Rooftop Solar Photovoltaic Permit — Haxtun, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://townofhaxtun.colorado.gov/sites/townofhaxtun/files/documents/Building%20Permit%20Application.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Rooftop Solar Photovoltaic Permit in Haxtun, Colorado
Required for rooftop solar PV installations in Haxtun. Electrical connection work is subject to the State of Colorado electrical inspection process described under the Electrical Permit type; the installation itself is governed by the Colorado Model Electric Ready and Solar Ready Code (HMC § 150.09, adopted June 1, 2023 edition, via Ord. 2025-1) plus the 2023 NEC (HMC § 150.11).
Verified 2026-07-20 · Source
When you need this permit
- Governed by the Colorado Model Electric Ready and Solar Ready Code, dated June 1, 2023 (HMC § 150.09), and the 2023 NEC (HMC § 150.11)
- Electrical connection portions of a solar PV installation are inspected by a State of Colorado inspector, not the Town, per the Town's own permit application instructions
- Application for Building Permit form required; plat map/sketch showing panel/array location on the property
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
State Electrical Inspection (interconnection)
Performed by a State of Colorado inspector; required before the system's electrical connection can be energized
- 2
Final Inspection
Racking/roof penetrations verified; permit validated by the Town's Building Inspector
See the full Haxtun inspection guide — scheduling & re-inspection fees →
Tips
- Haxtun adopted the June 1, 2023 edition of the Colorado Model Electric Ready and Solar Ready Code fresh via Ord. 2025-1 (10-6-2025) — this is current, not a stale adoption.
- As with all electrical work in Haxtun, expect the interconnection/electrical portion of your solar install to be inspected by the State of Colorado, separate from the Town's own building-permit sign-off.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Haxtun building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Haxtun
Rooftop Solar Photovoltaic Permit in other cities
Compare rooftop solar photovoltaic permit fees across Colorado →
Look up this fee in a different city →