Skip to main content
PermitBase

Sterling building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Sterling, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
421 N. 4th Street, P.O. Box 4000, Sterling, CO 80751
Phone
(970) 522-9700, ext. 1109 (Marianne, permits and licenses); main line (970) 522-9700; fax (970) 521-0632
Office hours
Not published on the Permits and Licenses page as of the last verification; inspection requests are scheduled by phone at (970) 522-9700, with a stated same-day/next-day cutoff (see reviewTimelineNote on inspections below).

Inspection guide

See how inspections work in Sterling — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC), with Appendices A, E, and I — City of Sterling Municipal Code § 5-31, adopted by Ord. No. 5-2023 (eff. 6/13/23); a copy is kept at the City Clerk's office for public inspection
  • 2018 International Residential Code (IRC), with Appendices F and H — Municipal Code § 5-56, adopted by Ord. No. 7-2023 (eff. 6/13/23); IRC Section R313 (Automatic Fire Sprinkler Systems) is expressly omitted in its entirety
  • 2018 International Mechanical Code (IMC) — Municipal Code § 5-43, adopted by Ord. No. 6-2023 (eff. 6/13/23)
  • 2018 International Energy Conservation Code (IECC) — Municipal Code § 5-106, adopted by Ord. No. 8-2023 (eff. 6/13/23)
  • 2018 International Fuel Gas Code (IFGC) — Municipal Code § 5-140, adopted by Ord. No. 9-2023 (eff. 6/13/23)
  • 2018 International Existing Building Code (IEBC), with Appendices B and C, adopted in its entirety without amendment per state law — Municipal Code § 5-150, adopted by Ord. No. 10-2023 (eff. 6/13/23)
  • Uniform Code for the Abatement of Dangerous Buildings, 1994 Edition (ICBO) — Municipal Code § 5-16, as amended by Ord. Nos. 12-1992, 26-1995, and 2-2009
  • Any references to plumbing or electrical requirements (except required-fixture references) are explicitly EXCEPTED from both the IBC and IRC as locally adopted — Municipal Code § 5-31(b) and § 5-56(b) — because plumbing and electrical permitting/inspection in Sterling is handled by the State of Colorado, not the City
  • Manufactured/mobile home installations follow C.R.S. § 24-32-3101 et seq. rather than a City-adopted installation code — Municipal Code § 5-121

Permit types & fees

Sterling's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Sterling yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Sterling lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD)
No data reported
Full year 2025
0units

0 buildings · $0 valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Sterling is a home-rule city with its OWN Public Works Department, Code Enforcement Division (421 N. 4th Street) issuing building, mechanical, fence, demolition, sign, and zoning compliance permits. Logan County's own unincorporated-area building-permit program (if any) is not confirmed either way — treat it as a separate open question, not resolved by this entry.
  • Unusual authority split: the City of Sterling does not issue electrical or plumbing permits at all. File both directly with the State of Colorado (DORA, Division of Professions and Occupations), and state inspectors perform the inspections. The City's own Framing and Final Building inspections require the state rough and final electrical and plumbing sign-offs to already be in hand, so sequence the state work first. Sterling's IBC/IRC adoption expressly excepts plumbing and electrical requirements at Municipal Code § 5-31(b) and § 5-56(b). Durango, CO splits authority the same way.
  • Sterling still requires a SEPARATE City contractor's license (Class IV Subcontractor, $50/year, among five license classes) for electrical and plumbing contractors working in city limits, on top of their state trade license — Municipal Code § 9-62 requires proof of current state licensure before the City will issue that City license.
  • Building and Mechanical Permits share ONE valuation-based fee table (Section III, Public Works, Schedule of Charges and Fees, Resolution No. 11-1-24, eff. 1/1/2025) — Fence and Demolition Permits are flat $30.00 fees, a much simpler structure than the tiered valuation tables.
  • City Use Tax is 4% of material cost (or 4% of at least half of total permit valuation if material cost isn't separately listed) — confirmed verbatim from the City's own Permits and Licenses page, layered on top of the base permit fee.
  • Sterling's adopted code cycle is the 2018 I-Codes — IBC, IRC, IMC, IECC, IFGC and IEBC — all six adopted by companion ordinances 5-2023 through 10-2023, effective 6/13/2023. That is one cycle behind the 2024 I-Codes in newer Colorado adoptions, so requirements can differ from a neighbouring city.
  • No plan-review turnaround SLA is published by the City for ANY permit type. The only published timing commitment is for INSPECTION scheduling: requests received before noon are completed that same afternoon, requests after noon are completed the following morning — this is a field-inspection scheduling commitment, not a permit-issuance timeline, and this record does not conflate the two.
  • Sterling's roofing rules are strict: complete tearoff only, with no overlay layers ever permitted, plus a mandatory in-person pre-mid-roof inspection before any final roof inspection will be granted — 'No final roofs will be completed without a pre-mid inspection.' Build that extra inspection into your schedule.
  • Sterling publishes no dedicated solar-PV permit program, no ADU/accessory-dwelling-unit ordinance, and no building-valuation design-criteria page (snow/wind/frost) specific to the City on its own site — these are genuinely unpublished/unconfirmed rather than assumed, and are not modeled as separate permit types here. A 'Climate and Geographic Design Criteria 2023' document is referenced by title on the Permits and Licenses page but is not itself available for verification.
  • Storage sheds 120 sq. ft. or smaller are exempt from Sterling's permitting requirement — a specific, city-published size threshold worth confirming against for small accessory structures.
  • Downloadable permit application PDFs were reported as 'pulled from the site due to ADA compliance requirements' per the City's own Permits and Licenses page, though several remain independently hosted on the City's Revize CMS (cms6.revize.com) as of the last verification and were used as direct sources for this record; confirm current form availability with Public Works (harbart@sterlingcolo.com, (970) 522-9700 ext. 1109) before relying on a specific downloaded form long-term.

Comparable nearby cities

Fort Morgan
14 shared permit types~40 mi away
Compare fees →
Haxtun
13 shared permit types~30 mi away
Compare fees →
Holyoke
12 shared permit types~47 mi away
Compare fees →