio Cover Guide (PDF, 1MB)City guidance for patio/porch cover submittals
- OptionalHomeowner Affidavit (PDF, 469KB)Required if homeowner is doing the work
- OptionalOwner Authorization Form (PDF, 374KB)Required for commercial/multifamily projects
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Deck / Stairs / Ramp / Landing (flat total) | $110.00 total ($38.50 Plan Check due at application + $71.50 Building Permit Fee due at issuance) | City of Fort Collins Building Permits page, "Apply for a Building Permit" section (#section-3) — Deck / Stairs / Ramp / Landing accordion, "Fees and Taxes": "Application Fee: $110 total; Plan Check Fee: $38.50 (due when you apply); Building Permit Fee: $71.50 (due when your permit is issued)" (verified 2026-07-01 by expanding the accordion; this content is client-side rendered and not visible to plain HTTP fetch/curl) |
| Patio / Porch Cover (flat total) | $110.00 total ($38.50 Plan Check due at application + $71.50 Building Permit Fee due at issuance) | City of Fort Collins Building Permits page, "Apply for a Building Permit" section (#section-3) — Patio / Porch Cover accordion, "Fees and Taxes": "Application Fee: $110 total; Plan Check Fee: $38.50 (due when you apply); Building Permit Fee: $71.50 (due when your permit is issued)" (verified 2026-07-01 by expanding the accordion; this content is client-side rendered and not visible to plain HTTP fetch/curl) |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page |
EV Charger / Electric Vehicle Charging Station Permit
VerifiedRequired for installation of a residential or commercial EV charger in Fort Collins. Residential EV chargers for single-family detached/duplex/townhomes are Fast-Track eligible under the standard Electric permit; commercial and multifamily EV chargers use the valuation-based Remodel/Alteration permit fee table with a dedicated 'EV Charger (Commercial and Multifamily)' line item — both documented directly on the City's Building Permits page (Fast-Track Permits and Remodel and Alteration Permits sections).
Verified 2026-07-20 · Source
Requirements
- Residential EV chargers for single-family detached, duplex, or townhome properties are eligible for the Fast-Track Electric permit process (same as outlets, panels, wiring, repairs, and lighting)
- Commercial and multifamily EV charging stations require a Remodel/Alteration permit instead of the Fast-Track Electric permit, and require accessible parking/EV charging compliance documentation
- Governed by the 2023 NEC (effective Aug. 1, 2023), including Article 625 (Electric Vehicle Power Transfer System), matching the state-adopted electrical code
- Master Electricians must be licensed by the State of Colorado (Supervisor relationship) AND separately register with the City of Fort Collins Contractor Licensing office
- 'Energize Electric' inspection step applies for chargers requiring new/upgraded service, tied to Fort Collins Utilities (the City's own municipal electric utility) setting the permanent meter
Required documents
- RequiredElectric Permit Application (PDF, 432KB)Fast-Track application for residential EV charger installation (single-family detached/duplex/townhomes)
- OptionalOwner Authorization Form (PDF, 374KB)Required for commercial/multifamily EV charger permits
- OptionalHomeowner Affidavit (PDF, 469KB)Required if a homeowner is doing the EV charger installation themselves
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| EV Charger — Residential (single-family detached/duplex/townhome), Fast-Track Building Permit Fee | $65.00 | City of Fort Collins Building Permits page — Fast-Track Permits, Electric (residential EV chargers are explicitly listed as Fast-Track eligible under the standard Electric permit line item) |
| EV Charger (Commercial and Multifamily) — valuation-based | Up to $2,000: flat $105.00. $2,000-$25,000: $105 + $15.50 per additional $1,000. $25,000-$50,000: $461.50 + $10.50/$1,000. $50,000-$100,000: $724.00 + $6.50/$1,000. $100,000-$500,000: $1,049.00 + $6/$1,000. Above $500,000: $3,449.00 + $5.50/$1,000. | City of Fort Collins Building Permits page — Remodel and Alteration Permits, EV Charger (Commercial and Multifamily) — a dedicated named line item distinct from the general electrical remodel table |
| Sales Tax | Calculated based on total project valuation (materials and labor) | City of Fort Collins Sales Tax page |
Sign Permit
VerifiedRequired to install, alter, or replace most permanent signs (wall, ground/monument, awning, projecting/fin, canopy, secondary roof) in Fort Collins, under Land Use Code Section 5.16 (Signs). Administered by the Zoning division of Community Development & Neighborhood Services — a distinct process from Building Services' Fast-Track/Remodel permits, with its own City-issued Sign Contractor license class. Temporary signs (banners, feather flags) use a separate Temporary Sign Permit Application under LUC Section 5.16.3. Despite a direct chase across the City's Fee Schedules page, the Zoning Permits webpage, and both Sign Permit Application PDFs, no published dollar fee figure for the sign permit itself could be located — flagged honestly below rather than estimated.
