Version history — Haxtun, Colorado
This is PermitBase’s own verified record for Haxtun, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Haxtun’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- Haxtun, Colorado — Residential Building Permit (New Construction) fee record updated: $1,000.00 → $2,000.00
- Haxtun, Colorado — Electrical Permit fee record updated: $1,000.00 → $2,000.00
- Haxtun, Colorado — Electrical Permit fee record updated: $500.00 → $1,000.00
- Haxtun, Colorado — Commercial Building Permit fee record updated: Water $2,000 (3/4-inch residential-normal), Sewer $2,000 (4-inch), Electric $1,000 (single-phase 200-Amp) → Water $2,000 (3/4-inch residential-normal), Sewer $2,000 (4-inch), Electric $2,000 (single-phase 200-Amp)
- 2026-08-20Superseded
- 2026-08-13Superseded
- Haxtun, Colorado — Sign Permit record added
- Haxtun, Colorado — Fire Sprinkler / Fire Alarm System Permit record added
- Haxtun, Colorado — Change of Use / Change of Occupancy record added
- 2026-08-02Superseded
- Haxtun, Colorado — Commercial Building Permit record added
- 2026-07-20Superseded
- Haxtun, Colorado — EV Charger / EVSE Permit record added
- 2026-07-06Initial record — coverage of Haxtun began