EV Charger / EVSE Permit — Haxtun, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://townofhaxtun.colorado.gov/sites/townofhaxtun/files/documents/Building%20Permit%20Application.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Haxtun, Colorado
Haxtun has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. An EV charger installation is billed under the Town's general valuation-based Application for Building Permit (the same combined form and fee table used for all building-related work, including the rooftop solar PV permit's structural scope), and the electrical/circuit work must be inspected by a State of Colorado electrical inspector rather than the Town, exactly as with any other new electrical installation. Colorado's HB24-1173 (Electric Vehicle Charging System Permits, 2024) requires expedited EV-charger permitting only for counties with 20,000+ population and municipalities with 10,000+ population -- Haxtun (population under 1,000) falls well below that threshold and is not a covered municipality under the statute.
Verified 2026-07-20 · Source
When you need this permit
- Application for Building Permit (Town of Haxtun) required for the installation, using the general valuation-based fee schedule -- no dedicated EV/EVSE fee line exists
- All new electrical installations and electrical improvements, including EV charger circuits, must be inspected by a State of Colorado electrical inspector before electricity can be supplied -- allow up to 3 days for that inspection, per the Town's own permit application instructions
- Haxtun is below the population thresholds (10,000 for municipalities) set by Colorado HB24-1173, so the statute's mandatory model-code/expedited-review requirement for EV charger permits does not apply here
- Permit holders must call UNCC (811) for all utility locates before work begins
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection
Performed by a State of Colorado inspector (phone 1-800-955-5770); required before the charger circuit can be energized -- allow up to 3 days
- 2
Final Inspection
Verified by the Town's Building Inspector
See the full Haxtun inspection guide — scheduling & re-inspection fees →
Tips
- Haxtun has no EV-specific permit or fee -- an EV charger install is billed under the Town's general valuation-based Building Permit fee table, the same one used for any other small electrical/construction project.
- As with solar and all other electrical work in Haxtun, expect the electrical/circuit portion of the install to be inspected by the State of Colorado, separate from the Town's own building-permit sign-off.
- Colorado's HB24-1173 requires expedited, standardized EV-charger permitting only in counties of 20,000+ and municipalities of 10,000+ population -- Haxtun does not meet that threshold, so this statutory mandate does not apply here.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Haxtun building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Haxtun
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Haxtun project checklist
Describe your project once and get every permit, document, and fee it triggers in Haxtun — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →