Skip to main content
PermitBase

Version history — Sterling, Colorado

This is PermitBase’s own verified record for Sterling, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Sterling’s actual law was at that time.

Permanent link to today’s record

/colorado/logan-county/sterling/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
    • Sterling, Colorado — Residential Building Permit (New Construction) fee record updated: May be required in some cases → $25.00 per hour
    • Sterling, Colorado — Commercial Building Permit (New Construction / Major Alteration) fee record added: Building Permit Fee (same valuation-based schedule as the Residential Building Permit entry in this record) ($23.50 minimum, scaling per the Resolution No. 11-1-24 valuation tiers up to $5,608.75 for the first $1,000,000 plus $3.65 per additional $1,000)
    • Sterling, Colorado — Commercial Building Permit (New Construction / Major Alteration) fee record removed: Building Permit Fee (same valuation-based schedule as the Residential Building Permit entry in this file)
  • 2026-08-14Superseded
  • 2026-08-02Superseded
    • Sterling, Colorado — Commercial Building Permit (New Construction / Major Alteration) record added
    • Sterling, Colorado — Tenant Improvement / Change-of-Use Permit (Existing Commercial Structures) record added
  • 2026-07-20Superseded
    • Sterling, Colorado — EV Charger / EVSE Permit record added
    • Sterling, Colorado — EV Charger / EVSE Permit fee record added: State of Colorado electrical permit fee (EV charger circuit — Table B, 'Commercial and other fees') ($90.00 base fee for job valuation ≤ $2,000, plus $8.00 per additional $1,000 of valuation (rounded up to the next $1,000))
    • Sterling, Colorado — EV Charger / EVSE Permit fee record removed: State of Colorado electrical permit fee (EV charger circuit)
    • Sterling, Colorado — Residential/Commercial Solar Photovoltaic (PV) Permit record added
  • 2026-07-07Superseded
  • 2026-07-06Initial record — coverage of Sterling began