Verified 2026-08-13 · Source
Requirements
- Required to install, alter, or replace most permanent signs (wall, ground/monument, awning, projecting/fin, canopy, secondary roof) per Land Use Code Section 5.16; administered by Zoning, not Building Services
- Temporary signs (banners, feather flags) are governed separately under LUC Section 5.16.3, using a distinct Temporary Sign Permit Application
- Sign Permit Application (permanent) requires a stated materials-and-labor Valuation figure and detailed drawings showing site location and dimensions; submitted electronically as one collated PDF to zoning@fortcollins.gov
- Permanent sign installation may only be performed/permitted by a City of Fort Collins-licensed Sign Contractor (contractor license number prefixed "SG-"), the property/business owner, or an applicant with the owner's written consent; permits cannot be issued if the contractor's license is out of date (contractor_licensing@fortcollins.gov)
- Wall sign raceways may not exceed 50% of the average height of the attached letters and/or shapes
- Ground sign (monument, pole, drive-thru lane) applications must include a site plan showing distance to the property line; overall height is measured from the flowline of the adjacent street
- Temporary banners: capped at 40 sq ft, limited to 40 days per calendar year per business; feather flags limited to 20 days per calendar year; banners and feather flags cannot be displayed concurrently
- Detached banners limited to 1 per 100 linear feet of property frontage; attached banner standards and maximum sign height vary by the property's applicable sign district (LUC 5.16.3)
- All temporary signs must sit on the business's own private property, no closer than 2 feet to a public sidewalk
- The permanent Sign Permit Application also asks applicants to list any signs being removed, to help the City keep its sign survey current
Required documents
- RequiredSign Permit Application (permanent signs)Emailed as one collated PDF (application + drawings) to zoning@fortcollins.gov; current form revised 2/18/2025
- OptionalTemporary Sign Permit ApplicationSeparate form for banners and feather flags, citing Land Use Code Section 5.16.3
- RequiredDetailed Sign and Site DrawingsDimensions (H x W x D), sign area, direction, illumination status for each sign; ground signs additionally require a site plan showing distance to the property line
- OptionalCity of Fort Collins Sign Contractor License (SG- license number)Required for the installing contractor on permanent signs unless the property/business owner is self-installing with appropriate consent; verified current at contractor_licensing@fortcollins.gov before permit issuance
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit Fee (permanent signs) | Not published as a flat or itemized dollar figure anywhere in the City's public materials | Checked directly this session: the Fee Schedules page's Development Review Fees > Zoning Services table has no sign-permit line item, the Zoning Permits webpage states no fee, and the Sign Permit Application PDF itself only asks the applicant to state a materials-and-labor 'Valuation' figure without listing a rate or formula. Confirm current cost directly with Zoning (970-416-2745 / zoning@fortcollins.gov) before applying. |
| Zoning Verification Letter (optional pre-application check) | $100.00 | City of Fort Collins Fee Schedules page — Development Review Fees, Zoning Services table; useful for confirming a property's sign district/standards before a formal sign permit submittal, though not itself the sign permit fee |
Fire Sprinkler and Fire Alarm System Permit
VerifiedIssued entirely by Poudre Fire Authority (PFA) — a joint city-district fire authority genuinely separate from Fort Collins Building Services — through its Fire Prevention and Community Risk Reduction (FPCRR) Division. Required for new or altered fire sprinkler systems (NFPA 13/13R commercial and multi-family, NFPA 13D one- and two-family dwellings), fire alarm systems, and related life-safety systems, governed by the City of Fort Collins' adopted 2024 International Fire Code (confirmed directly via PFA's own Fire Code Amendments page this session). Fees are calculated from system valuation via PFA's own online System Plan Review Fee Calculator, confirmed directly this session by testing several valuations, plus City sales tax (1.925%) and Larimer County tax (0.4%). This PFA permit is required IN ADDITION TO any City of Fort Collins Building Services permit for the same project.
