Fence Permit — Sterling, Colorado · Requirements sheet
Verified 2026-07-06 · Source: https://www.sterlingcolo.com/departments/public_works/permits_and_licenses.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Fence Permit in Sterling, Colorado
Required prior to installation or repair of any fence, free-standing wall, or retaining wall, or hedge, in Sterling, using a dedicated Fence Permit Application. A flat $30.00 fee applies.
Verified 2026-07-06 · Source
When you need this permit
- Permit required for fence installation and repair, per the Permits and Licenses page
- Application requires a sketch plan showing all property lines, sidewalks, streets, alleys, easements, and improvements, plus the proposed fence, free-standing or retaining wall, or hedge
- Application must describe materials, size, and height separately for front yard, side yards, and rear yard placement
- If the property owner is not the applicant, the property owner must sign the application
- Zoning district is confirmed by Public Works as part of processing (noted on the application's department-use section)
- 'Call Before You Dig' (811 / 1-800-922-1987, Utility Notification Center of Colorado) is required by state law before digging post holes
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Inspection
Height, location relative to property line/setback, and materials verified against the approved sketch plan
See the full Sterling inspection guide — scheduling & re-inspection fees →
Tips
- Sterling's Fence Permit Application requires a hand-sketched site plan showing property lines, easements, and existing improvements — prepare this before applying, not after.
- Height and material must be described separately for front yard, side yards, and rear yard on the application — a single blanket description of the whole fence isn't sufficient.
- Call 811 (Utility Notification Center of Colorado) before digging post holes — this is a state-law requirement independent of the City permit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sterling building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Sterling
Fence Permit in other cities
Compare fence permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Sterling project checklist
Describe your project once and get every permit, document, and fee it triggers in Sterling — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →