Residential/Commercial Solar Photovoltaic (PV) Permit in Sterling, Colorado
Required for installation of a rooftop or ground-mounted solar photovoltaic system within Sterling city limits. Sterling's own Permits and Licenses page and 2025 fee resolution have no dedicated solar line item — the structural/racking scope is billed under the same valuation-based Building Permit fee table (Section III, Public Works, Schedule of Charges and Fees, Resolution No. 11-1-24) as other building work, and the electrical interconnection scope is a State of Colorado (DORA) electrical permit, the same as all other electrical work in Sterling. Colorado's statewide C.R.S. § 24-48.5-113 independently caps whatever fee is actually assessed for a solar energy device installation at $500 for a residential permit or $1,000 for a nonresidential/commercial permit (systems under 2 megawatts), overriding Sterling's general valuation-based fee table for this specific device type.
Reviewed 2026-08-02 · Source
When you need this permit
- A structural/racking permit is required, issued through the same City of Sterling Building Permit mechanism as the other permits recorded here (Municipal Code § 5-1 et seq.)
- Electrical interconnection is NOT issued by the City of Sterling — per the City's own Permits and Licenses page, 'Plumbing and electrical permits are filed through the State of Colorado and are inspected by local state plumbing and electrical inspectors,' the same mechanism documented for Sterling's Electrical Permit entry in this record
- Per C.R.S. § 24-48.5-113(3)(a), for a residential application or a nonresidential application producing less than 2 megawatts, 'the fees charged shall not exceed the lesser of the actual costs in issuing the permit or reviewing the application or five hundred dollars for a residential application or one thousand dollars for a nonresidential application' — this statutory cap applies to both the City's structural permit and the State's electrical permit combined, per the statute's plain 'aggregate of all charges' language
- Per C.R.S. § 24-48.5-113, the City (and the State, as the electrical permitting authority) must clearly and individually itemize all fees and taxes assessed on the permit invoice
- City Use Tax (4% of material cost, or 4% of at least half of total permit valuation) still applies to the structural/racking portion of the installation, since the statutory fee cap governs permit/review fees rather than use tax
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical (State)
Conducted by State of Colorado electrical inspectors before concealment; part of the same state-inspected process documented for Sterling's general Electrical Permit entry.
- 2
Final Building Inspection (City)
City final inspection of the racking/mounting structural scope; requires the state rough/final electrical sign-off to already be in hand, per the same mechanism documented for Sterling's Residential Building Permit entry.
See the full Sterling inspection guide — scheduling & re-inspection fees →
Tips
- Sterling itself publishes no solar-specific fee, but Colorado's statewide C.R.S. § 24-48.5-113 independently caps the combined City-plus-State fee at $500 for a residential system and $1,000 for a commercial system under 2 megawatts — ask both the City and DORA to itemize their fees so you can confirm the combined total does not exceed the statutory cap.
- Because Sterling routes ALL electrical permitting (not just solar) to the State of Colorado, the solar interconnection permit follows the exact same DORA process already documented in the Electrical Permit entry — apply directly to dpo.colorado.gov/EandP/Permits, not to the City.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-02.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sterling building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Sterling's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Sterling yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Sterling lands. Privacy.
Other permits in Sterling
Residential/Commercial Solar Photovoltaic (PV) Permit in other cities
Compare residential/commercial solar photovoltaic (pv) permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Sterling project checklist
Describe your project once and get every permit, document, and fee it triggers in Sterling — in one checklist. Free, for any city and any number of projects.
Get started →