This is PermitBase’s published record for Timnath as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Timnath building permits
VerifiedTimnath, Colorado — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family and two-family residential construction in Timnath. Plan review is performed by SAFEbuilt Colorado under contract to the Town; the Town of Timnath is the permit-issuing authority. Applications route through the CommunityCore portal for contractors, or by email submittal for homeowners.
Verified 2026-07-06 · Source
Requirements
- Submit a complete set of construction drawings including engineered, stamped foundation plans, a copy of Energy Code compliance information (ResCheck or equivalent, per the 2018 IECC as locally amended), and a plot plan
- 1 set of Manual J, D (and S, per the Master Plan process) compliance calculations
- Site Grading Certification required prior to Certificate of Occupancy for all new Single Family, Two-Family, or Multi-Family Residences
- Contractors submit via CommunityCore; homeowners without CommunityCore access may email documents to buildings@timnathgov.com
- General contractor must hold a current Town of Timnath Contractor License; electrical and plumbing trades must hold current Colorado state licensure (subject to contemporaneous license review during inspections per HB19-1086/SB19-156)
- Use tax deposit (Larimer County, 0.8% of 50% of assumed material valuation) due at permit issuance; Project Cost Report reconciliation due within 60 days of Certificate of Occupancy
Required documents
- RequiredBuilding Permit ApplicationTown of Timnath application form listing applicant, owner, and all trade contractors, job site address, setbacks, square footage breakdown, and estimated valuation
- RequiredConstruction Drawings (Architectural/Floor Plans, Engineered Foundation Plans)Complete set, including foundation plans stamped by a Colorado-licensed engineer
- RequiredPlot PlanSite plan showing lot dimensions, setbacks to property lines, existing/proposed structures, and utilities
- RequiredEnergy Code Compliance DocumentationResCheck or equivalent showing 2018 IECC compliance (as locally amended), or prescriptive-method documentation on the drawings
- RequiredManual J / Manual D CalculationsHVAC load and duct design calculations
- RequiredSite Grading CertificationRequired prior to Certificate of Occupancy for new single-family, two-family, or multi-family residences
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Building Permit Fee | Not published online | Codified as Appendix 4-A to Chapter 4 of the Timnath Municipal Code, explicitly stated to be 'available from the Town Office' rather than posted publicly. Contact buildings@timnathgov.com or 970-224-3211 for current figures. Valuation for fee purposes is calculated via the Town's Valuation Calculator (2022 ICC Building Valuation Data basis, updated 1-Feb-2024): Main Floor $150.87/SF, Basement-Finished $37.51/SF, Basement-Unfinished $23.20/SF, Garage $39.28/SF. |
| Police Impact Fee | $659.00 per residential dwelling unit | Ordinance No. 5, Series 2024, Sec. 4-6-50(a); collected at building permit issuance |
| Parks, Open Space and Trails Impact Fee | $3,669.00 per residential dwelling unit | Ordinance No. 5, Series 2024, Sec. 4-6-50(b) |
| Public Buildings Impact Fee | $800.00 per residential dwelling unit | Ordinance No. 5, Series 2024, Sec. 4-6-50(c) |
| Stormwater Impact Fee | $560.00 per residential dwelling unit | Ordinance No. 5, Series 2024, Sec. 4-6-50(d) |
| Transportation Impact Fee | $2,003.00 per residential dwelling unit | Ordinance No. 5, Series 2024, Sec. 4-6-50(e) |
| Larimer County Use Tax Deposit | 0.8% of 50% assumed material valuation | Deposit reconciled via Project Cost Report within 60 days of CO/finalization |
Residential Addition / Remodel Permit
VerifiedCovers home additions, basement finishes, decks, covered patios/porches, pole barns/accessory structures, and similar remodel work in Timnath. Governed by 2018 IRC design guides published by SAFEbuilt/the Town for each project type.
Verified 2026-07-06 · Source
Requirements
- Home Additions: complete set of construction drawings including engineered foundation plans, site plan, floor plan, permit application
- Basement Finish: submittal requirements per the Town's dedicated Basement Finish Submittal Requirements document and 2024 Basement Finish guide
- Decks/Uncovered Porches: site plan, house attachment details, guardrail details, footing details, cross-section deck plan, permit application
- Accessory Structures (sheds, detached garages, pole barns): site plan, construction details, floor plan, permit application; check with Building Department for size thresholds exempt from permits
- A foundation designed by a licensed Engineer or Architect may be required depending on project specifics
- General contractor must hold a current Town of Timnath Contractor License and be listed on the permit
Required documents
- RequiredBuilding Permit ApplicationTown of Timnath application listing project scope, square footage, and valuation
- RequiredSite Plan / Plot PlanShowing lot dimensions, setbacks, and location of the addition/structure relative to property lines and existing structures
- RequiredConstruction Details / Cross-Section PlanFraming, footing, and (for decks) house-attachment and guardrail details
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Building Permit Fee | Not published online | Appendix 4-A to Chapter 4 of the Municipal Code; contact buildings@timnathgov.com or 970-224-3211. Valuation for additions/decks calculated via the Town's Valuation Calculator: Additional Floors $150.87/SF, Covered Porch $22.86/SF, Deck $22.86/SF, Covered Deck $45.72/SF, Garage $39.28/SF |
Electrical Permit
VerifiedRequired for electrical work in Timnath. Electricians are licensed at the Colorado state level (C.R.S. Title 12, Article 23); Timnath does not appear to require a separate town-issued electrical trade license beyond the general contractor license framework, per the contemporaneous-license-review guidance the Town distributes.
Verified 2026-07-06 · Source
Requirements
- Permit application must list the performing electrical contractor with license information
- Electricians must hold current Colorado state electrical licensure; inspectors may conduct contemporaneous license reviews on-site per SB19-156, with a focus on large commercial/multi-family projects
- 2023 National Electrical Code (NEC) applies, adopted at the State of Colorado level and enforced by the Town
- PV system electrical work follows the Town's dedicated Photovoltaic System Submittal Requirements (see solar-pv-permit)
Required documents
- RequiredBuilding/Electrical Permit ApplicationLists the electrical contractor, address, phone, and email; submitted via CommunityCore (contractors) or by email (homeowners)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Electrical Permit Fee | Not published online | Part of Appendix 4-A to Chapter 4 of the Municipal Code, available from the Town Office; contact buildings@timnathgov.com or 970-224-3211 |
Plumbing Permit
VerifiedRequired for plumbing work in Timnath, governed by the 2021 IPC as locally adopted and amended. Plumbers are licensed at the Colorado state level (C.R.S. Title 12, Article 58).
Verified 2026-07-06 · Source
Requirements
- Permit application must list the performing plumbing contractor
- Plumbers must hold current Colorado state plumbing licensure; subject to contemporaneous license review per HB19-1086
- 2021 IPC applies as locally adopted, per the Town's Design Criteria and Adopted Codes summary
- Tankless water heaters require a drawing at time of application showing piping material, size, run distance, bends, overall length, material type, regulators, appliance BTUs, and gas pressure (per the Same-As submittal process documentation)
Required documents
- RequiredBuilding/Plumbing Permit ApplicationLists the plumbing contractor and scope of work
- OptionalTankless Water Heater Piping DrawingRequired specifically for tankless water heater installations
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Plumbing Permit Fee | Not published online | Part of Appendix 4-A to Chapter 4 of the Municipal Code, available from the Town Office; contact buildings@timnathgov.com or 970-224-3211 |
Mechanical / HVAC Permit
VerifiedRequired for furnace, air conditioner, and similar mechanical equipment installation or replacement in Timnath, governed by the 2018 IMC and 2018 IFGC as locally adopted.
