Haxtun building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Haxtun, Colorado.
Last verified 2026-07-06 · Source · Embed this page’s badge · Version history
Building department
- Address
- 145 S. Colorado Ave., P.O. Box 205, Haxtun, CO 80731
- Phone
- 970-774-6104
- Office hours
- Monday-Friday 7:30 am - 4:15 pm. After-hours/utility emergencies: Phillips County Comm Center, 970-854-2735.
- Website
- Official site
Inspection guide
See how inspections work in Haxtun — sequence, scheduling & re-inspection fees.
Codes adopted
Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.
- 2018 International Building Code (IBC), Chapters 1-35 plus Appendices C, E, H, I & J — Haxtun Municipal Code (HMC) § 150.01, adopted by Ord. 2025-1, passed 10-6-2025
- 2018 International Residential Code (IRC), Chapters 1-43 plus Appendices F, G, H & L — HMC § 150.02, adopted by Ord. 2025-1
- 2018 International Mechanical Code (IMC), Chapters 1-15 — HMC § 150.03, adopted by Ord. 2025-1
- 2018 International Fuel Gas Code (IFGC), Chapters 1-8 — HMC § 150.04, adopted by Ord. 2025-1
- 2018 International Property Maintenance Code (IPMC), Chapters 1-8 — HMC § 150.05, adopted by Ord. 2025-1
- Uniform Code for the Abatement of Dangerous Buildings, 1991 Edition (ICBO) — HMC § 150.06, adopted per C.R.S. Title 31, Art. 16, Part 2 (Ord. 2017-2, passed 4-3-2017; Ord. 2024-7, passed 11-4-2024)
- 2018 International Existing Building Code (IEBC), Chapters 1-16 — HMC § 150.07, adopted by Ord. 2025-1
- 2021 International Energy Conservation Code (IECC), including Appendices CB and RB — HMC § 150.08, adopted by Ord. 2025-1
- Colorado Model Electric Ready and Solar Ready Code, dated June 1, 2023 (Colorado Dept. of Local Affairs) — HMC § 150.09, adopted by Ord. 2025-1
- 2021 International Plumbing Code (IPC), Chapters 1-13 — HMC § 150.10, adopted by Ord. 2025-1
- 2023 National Electrical Code (NEC), exclusive of appendices (NFPA) — HMC § 150.11, adopted by Ord. 2025-1
Note on currency and provenance: this entire code slate (all 11 sections of HMC Chapter 150) was freshly re-adopted via Ordinance 2025-1, with second/final reading confirmed passed unanimously at the Town Council's… Show full textShow less
Note on currency and provenance: this entire code slate (all 11 sections of HMC Chapter 150) was freshly re-adopted via Ordinance 2025-1, with second/final reading confirmed passed unanimously at the Town Council's October 6, 2025 Regular Meeting (minutes: 'A public hearing was held for Ordinance 2025-1 Adopting by reference the 2018 Editions of the International Building Codes, the 2021 Editions of the International Energy Conservation Code and the International Plumbing Code, the CO Model Solar Ready and Electric Code, and the 2023 Edition of the National Electric Code... the motion passed.'). This is unusually current for a town of Haxtun's size and directly corroborated by two independent official sources (the codified ordinance text on American Legal Publishing's code library, and the Town's own primary-source meeting minutes PDF).
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family home construction in the Town of Haxtun. Reviewed under the 2018 IRC (as locally adopted and amended by HMC § 150.02, Ord. 2025-1) plus the town's completed Climatic and Geographic Design Criteria (30 psf ground snow load, 115 mph wind design speed, 30-inch frost depth, ice barrier underlayment required). Issued via the Town's 'Application for Building Permit' form and validated/signed by the Town's Building Inspector.
From$10.00Residential Addition / Remodel Permit
Required for alterations or additions to existing residential property in the Town of Haxtun, using the same 'Application for Building Permit' form (Section 2: Alteration or Addition to Existing Property). Reviewed under the 2018 IRC as locally adopted and amended.
