Skip to main content
PermitBase

Plumbing Permit in Haxtun, Colorado

Required for plumbing installation, alteration, or repair in Haxtun. Governed by the 2021 International Plumbing Code (IPC) as locally adopted and amended (HMC § 150.10, Ord. 2025-1). Unlike electrical work, the Town's own permit application does not direct plumbing to a state inspector — plumbing is reviewed/inspected under the Town's own adopted code and validated by the Town's Building Inspector.

Reviewed 2026-07-06 · Source

When you need this permit

  • Governed by the 2021 IPC as locally amended by HMC § 150.10: sewer depth requirement filled in at 12 inches (amended from a blank template value), first paragraph of drainage/vent air test (IPC 312.3) deleted, roof extension minimum set at 12 inches, reclaimed water systems (IPC 1304) deleted entirely
  • Water Tap Fee ($2,000 normal residential 3/4-inch) and Sewer Tap Fee ($2,000 normal residential 4-inch) apply as separate municipal utility charges when a new tap is required, in addition to the plumbing/building permit fee
  • Plumbing contractors must hold applicable Colorado State Plumbing Board (DORA) licensure per general state law

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Water Tap Fee (normal residential 3/4-inch)1-inch and larger taps include tap fee plus cost of larger pipe and meter
$2,000.00
Sewer Tap Fee (normal residential 4-inch)Larger sewer taps include tap fee plus cost of additional material
$2,000.00
Building Permit Fee (valuation-based, same schedule as general building permit)Plumbing work is not billed under a separate standalone fee line on the Town's form; it is captured within the general permit valuation and applicable tap fees
$10.00-$25.00 base, plus $5.00 per $1,000 above $2,500 valuation

Review timeline

Plan reviewHaxtun’s published plan-review target
3–3 business days

How long did your Plumbing Permit permit actually take in Haxtun?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Plumbing

    Pipe, drain, waste, and vent installation before concealment, per 2021 IPC as locally amended

  2. 2

    Final Inspection

    Fixtures connected, no leaks; permit validated/signed by the Town of Haxtun Building Inspector

See the full Haxtun inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike electrical, Haxtun's own permit form contains no language directing plumbing inspections to the State of Colorado — plumbing appears to be reviewed and inspected locally under the Town's own adopted 2021 IPC.
  • Budget for the Town's water and sewer tap fees ($2,000 each) separately from the plumbing permit fee itself if a new utility connection is required.

Frequently asked questions

Haxtun requires a plumbing permit for: Governed by the 2021 IPC as locally amended by HMC § 150.10: sewer depth requirement filled in at 12 inches (amended from a blank template value), first paragraph of drainage/vent air test (IPC 312.3) deleted, roof extension minimum set at 12 inches, reclaimed water systems (IPC 1304) deleted entirely; Water Tap Fee ($2,000 normal residential 3/4-inch) and Sewer Tap Fee ($2,000 normal residential 4-inch) apply as separate municipal utility charges when a new tap is required, in addition to the plumbing/building permit fee; Plumbing contractors must hold applicable Colorado State Plumbing Board (DORA) licensure per general state law. If your project isn't listed, confirm with Town of Haxtun (Town Superintendent / Building Inspector function; Town Hall administers permits) at 970-774-6104 before starting work.

In Haxtun, the published Water Tap Fee (normal residential 3/4-inch) is: $2,000.00. Additional published fees: Sewer Tap Fee (normal residential 4-inch) — $2,000.00; Building Permit Fee (valuation-based, same schedule as general building permit) — $10.00-$25.00 base, plus $5.00 per $1,000 above $2,500 valuation. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Haxtun's published plan-review target for a plumbing permit is 3–3 business days.

You'll need: Application for Building Permit (Town of Haxtun). See the required-documents checklist on this page for details on each.

Haxtun requires 2 inspection(s) for a plumbing permit, in order: Rough Plumbing, Final Inspection. Schedule each through Town of Haxtun (Town Superintendent / Building Inspector function; Town Hall administers permits) (970-774-6104).

Apply through Town of Haxtun (Town Superintendent / Building Inspector function; Town Hall administers permits) at 145 S. Colorado Ave., P.O. Box 205, Haxtun, CO 80731. Phone: 970-774-6104. Office hours: Monday-Friday 7:30 am - 4:15 pm. After-hours/utility emergencies: Phillips County Comm Center, 970-854-2735.. Official information: https://townofhaxtun.colorado.gov/building-department.

Haxtun, Colorado has adopted: 2018 International Building Code (IBC), Chapters 1-35 plus Appendices C, E, H, I & J — Haxtun Municipal Code (HMC) § 150.01, adopted by Ord. 2025-1, passed 10-6-2025; 2018 International Residential Code (IRC), Chapters 1-43 plus Appendices F, G, H & L — HMC § 150.02, adopted by Ord. 2025-1; 2018 International Mechanical Code (IMC), Chapters 1-15 — HMC § 150.03, adopted by Ord. 2025-1; 2018 International Fuel Gas Code (IFGC), Chapters 1-8 — HMC § 150.04, adopted by Ord. 2025-1; 2018 International Property Maintenance Code (IPMC), Chapters 1-8 — HMC § 150.05, adopted by Ord. 2025-1; Uniform Code for the Abatement of Dangerous Buildings, 1991 Edition (ICBO) — HMC § 150.06, adopted per C.R.S. Title 31, Art. 16, Part 2 (Ord. 2017-2, passed 4-3-2017; Ord. 2024-7, passed 11-4-2024); 2018 International Existing Building Code (IEBC), Chapters 1-16 — HMC § 150.07, adopted by Ord. 2025-1; 2021 International Energy Conservation Code (IECC), including Appendices CB and RB — HMC § 150.08, adopted by Ord. 2025-1; Colorado Model Electric Ready and Solar Ready Code, dated June 1, 2023 (Colorado Dept. of Local Affairs) — HMC § 150.09, adopted by Ord. 2025-1; 2021 International Plumbing Code (IPC), Chapters 1-13 — HMC § 150.10, adopted by Ord. 2025-1; 2023 National Electrical Code (NEC), exclusive of appendices (NFPA) — HMC § 150.11, adopted by Ord. 2025-1; Note on currency and provenance: this entire code slate (all 11 sections of HMC Chapter 150) was freshly re-adopted via Ordinance 2025-1, with second/final reading confirmed passed unanimously at the Town Council's October 6, 2025 Regular Meeting (minutes: 'A public hearing was held for Ordinance 2025-1 Adopting by reference the 2018 Editions of the International Building Codes, the 2021 Editions of the International Energy Conservation Code and the International Plumbing Code, the CO Model Solar Ready and Electric Code, and the 2023 Edition of the National Electric Code... the motion passed.'). This is unusually current for a town of Haxtun's size and directly corroborated by two independent official sources (the codified ordinance text on American Legal Publishing's code library, and the Town's own primary-source meeting minutes PDF).. Local amendments apply — see the Haxtun overview page for the full list.

Based on the Town's own Building Permit Application and Municipal Code, Haxtun appears to run its own plumbing review/inspection under its locally adopted 2021 IPC (HMC § 150.10) — the state-inspector language on the Town's permit form applies explicitly and only to electrical work, with no equivalent statement for plumbing.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Haxtun building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.