Verified 2026-07-06 · Source
Requirements
- Permit application must list the mechanical/HVAC contractor
- 2018 IMC and 2018 IFGC apply as locally adopted, per the Town's Design Criteria and Adopted Codes summary
- Furnace, Air Conditioner, and Water Heater are each listed as distinct residential permit categories on the Town's Homeowner Building and Construction Services page
Required documents
- RequiredBuilding/Mechanical Permit ApplicationLists the mechanical contractor and equipment being installed/replaced
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Mechanical Permit Fee | Not published online | Part of Appendix 4-A to Chapter 4 of the Municipal Code, available from the Town Office; contact buildings@timnathgov.com or 970-224-3211 |
Roofing Permit (Re-Roof)
VerifiedRequired for residential re-roofing in Timnath, governed by the Town's dedicated 2018 IRC Residential Re-roofing guide (SAFEbuilt, published 5/10/2019).
Verified 2026-07-06 · Source
Requirements
- Permit required to re-roof; homeowners may perform the re-roof themselves as an owner-builder
- No more than two (2) layers of roofing allowed upon completion
- Roof sheathing must provide a rigid surface; warped, cracked, or delaminated boards/sheathing must be repaired or replaced (for complete tear-offs)
- New minimum 15# asphalt-saturated felt underlayment required on a dry deck for complete tear-offs; underlayment lap requirements vary by roof slope (4:12 or greater vs. 2:12 to 4:12)
- Fasteners must penetrate the total roofing thickness plus a minimum of 3/4 inch into the decking material
- A Final Roof inspection is required; a mid-roof inspection may also be required — confirm with the Building Department when the permit is issued
- Existing roof jacks/vents in poor, rusted, or deteriorated condition must be replaced
Required documents
- RequiredBuilding Permit ApplicationStandard Town of Timnath permit application for the re-roof scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Roofing Permit Fee | Not published online | Part of Appendix 4-A to Chapter 4 of the Municipal Code, available from the Town Office; contact buildings@timnathgov.com or 970-224-3211 |
Solar PV Permit
VerifiedRequired for photovoltaic system installation or replacement in Timnath. Governed by a dedicated SAFEbuilt Colorado Photovoltaic System Submittal Requirements document (updated 11/13/2019), citing the 2017 NEC, 2018 IRC, and 2018 IBC.
Verified 2026-07-06 · Source
Requirements
- Permit application must be completely filled out with contact person, phone number, and total valuation of the PV system (materials, labor, and profit)
- Provide 2 sets of complete drawings; a plan review is required for each property/address
- Applicable design codes per the SAFEbuilt PV requirements document: 2017 NEC, 2018 IRC, and 2018 IBC
- Engineering design criteria: 90 MPH 3-second gust wind speed, exposure site-specific, roof snow load 30 lbs/SF, Seismic Design Category B
- Roof-mounted systems require structural engineering proving the roof system supports the new load (wind uplift, snow load, dead load)
- Ground-mounted systems require a plot/site plan showing the PV array location and distances to property lines and existing structures
- Electrical plans must include a four-line diagram (module count/wattage, conductor sizes, wire lengths, insulation types, conduit sizes, fuses, breaker ratings, inverter ratings, AC/DC disconnect ratings, grounding, ground fault protection), module nameplate short-circuit current/open-circuit voltage, wire-sizing calculations with NEC Table 690.31(C) temperature derating (56-60°C worst case for roof-mounted systems), inverter voltage calculations, grounding conductor sizing per NEC 690.43/690.45, and disconnect grouping per NEC 690.14(C)(5)
- Zoning requirements are set by the individual jurisdiction; applicant should contact the Town directly to verify zoning compliance
Required documents
- RequiredPV Permit ApplicationIncludes contact person, phone number, and total system valuation
- RequiredComplete Drawings (2 sets)Electrical four-line diagram and structural details per the SAFEbuilt PV requirements checklist
- OptionalPlot/Site PlanRequired for ground-mounted systems, showing array location and distances to property lines/structures
- RequiredManufacturer Cut Sheets and Listing InformationFor all PV equipment installed
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base PV/Building Permit Fee | Not published online | Part of Appendix 4-A to Chapter 4 of the Municipal Code, available from the Town Office; contact buildings@timnathgov.com or 970-224-3211 |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Timnath building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.