Haxtun building permits

Verified

Haxtun, Colorado — as published 2026-08-26.

Verified 2026-07-06 · Source

Codes adopted

2018 International Building Code (IBC), Chapters 1-35 plus Appendices C, E, H, I & J — Haxtun Municipal Code (HMC) § 150.01, adopted by Ord. 2025-1, passed 10-6-20252018 International Residential Code (IRC), Chapters 1-43 plus Appendices F, G, H & L — HMC § 150.02, adopted by Ord. 2025-12018 International Mechanical Code (IMC), Chapters 1-15 — HMC § 150.03, adopted by Ord. 2025-12018 International Fuel Gas Code (IFGC), Chapters 1-8 — HMC § 150.04, adopted by Ord. 2025-12018 International Property Maintenance Code (IPMC), Chapters 1-8 — HMC § 150.05, adopted by Ord. 2025-1Uniform Code for the Abatement of Dangerous Buildings, 1991 Edition (ICBO) — HMC § 150.06, adopted per C.R.S. Title 31, Art. 16, Part 2 (Ord. 2017-2, passed 4-3-2017; Ord. 2024-7, passed 11-4-2024)2018 International Existing Building Code (IEBC), Chapters 1-16 — HMC § 150.07, adopted by Ord. 2025-12021 International Energy Conservation Code (IECC), including Appendices CB and RB — HMC § 150.08, adopted by Ord. 2025-1Colorado Model Electric Ready and Solar Ready Code, dated June 1, 2023 (Colorado Dept. of Local Affairs) — HMC § 150.09, adopted by Ord. 2025-12021 International Plumbing Code (IPC), Chapters 1-13 — HMC § 150.10, adopted by Ord. 2025-12023 National Electrical Code (NEC), exclusive of appendices (NFPA) — HMC § 150.11, adopted by Ord. 2025-1Note on currency and provenance: this entire code slate (all 11 sections of HMC Chapter 150) was freshly re-adopted via Ordinance 2025-1, with second/final reading confirmed passed unanimously at the Town Council's October 6, 2025 Regular Meeting (minutes: 'A public hearing was held for Ordinance 2025-1 Adopting by reference the 2018 Editions of the International Building Codes, the 2021 Editions of the International Energy Conservation Code and the International Plumbing Code, the CO Model Solar Ready and Electric Code, and the 2023 Edition of the National Electric Code... the motion passed.'). This is unusually current for a town of Haxtun's size and directly corroborated by two independent official sources (the codified ordinance text on American Legal Publishing's code library, and the Town's own primary-source meeting minutes PDF).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family home construction in the Town of Haxtun. Reviewed under the 2018 IRC (as locally adopted and amended by HMC § 150.02, Ord. 2025-1) plus the town's completed Climatic and Geographic Design Criteria (30 psf ground snow load, 115 mph wind design speed, 30-inch frost depth, ice barrier underlayment required). Issued via the Town's 'Application for Building Permit' form and validated/signed by the Town's Building Inspector.

Verified 2026-07-06 · Source

Requirements

  • Plans must comply with the 2018 IRC as locally amended, and meet Haxtun's completed Climatic and Geographic Design Criteria: 30 psf ground snow load, 115 mph wind design speed (Seismic Design Category B), 30-inch minimum frost line depth, ice barrier underlayment required
  • Foundation design must be based on an engineer's soils report and stamped by a Colorado-registered design professional (IRC R401.2 as amended); a site certification by a Colorado-registered design professional is required for setback verification on new Group R-3 occupancies
  • Foundation drains must be designed and inspected by a Colorado-registered design professional (IRC R405.1 as amended)
  • A plat map of the project on an 8.5 x 11 sheet showing footages from boundaries and type of construction must be included with the application
  • Electrical work must be inspected by a State of Colorado inspector (State Electrical Board/DORA), not the Town, per the Town's own permit application instructions
  • Permit holders must call UNCC (811) for all utility locates before any excavation
  • A large construction project (new home or extensive remodel) requires the contractor/homeowner to rent a roll-off dumpster for trash disposal

