Roofing Permit (Re-Roof) — Sterling, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.sterlingcolo.com/departments/public_works/permits_and_licenses.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Roofing Permit (Re-Roof) in Sterling, Colorado
Required for reroofing work on structures in Sterling, using a dedicated Re-Roof Permit Application. Governed by the 2018 IRC/IBC as locally adopted, with detailed local rules requiring complete tearoff (no overlays), ice barrier, flashing, ventilation, and a mandatory pre-mid-roof inspection in addition to the final inspection.
Verified 2026-07-06 · Source
When you need this permit
- Permit required for reroofing, per the Permits and Licenses page ('reroofing' is listed among permit-required work)
- Only ONE layer of asphalt shingles allowed (2018 IRC § R907.3(4) / § R903.5) — NO OVERLAYS; complete tearoff to the exposed deck is required, with no felt or underlayment permitted to remain
- Ice barrier required in areas with a history of ice-damming (Table R301.2(1)), per § R905.1.2: two cemented underlayment layers or a self-adhering polymer-modified bitumen sheet, extending from the lowest roof edge to at least 24 inches inside the exterior wall line (36 inches on slopes 8:12 or greater), except detached accessory structures without conditioned floor area
- Flashings required per § R905.2.8 / § R905.3.8 / § R905.4.6 / § R905.6.6 / § R905.8.8 or manufacturer's installation instructions, depending on roofing material
- Roof/attic ventilation required per § R806.1-R806.2 (net free ventilating area not less than 1/150 of the ventilated space, or 1/300 if 50-80% of vents are in the upper portion at least 3 ft above eave/cornice vents)
- Asphalt shingles must meet ASTM D7158 (Class G or H) for wind resistance
- Sheathing must be solid per 2018 IRC § R905.2.1 — asphalt shingles must be fastened to solidly sheathed decks
- An IN-PERSON pre-mid-roof inspection is required in addition to the final roof inspection — 'No final roofs will be completed without a pre-mid inspection'
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Pre-Mid-Roof Inspection
Mandatory in-person inspection required before the roof can be completed; 'No final roofs will be completed without a pre-mid inspection'
- 2
Final Roof Inspection
Completed roof — tearoff, ice barrier, flashing, ventilation, and fastening compliance verified per 2018 IRC as locally amended
See the full Sterling inspection guide — scheduling & re-inspection fees →
Tips
- Sterling requires FULL tearoff on every reroof — no overlay layers are permitted at all, regardless of existing layer count, and no felt/underlayment may be left on the deck.
- Don't skip the pre-mid-roof inspection: the City will not complete/approve a final roof without it having occurred first, per the City's own roofing bulletin.
- Ice barrier is required in areas with a history of ice damming per the state climatic table (Table R301.2(1)) — confirm whether your specific roof area needs it based on slope and location before installing underlayment.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sterling building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Sterling
Roofing Permit (Re-Roof) in other cities
Compare roofing permit (re-roof) fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Sterling project checklist
Describe your project once and get every permit, document, and fee it triggers in Sterling — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →