Skip to main content
PermitBase

Haxtun building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Haxtun, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
145 S. Colorado Ave., P.O. Box 205, Haxtun, CO 80731
Phone
970-774-6104
Email
Office hours
Monday-Friday 7:30 am - 4:15 pm. After-hours/utility emergencies: Phillips County Comm Center, 970-854-2735.

Inspection guide

See how inspections work in Haxtun — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC), Chapters 1-35 plus Appendices C, E, H, I & J — Haxtun Municipal Code (HMC) § 150.01, adopted by Ord. 2025-1, passed 10-6-2025
  • 2018 International Residential Code (IRC), Chapters 1-43 plus Appendices F, G, H & L — HMC § 150.02, adopted by Ord. 2025-1
  • 2018 International Mechanical Code (IMC), Chapters 1-15 — HMC § 150.03, adopted by Ord. 2025-1
  • 2018 International Fuel Gas Code (IFGC), Chapters 1-8 — HMC § 150.04, adopted by Ord. 2025-1
  • 2018 International Property Maintenance Code (IPMC), Chapters 1-8 — HMC § 150.05, adopted by Ord. 2025-1
  • Uniform Code for the Abatement of Dangerous Buildings, 1991 Edition (ICBO) — HMC § 150.06, adopted per C.R.S. Title 31, Art. 16, Part 2 (Ord. 2017-2, passed 4-3-2017; Ord. 2024-7, passed 11-4-2024)
  • 2018 International Existing Building Code (IEBC), Chapters 1-16 — HMC § 150.07, adopted by Ord. 2025-1
  • 2021 International Energy Conservation Code (IECC), including Appendices CB and RB — HMC § 150.08, adopted by Ord. 2025-1
  • Colorado Model Electric Ready and Solar Ready Code, dated June 1, 2023 (Colorado Dept. of Local Affairs) — HMC § 150.09, adopted by Ord. 2025-1
  • 2021 International Plumbing Code (IPC), Chapters 1-13 — HMC § 150.10, adopted by Ord. 2025-1
  • 2023 National Electrical Code (NEC), exclusive of appendices (NFPA) — HMC § 150.11, adopted by Ord. 2025-1
  • Note on currency and provenance: this entire code slate (all 11 sections of HMC Chapter 150) was freshly re-adopted via Ordinance 2025-1, with second/final reading confirmed passed unanimously at the Town Council's October 6, 2025 Regular Meeting (minutes: 'A public hearing was held for Ordinance 2025-1 Adopting by reference the 2018 Editions of the International Building Codes, the 2021 Editions of the International Energy Conservation Code and the International Plumbing Code, the CO Model Solar Ready and Electric Code, and the 2023 Edition of the National Electric Code... the motion passed.'). This is unusually current for a town of Haxtun's size and directly corroborated by two independent official sources (the codified ordinance text on American Legal Publishing's code library, and the Town's own primary-source meeting minutes PDF).

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
No data reported
Year to date (2026 YTD)
No data reported
Full year 2025
0units

0 buildings · $0 valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Haxtun is a genuine, independently-operating small-town building-permit program — NOT a case of deferring to Phillips County. The Town adopted a full, current suite of 2018-2023 ICC-family codes (IBC, IRC, IMC, IFGC, IPMC, IEBC, IECC, IPC, plus the Colorado Model Electric Ready and Solar Ready Code and the 2023 NEC) via Ordinance 2025-1, passed on second/final reading at the October 6, 2025 Town Council meeting — an unusually current and well-documented code adoption for a town of roughly 950 residents.
  • Electrical inspections are explicitly deferred to a State of Colorado inspector (State Electrical Board/DORA) per the Town's own permit application language — plan for up to a 3-day wait for that specific inspection, separate from the Town's own 3-working-day permit processing commitment. Plumbing, by contrast, shows no equivalent state-deferral language and appears to be reviewed/inspected locally under the Town's own adopted 2021 IPC.
  • Haxtun's own fee schedule is a simple, dated-looking flat/incremental table ($10 up to $1,000 valuation; $25 up to $2,500; $25 plus $5/$1,000 above that) plus a flat 4.5% use tax — a genuinely different, much simpler structure than the modern ICC valuation tables used by larger Colorado jurisdictions in this corpus. This is presented as found, not modernized or assumed.
  • The Town is its own water/sewer/electric utility provider (participates in the NMPP/MEAN power pool) and collects Water Tap ($2,000), Sewer Tap ($2,000), and Electric Tap ($1,000) fees directly on the same building permit form — these are utility charges, not Building Division review fees, but they are real and commonly overlooked costs for new construction in Haxtun.
  • No residential fire sprinkler requirement: HMC § 150.02(B) deletes IRC R309.5, R313.1, and R313.2 in their entirety — Haxtun does not require automatic fire sprinklers in one- and two-family dwellings or townhouses, unlike some larger Front Range jurisdictions.
  • HB22-1362 statewide energy code floor: Haxtun's locally adopted 2021 IECC (fresh via Ord. 2025-1) satisfies the statewide minimum energy-code baseline. No population-based exemption threshold was found or assumed for Haxtun — a claimed flat population exemption belongs to the never-enacted SB25-141 and was deliberately NOT applied in this research.
  • A permit expires if work is not commenced within 180 days of issuance, or is suspended/abandoned for 180 days; recommencing within 1 year of suspension costs half the original permit fee; the project must be substantially completed within 2 years — these figures are stated directly on the Town's own permit application and repeated identically across HMC §§ 150.01-150.02, 150.03, 150.04, and 150.07.
  • Foundation design must be stamped by a Colorado-registered design professional and based on an engineer's soils report (IRC R401.2 as locally amended) — a genuine, current local requirement, not boilerplate.
  • Permit holders must call 811 (UNCC) for all utility locates, and a large project (new home or extensive remodel) requires the contractor/homeowner to rent a roll-off dumpster for trash disposal — both stated directly on the Town's permit form.
  • Haxtun's site (townofhaxtun.colorado.gov) is hosted on the State of Colorado's shared municipal web platform and returned HTTP 403 to a bare WebFetch request; a full-header browser-style curl request succeeded (HTTP 200) — if re-verifying, use a complete browser User-Agent, consistent with other small Colorado towns in this corpus on the same platform.

Comparable nearby cities

Holyoke
Both in Phillips County8 shared permit types~18 mi away
Compare fees →
Sterling
9 shared permit types~30 mi away
Compare fees →
Yuma
7 shared permit types~36 mi away
Compare fees →