Required documents

  • RequiredApplication for Building Permit (Town of Haxtun)Homeowner/contractor info, work proposed, type of construction, size/height, number of stories, estimated material cost; validated and signed by the Town of Haxtun Building Inspector
  • RequiredPlat Map / Site Sketch8.5 x 11 sheet showing footages from property boundaries and the type of construction to be performed
  • RequiredFoundation Design and Soils ReportStamped by a Colorado-registered design professional, based on an engineer's soils report, per IRC R401.2 as locally amended

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $0 to $1,000$10.00Town of Haxtun Application for Building Permit form (current, live)
Building Permit Fee — valuation $1,001 to $2,500$25.00Town of Haxtun Application for Building Permit, 'Permit Fees' table (page 1)
Building Permit Fee — valuation $2,501 and up$25.00 plus $5.00 per $1,000 of valuationTown of Haxtun Application for Building Permit, 'Permit Fees' table (page 1)
Use Tax4.5% of the valuation of all materialsTown of Haxtun Application for Building Permit, 'Permit Fees' table and fee worksheet 'Use Tax (4.5%)' line (page 1)
Water Tap Fee (normal residential 3/4-inch)$2,000.001-inch and larger taps include the tap fee plus cost of larger pipe and meter
Sewer Tap Fee (normal residential 4-inch)$2,000.00Larger sewer taps include the tap fee plus cost of additional material
Electric Tap Fee (normal residential single-phase 200-Amp service)$2,000.00
Town of Haxtun Application for Building Permit (2025 edition), Additional Requirements, p. Show full citation

Town of Haxtun Application for Building Permit (2025 edition), Additional Requirements, p. 2 — normal residential single-phase 200-Amp service tap at $2,000.00. The applicant is charged time and materials for electrical needs above the normal service. The $1,000.00 previously recorded is the figure in the Town's 2024 edition, which remains live and is still linked from the Building Department page; the Permits and Applications page links the 2025 edition.

Re-permitting fee after 180-day expiration (work not commenced/suspended)One-half of the original permit feeOnly if no changes to original plans and suspension/abandonment has not exceeded 1 year; HMC § 150.02(B) amending IRC R108.5-equivalent expiration section

Residential Addition / Remodel Permit

Verified

Required for alterations or additions to existing residential property in the Town of Haxtun, using the same 'Application for Building Permit' form (Section 2: Alteration or Addition to Existing Property). Reviewed under the 2018 IRC as locally adopted and amended.

Verified 2026-07-06 · Source

Requirements

  • Application for Building Permit, Section 2 (Alteration or Addition to Existing Property): work proposed, type of construction, size/height, number of stories, estimated material cost
  • A plat map/sketch on 8.5 x 11 paper showing footages from boundaries and type of construction
  • If the remodel affects electrical systems, that portion must be inspected by a State of Colorado inspector
  • Large remodel projects require the contractor/homeowner to rent a roll-off dumpster for trash disposal

Required documents

  • RequiredApplication for Building Permit (Town of Haxtun) — Section 2Alteration or Addition to Existing Property section of the same form used for new construction

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $0 to $1,000$10.00Town of Haxtun Application for Building Permit, 'Permit Fees' table (page 1)
Building Permit Fee — valuation $1,001 to $2,500$25.00Town of Haxtun Application for Building Permit, 'Permit Fees' table (page 1)
Building Permit Fee — valuation $2,501 and up$25.00 plus $5.00 per $1,000 of valuationTown of Haxtun Application for Building Permit, 'Permit Fees' table (page 1)
Use Tax4.5% of the valuation of all materialsTown of Haxtun Application for Building Permit, 'Permit Fees' table and fee worksheet 'Use Tax (4.5%)' line (page 1)

Electrical Permit

Verified

Electrical work in Haxtun is inspected by the Colorado State Electrical Board (DORA), not the Town's own inspector, per the Town's own permit application instructions. The Town's Building Permit Application still collects an Electric Tap Fee as the municipal utility provider, and HMC § 150.11 adopts the 2023 NEC as the applicable code, but inspection authority for electrical work rests with the State.