Verified 2026-08-13 · Source
Requirements
- A PFA construction permit is required for new or altered fire sprinkler systems (NFPA 13/13R commercial and multi-family, NFPA 13D one- and two-family dwellings), fire alarm systems, alternative extinguishing/suppression systems (kitchen hoods, spray booths, clean-agent), fuel storage/tanks, gas detection systems, CO2 beverage dispensing systems, smoke control systems, and Emergency Responder Communication Enhancement Systems (ERCES) — confirmed directly from PFA's own Construction Permits list
- Reviewed and issued entirely by PFA's Fire Prevention and Community Risk Reduction (FPCRR) Division — not Fort Collins Building Services — governed by the City of Fort Collins' currently adopted 2024 International Fire Code (IFC), confirmed via PFA's own Fire Code Amendments page
- Separate Submittal Checklists apply for Type 13/13R Sprinkler Systems, Type 13D Sprinkler Systems, and Fire Alarm Systems; a faster "Limited Scope Permit" path exists for both smaller-scope sprinkler and fire alarm work
- All contractors installing or repairing fire suppression systems anywhere in Colorado, including within PFA's jurisdiction, must hold a Fire Suppression System Contractor registration issued by the Colorado Division of Fire Prevention and Control (DFPC) under 8 CCR 1507-11-3 — a statewide requirement independent of any City of Fort Collins contractor license
- PFA reviews development documents and building-permit submittals for four jurisdictions sharing its 230-square-mile service area: the City of Fort Collins, Town of Timnath, Poudre Valley Fire Protection District, and unincorporated portions of Larimer and Weld Counties
- Fees are calculated via PFA's own online System Plan Review Fee Calculator based on the contractor-reported system valuation, and are paid separately from any City of Fort Collins Building Services permit fee for the same project
- This PFA permit is required in addition to, not instead of, the applicable City of Fort Collins Building Services permit (e.g., new construction or Commercial Remodels, both documented elsewhere in this file) for the same project
Required documents
- RequiredPFA Construction Permit ApplicationSubmitted through PFA's own online system, separate from the City of Fort Collins' Accela-based building-permit portal
- RequiredType 13/13R or Type 13D Sprinkler Submittal Checklist, or Fire Alarm Submittal Checklist (as applicable)PFA-published checklist matching the specific system type being installed
- RequiredColorado DFPC Fire Suppression System Contractor RegistrationRequired of the installing/repairing contractor under 8 CCR 1507-11-3
- OptionalERCES Submittal ChecklistRequired only if the project includes an Emergency Responder Communication Enhancement System
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| System Plan Review Fee — example at $1,000 system valuation | Plan Check Fee $25.19 + Permit Fee $38.75 + City Tax $19.25 + County Tax $4.00 = $87.19 total | Computed directly via PFA's own online System Plan Review Fee Calculator (City of Fort Collins tax jurisdiction), tested 2026-08-13 |
| System Plan Review Fee — example at $10,000 system valuation | Plan Check Fee $117.81 + Permit Fee $181.25 + City Tax $192.50 + County Tax $40.00 = $531.56 total | Computed directly via PFA's own online System Plan Review Fee Calculator, tested 2026-08-13 |
| System Plan Review Fee — example at $25,000 system valuation | Plan Check Fee $254.31 + Permit Fee $391.25 + City Tax $481.25 + County Tax $100.00 = $1,226.81 total | Computed directly via PFA's own online System Plan Review Fee Calculator, tested 2026-08-13 |
| System Plan Review Fee — example at $50,000 system valuation | Plan Check Fee $418.76 + Permit Fee $644.25 + City Tax $962.50 + County Tax $200.00 = $2,225.51 total | Computed directly via PFA's own online System Plan Review Fee Calculator, tested 2026-08-13 |
| System Plan Review Fee — example at $100,000 system valuation | Plan Check Fee $645.94 + Permit Fee $993.75 + City Tax $1,925.00 + County Tax $400.00 = $3,964.69 total | Computed directly via PFA's own online System Plan Review Fee Calculator, tested 2026-08-13 |
| City Tax and County Tax rates (observed) | City of Fort Collins Tax: 1.925% of system valuation; Larimer County Tax: 0.4% of system valuation | Held constant across every valuation tested via PFA's calculator this session; excludes tax-exempt projects, which the calculator supports as a separate selection |
Change of Use / Change of Occupancy
VerifiedFort Collins has no standalone change-of-use or change-of-occupancy permit or fee line — confirmed directly this session by checking the Building Permits page's full list of permit-type accordions (52 entries, none named Change of Use or Change of Occupancy) and the Fee Schedules page's Zoning Services table (no such line item). A change of use/occupancy instead runs on two parallel tracks already partly documented elsewhere in this file: the zoning side, verifying the new use is allowed under the Table of Primary Uses in Article 4 of the Land Use Code for the property's zone district (optionally confirmed via a $100 Zoning Verification Letter); and the building-code side, where the existing Commercial Remodels permit type explicitly lists 'change of function, use, or occupancy' as an example project and requires the City's dedicated 'Change of Occupancy Permit Requirements' submittal packet, reviewed under the City's adopted 2024 International Existing Building Code (IEBC).
Verified 2026-08-13 · Source
Requirements
- No standalone change-of-use or change-of-occupancy permit, application, or fee exists — confirmed absent from the Building Permits page's full set of permit-type accordions and from the Fee Schedules page's Zoning Services table, both checked directly this session
- Zoning-side check: the proposed new use must be allowed under the Table of Primary Uses in Article 4 of the Fort Collins Land Use Code for the property's zone district; a $100 Zoning Verification Letter (Development Review Fees, Zoning Services table) can be requested to confirm this before applying for a building permit
- If the new use is not a permitted or limited-permitted use in the applicable zone district, an Addition of Permitted Use process (a Development Review application, not itself a permit type documented in this file) may be required before a building permit can be issued
- Building-code side: a change of function, use, or occupancy is processed under the Commercial Remodels permit type (documented elsewhere in this file), using the same tiered valuation-based fee table, and additionally requires the City's 'Change of Occupancy Permit Requirements' submittal packet
- Reviewed against the City's adopted 2024 International Existing Building Code (IEBC) with Fort Collins Amendments (already listed in this file's codesAdopted), which governs the life-safety and accessibility compliance triggered by a change in occupancy classification
- Accessibility upgrades may be required depending on the specific occupancy change, per the City's Accessibility Upgrades Information guidance (already referenced under the Commercial Remodels entry)
- Construction Waste and Recycling Declaration of Responsibility + Report and an Owner Authorization Form (commercial/multifamily) are required as part of the underlying Commercial Remodel submittal
- Contact Building Services (buildingservices@fortcollins.gov, 970-416-2740) or Zoning (zoning@fortcollins.gov, 970-416-2745) directly to confirm which track(s) apply to a specific proposed use change, since no single consolidated City page walks through this exact scenario end-to-end
Required documents
- OptionalZoning Verification Letter ApplicationOptional pre-application check confirming the proposed use is allowed in the property's zone district under Article 4's Table of Primary Uses
- RequiredCommercial Remodel Permit Application (PDF, 530KB)Same application form used for the underlying Commercial Remodels permit type, filed for the physical work accompanying the use change
- RequiredChange of Occupancy Permit Requirements (PDF, 512KB)City-published submittal packet specific to occupancy-classification changes, applied under the 2024 IEBC
- OptionalAccessibility Upgrades Information (PDF, 499KB)Guidance on accessibility-upgrade requirements that may be triggered by the specific occupancy change
- RequiredOwner Authorization Form (PDF, 374KB)Required for commercial/multifamily projects
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Zoning Verification Letter (optional pre-check) | $100.00 | City of Fort Collins Fee Schedules page — Development Review Fees, Zoning Services table, confirmed directly this session |
| Commercial Remodel — valuation-based (the underlying building permit for the physical change-of-use/occupancy work) | Up to $2,000: flat $105.00. $2,000-$25,000: $105 + $15.50 per additional $1,000. $25,000-$50,000: $461.50 + $10.50/$1,000. $50,000-$100,000: $724.00 + $6.50/$1,000. $100,000-$500,000: $1,049.00 + $6/$1,000 (via $60 per $10,000). Above $500,000: $3,449.00 + $5.50/$1,000 (via $55 per $10,000). | Same fee table as this file's Commercial Remodels/Tenant Improvement permit type — Fort Collins does not charge a separately itemized change-of-use or change-of-occupancy fee |
| Addition of Permitted Use (only if the new use is not already a permitted/limited use in the applicable zone district) | Not itemized as its own line on the general Fee Schedules page; processed as a Development Review application, with fees depending on the specific review category required (e.g., Minor Amendment $1,500) | City of Fort Collins Fee Schedules page, Development Review Fees > Planning Services table; confirm the applicable category with Development Review (970-221-6689) before applying |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fort Collins building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.