From$10.00Electrical Permit
Electrical work in Haxtun is inspected by the Colorado State Electrical Board (DORA), not the Town's own inspector, per the Town's own permit application instructions. The Town's Building Permit Application still collects an Electric Tap Fee as the municipal utility provider, and HMC § 150.11 adopts the 2023 NEC as the applicable code, but inspection authority for electrical work rests with the State.
From$2,000.00Plumbing Permit
Required for plumbing installation, alteration, or repair in Haxtun. Governed by the 2021 International Plumbing Code (IPC) as locally adopted and amended (HMC § 150.10, Ord. 2025-1). Unlike electrical work, the Town's own permit application does not direct plumbing to a state inspector — plumbing is reviewed/inspected under the Town's own adopted code and validated by the Town's Building Inspector.
From$2,000.00Mechanical / HVAC Permit
Required for mechanical/HVAC equipment installation or replacement in Haxtun. Governed by the 2018 International Mechanical Code (IMC), HMC § 150.03, and the 2018 International Fuel Gas Code (IFGC), HMC § 150.04, both adopted/amended by Ord. 2025-1.
From$10.00Re-Roof Permit
Required for re-roofing work in Haxtun under the general Application for Building Permit form. Governed by the 2018 IBC/IRC as locally adopted; Haxtun's completed IRC Climatic and Geographic Design Criteria requires ice barrier underlayment.
From$10.00valuation-basedRooftop Solar Photovoltaic Permit
Required for rooftop solar PV installations in Haxtun. Electrical connection work is subject to the State of Colorado electrical inspection process described under the Electrical Permit type; the installation itself is governed by the Colorado Model Electric Ready and Solar Ready Code (HMC § 150.09, adopted June 1, 2023 edition, via Ord. 2025-1) plus the 2023 NEC (HMC § 150.11).
From$10.00valuation-basedDemolition Permit
Demolition of a dangerous or existing building in Haxtun is addressed through the Uniform Code for the Abatement of Dangerous Buildings (1991 Edition, HMC § 150.06) for unsafe structures, and through the general Application for Building Permit process for a voluntary/planned demolition.
From$10.00valuation-basedEV Charger / EVSE Permit
Haxtun has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. An EV charger installation is billed under the Town's general valuation-based Application for Building Permit (the same combined form and fee table used for all building-related work, including the rooftop solar PV permit's structural scope), and the electrical/circuit work must be inspected by a State of Colorado electrical inspector rather than the Town, exactly as with any other new electrical installation. Colorado's HB24-1173 (Electric Vehicle Charging System Permits, 2024) requires expedited EV-charger permitting only for counties with 20,000+ population and municipalities with 10,000+ population -- Haxtun (population under 1,000) falls well below that threshold and is not a covered municipality under the statute.
From$10.00Commercial Building Permit
Commercial/business construction in Haxtun is fully permitted — the Town adopted the 2018 International Building Code, Chapters 1-35 plus Appendices C, E, H, I & J, as its Building Code (HMC § 150.01, Ord. 2025-1, passed 10-6-2025; confirmed live in the 2026 S-1 code supplement) — but there is NO separate commercial permit process, application, or fee schedule. Commercial projects use the exact same single-page 'Application for Building Permit' form, the same flat valuation-based fee table, and the same 3-working-day processing commitment as residential work. Tenant improvements/commercial alterations likewise have no distinct permit type: they are filed under Section 2 (Alteration or Addition to Existing Property) of the same form, reviewed under the 2018 IBC and the 2018 International Existing Building Code (HMC § 150.07). This undifferentiated single-track process is a confirmed fact from the Town's own live form and code, not a documentation gap.
From$10.00Sign Permit
Haxtun is a small statutory Town (population roughly 900) in Phillips County. No dedicated sign-permit page, sign code chapter, or fee schedule distinct from the general Building Permit process was located on the Town's website as of the last verification (townofhaxtun.colorado.gov); the Town's Municipal Code is hosted on American Legal Publishing's codelibrary.amlegal.com. Building permits, which would presumably cover most sign installations, are administered by the Town's Building Department at 145 S. Colorado Ave.
