Re-Roof Permit in Haxtun, Colorado

Required for re-roofing work in Haxtun under the general Application for Building Permit form. Governed by the 2018 IBC/IRC as locally adopted; Haxtun's completed IRC Climatic and Geographic Design Criteria requires ice barrier underlayment.

Reviewed 2026-07-06 · Source

When you need this permit

  • Reviewed under the 2018 IBC/IRC as locally amended
  • Ice Barrier Underlayment Required per the Town's completed IRC Table R301.2(1) Climatic and Geographic Design Criteria
  • Application for Building Permit form, Section 2 (Alteration or Addition to Existing Property), with plat map/sketch showing the property

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, general schedule)No standalone flat re-roof fee is published; billed under the general valuation-based schedule
$10.00-$25.00 base, plus $5.00 per $1,000 above $2,500 valuation
Use Tax
4.5% of the valuation of all materials

Review timeline

Plan reviewHaxtun’s published plan-review target
3–3 business days

How long did your Re-Roof Permit permit actually take in Haxtun?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection (roof)

    Completed roof, ice barrier underlayment compliance verified; permit validated by the Town's Building Inspector

See the full Haxtun inspection guide — scheduling & re-inspection fees →

Tips

  • Haxtun's IRC Table R301.2(1) requires ice barrier underlayment ('YES') — confirm your roofer is pricing this in for any re-roof.

Frequently asked questions

Haxtun requires a re-roof permit for: Reviewed under the 2018 IBC/IRC as locally amended; Ice Barrier Underlayment Required per the Town's completed IRC Table R301.2(1) Climatic and Geographic Design Criteria; Application for Building Permit form, Section 2 (Alteration or Addition to Existing Property), with plat map/sketch showing the property. If your project isn't listed, confirm with Town of Haxtun (Town Superintendent / Building Inspector function; Town Hall administers permits) at 970-774-6104 before starting work.

In Haxtun, the published Building Permit Fee (valuation-based, general schedule) is: $10.00-$25.00 base, plus $5.00 per $1,000 above $2,500 valuation. Additional published fees: Use Tax — 4.5% of the valuation of all materials. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Haxtun's published plan-review target for a re-roof permit is 3–3 business days.

You'll need: Application for Building Permit (Town of Haxtun) — Section 2. See the required-documents checklist on this page for details on each.

Haxtun requires 1 inspection(s) for a re-roof permit, in order: Final Inspection (roof). Schedule each through Town of Haxtun (Town Superintendent / Building Inspector function; Town Hall administers permits) (970-774-6104).

Apply through Town of Haxtun (Town Superintendent / Building Inspector function; Town Hall administers permits) at 145 S. Colorado Ave., P.O. Box 205, Haxtun, CO 80731. Phone: 970-774-6104. Office hours: Monday-Friday 7:30 am - 4:15 pm. After-hours/utility emergencies: Phillips County Comm Center, 970-854-2735.. Official information: https://townofhaxtun.colorado.gov/building-department.

Haxtun, Colorado has adopted: 2018 International Building Code (IBC), Chapters 1-35 plus Appendices C, E, H, I & J — Haxtun Municipal Code (HMC) § 150.01, adopted by Ord. 2025-1, passed 10-6-2025; 2018 International Residential Code (IRC), Chapters 1-43 plus Appendices F, G, H & L — HMC § 150.02, adopted by Ord. 2025-1; 2018 International Mechanical Code (IMC), Chapters 1-15 — HMC § 150.03, adopted by Ord. 2025-1; 2018 International Fuel Gas Code (IFGC), Chapters 1-8 — HMC § 150.04, adopted by Ord. 2025-1; 2018 International Property Maintenance Code (IPMC), Chapters 1-8 — HMC § 150.05, adopted by Ord. 2025-1; Uniform Code for the Abatement of Dangerous Buildings, 1991 Edition (ICBO) — HMC § 150.06, adopted per C.R.S. Title 31, Art. 16, Part 2 (Ord. 2017-2, passed 4-3-2017; Ord. 2024-7, passed 11-4-2024); 2018 International Existing Building Code (IEBC), Chapters 1-16 — HMC § 150.07, adopted by Ord. 2025-1; 2021 International Energy Conservation Code (IECC), including Appendices CB and RB — HMC § 150.08, adopted by Ord. 2025-1; Colorado Model Electric Ready and Solar Ready Code, dated June 1, 2023 (Colorado Dept. of Local Affairs) — HMC § 150.09, adopted by Ord. 2025-1; 2021 International Plumbing Code (IPC), Chapters 1-13 — HMC § 150.10, adopted by Ord. 2025-1; 2023 National Electrical Code (NEC), exclusive of appendices (NFPA) — HMC § 150.11, adopted by Ord. 2025-1; Note on currency and provenance: this entire code slate (all 11 sections of HMC Chapter 150) was freshly re-adopted via Ordinance 2025-1, with second/final reading confirmed passed unanimously at the Town Council's October 6, 2025 Regular Meeting (minutes: 'A public hearing was held for Ordinance 2025-1 Adopting by reference the 2018 Editions of the International Building Codes, the 2021 Editions of the International Energy Conservation Code and the International Plumbing Code, the CO Model Solar Ready and Electric Code, and the 2023 Edition of the National Electric Code... the motion passed.'). This is unusually current for a town of Haxtun's size and directly corroborated by two independent official sources (the codified ordinance text on American Legal Publishing's code library, and the Town's own primary-source meeting minutes PDF).. Local amendments apply — see the Haxtun overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Haxtun building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.