Skip to main content
PermitBase

Haxtun building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Haxtun, Colorado.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
145 S. Colorado Ave., P.O. Box 205, Haxtun, CO 80731
Phone
970-774-6104
Email
Office hours
Monday-Friday 7:30 am - 4:15 pm. After-hours/utility emergencies: Phillips County Comm Center, 970-854-2735.

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation

    Before concrete pour, per 30-inch minimum frost line depth; foundation drains inspected by a Colorado-registered design professional per local IRC amendment

  2. 2

    Insulation Inspection

    After completed and approved rough inspection, following installation of wall/ceiling/floor insulation and exterior windows, before wall coverings are installed (HMC § 150.02(B)(6), IRC R109.1.5.2 as added locally)

  3. 3

    Rough Electrical (State of Colorado Inspector)

    All new electrical installations must be inspected by a State of Colorado inspector before electricity can be supplied; allow up to 3 days for this inspection

  4. 4

    Final Inspection

    All work complete per approved plans and applicable codes; permit must be validated/signed by the Town of Haxtun Building Inspector

Applies to: EV Charger / EVSE Permit

  1. 1

    State Electrical Inspection

    Performed by a State of Colorado inspector (phone 1-800-955-5770); required before the charger circuit can be energized -- allow up to 3 days

  2. 2

    Final Inspection

    Verified by the Town's Building Inspector

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork, flues, gas piping (min. 18-inch burial depth) before concealment

  2. 2

    Final Inspection

    Equipment operational, venting/combustion air verified; permit validated by the Town's Building Inspector

Applies to: Plumbing Permit

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment, per 2021 IPC as locally amended

  2. 2

    Final Inspection

    Fixtures connected, no leaks; permit validated/signed by the Town of Haxtun Building Inspector

Applies to: Residential Addition / Remodel Permit

  1. 1

    Rough Framing/Trades

    Framing and trade rough-ins before concealment, scope-dependent

  2. 2

    Final Inspection

    All work complete per approved plans; permit validated/signed by the Town of Haxtun Building Inspector

Applies to: Rooftop Solar Photovoltaic Permit

  1. 1

    State Electrical Inspection (interconnection)

    Performed by a State of Colorado inspector; required before the system's electrical connection can be energized

  2. 2

    Final Inspection

    Racking/roof penetrations verified; permit validated by the Town's Building Inspector

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Haxtun building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Haxtun building permits

Get alerts for Haxtun

We'll email you when Haxtun's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.