See fee scheduleFire Sprinkler / Fire Alarm System Permit
Fire protection for the Town of Haxtun is provided by the Haxtun Volunteer Fire Department (101 W Strohm St, 970-774-6105), which operates as part of the Holyoke Fire Protection District — a special district supporting the Amherst, Holyoke, Sandhills, and Wages volunteer fire departments across Phillips County's rural areas, dispatched via the Phillips County Communications Center. No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure was located on either the Town's or the fire department's published materials as of the last verification.
See fee scheduleChange of Use / Change of Occupancy
Haxtun does not publish a standalone 'Change of Use' or 'Change of Occupancy' permit application — the Town's Building Department page and Building Permit Application form cover general construction permitting. In Colorado, a final Certificate of Occupancy is generally contingent on satisfying all local departments with applicable jurisdiction (which may include Fire, in addition to Building). A use/occupancy change is presumed to be processed through the Town's general Building Permit Application; contact the Building Department to confirm requirements and applicable code edition for a specific project.
See fee schedule
Haxtun's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Haxtun yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Haxtun lands. Privacy.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-07)
- No data reported
- Trailing 12 months
- No data reported
- Year to date (2026 YTD)
- No data reported
- Full year 2025
- 0units
0 buildings · $0 valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity
Tips & gotchas
- Haxtun is a genuine, independently-operating small-town building-permit program — NOT a case of deferring to Phillips County. The Town adopted a full, current suite of 2018-2023 ICC-family codes (IBC, IRC, IMC, IFGC, IPMC, IEBC, IECC, IPC, plus the Colorado Model Electric Ready and Solar Ready Code and the 2023 NEC) via Ordinance 2025-1, passed on second/final reading at the October 6, 2025 Town Council meeting — an unusually current and well-documented code adoption for a town of roughly 950 residents.
- Electrical inspections are explicitly deferred to a State of Colorado inspector (State Electrical Board/DORA) per the Town's own permit application language — plan for up to a 3-day wait for that specific inspection, separate from the Town's own 3-working-day permit processing commitment. Plumbing, by contrast, shows no equivalent state-deferral language and appears to be reviewed/inspected locally under the Town's own adopted 2021 IPC.
- Haxtun's own fee schedule is a simple, dated-looking flat/incremental table ($10 up to $1,000 valuation; $25 up to $2,500; $25 plus $5/$1,000 above that) plus a flat 4.5% use tax — a genuinely different, much simpler structure than the modern ICC valuation tables used by larger Colorado jurisdictions. The schedule is presented as published.
- The Town is its own water/sewer/electric utility provider (participates in the NMPP/MEAN power pool) and collects Water Tap ($2,000), Sewer Tap ($2,000), and Electric Tap ($1,000) fees directly on the same building permit form — these are utility charges, not Building Division review fees, but they are real and commonly overlooked costs for new construction in Haxtun.
- No residential fire sprinkler requirement: HMC § 150.02(B) deletes IRC R309.5, R313.1, and R313.2 in their entirety — Haxtun does not require automatic fire sprinklers in one- and two-family dwellings or townhouses, unlike some larger Front Range jurisdictions.
- HB22-1362 statewide energy code floor: Haxtun's locally adopted 2021 IECC (fresh via Ord. 2025-1) satisfies the statewide minimum energy-code baseline. No population-based exemption threshold applies to Haxtun — a claimed flat population exemption belongs to the never-enacted SB25-141.
- A permit expires if work is not commenced within 180 days of issuance, or is suspended/abandoned for 180 days; recommencing within 1 year of suspension costs half the original permit fee; the project must be substantially completed within 2 years — these figures are stated directly on the Town's own permit application and repeated identically across HMC §§ 150.01-150.02, 150.03, 150.04, and 150.07.
- Foundation design must be stamped by a Colorado-registered design professional and based on an engineer's soils report (IRC R401.2 as locally amended) — a genuine, current local requirement, not boilerplate.
- Permit holders must call 811 (UNCC) for all utility locates, and a large project (new home or extensive remodel) requires the contractor/homeowner to rent a roll-off dumpster for trash disposal — both stated directly on the Town's permit form.
- Haxtun's site (townofhaxtun.colorado.gov) is hosted on the State of Colorado's shared municipal web platform, as are a number of other small Colorado towns.