Verified 2026-07-06 · Source

Requirements

  • All new electrical installations and electrical improvements must be inspected by a State of Colorado inspector (State Electrical Board) before electricity can be supplied — per the Town's own Building Permit Application form
  • Allow up to 3 days for the state electrical inspection to be completed
  • Governed by the 2023 NEC as locally adopted, HMC § 150.11
  • If a new electric tap or service is involved, the Town's own Electric Tap Fee ($1,000 normal residential 200-Amp service) or Upgrade Electric Fee ($500 for overhead-to-underground conversion) applies as the municipal utility provider, separate from the state inspection process

Required documents

  • RequiredApplication for Building Permit (Town of Haxtun)Same combined form; electrical tap/upgrade fees noted in the 'Additional Requirements' section

Fee schedule

Fee typeAmountNotes
Electric Tap Fee (normal residential single-phase 200-Amp service)$2,000.00
Town of Haxtun Application for Building Permit (2025 edition), Additional Requirements, p. Show full citation

Town of Haxtun Application for Building Permit (2025 edition), Additional Requirements, p. 2 — normal residential single-phase 200-Amp service tap at $2,000.00. The applicant is charged time and materials for electrical needs above the normal service. The $1,000.00 previously recorded is the figure in the Town's 2024 edition, which remains live and is still linked from the Building Department page; the Permits and Applications page links the 2025 edition.

Upgrade Electric Fee (overhead to underground 200-Amp conversion)$1,000.00
Town of Haxtun Application for Building Permit (2025 edition), Additional Requirements, p. Show full citation

Town of Haxtun Application for Building Permit (2025 edition), Additional Requirements, p. 2 — customers with existing overhead service may request a new 200-Amp underground service for $1,000.00 to cover materials; Town labour for installation is provided at no cost. The $500.00 previously recorded is the figure in the Town's 2024 edition, which remains live and is still linked from the Building Department page; the Permits and Applications page links the 2025 edition.

Plumbing Permit

Required for plumbing installation, alteration, or repair in Haxtun. Governed by the 2021 International Plumbing Code (IPC) as locally adopted and amended (HMC § 150.10, Ord. 2025-1). Unlike electrical work, the Town's own permit application does not direct plumbing to a state inspector — plumbing is reviewed/inspected under the Town's own adopted code and validated by the Town's Building Inspector.

Reviewed 2026-07-06 · Source

Requirements

  • Governed by the 2021 IPC as locally amended by HMC § 150.10: sewer depth requirement filled in at 12 inches (amended from a blank template value), first paragraph of drainage/vent air test (IPC 312.3) deleted, roof extension minimum set at 12 inches, reclaimed water systems (IPC 1304) deleted entirely
  • Water Tap Fee ($2,000 normal residential 3/4-inch) and Sewer Tap Fee ($2,000 normal residential 4-inch) apply as separate municipal utility charges when a new tap is required, in addition to the plumbing/building permit fee
  • Plumbing contractors must hold applicable Colorado State Plumbing Board (DORA) licensure per general state law

Required documents

  • RequiredApplication for Building Permit (Town of Haxtun)Same combined form; water/sewer tap fees noted in the 'Additional Requirements' section

Fee schedule

Fee typeAmountNotes
Water Tap Fee (normal residential 3/4-inch)$2,000.001-inch and larger taps include tap fee plus cost of larger pipe and meter
Sewer Tap Fee (normal residential 4-inch)$2,000.00Larger sewer taps include tap fee plus cost of additional material
Building Permit Fee (valuation-based, same schedule as general building permit)$10.00-$25.00 base, plus $5.00 per $1,000 above $2,500 valuationPlumbing work is not billed under a separate standalone fee line on the Town's form; it is captured within the general permit valuation and applicable tap fees

Mechanical / HVAC Permit

Verified

Required for mechanical/HVAC equipment installation or replacement in Haxtun. Governed by the 2018 International Mechanical Code (IMC), HMC § 150.03, and the 2018 International Fuel Gas Code (IFGC), HMC § 150.04, both adopted/amended by Ord. 2025-1.

Verified 2026-07-06 · Source

Requirements

  • Governed by the 2018 IMC (HMC § 150.03) and 2018 IFGC (HMC § 150.04) as locally amended
  • IFGC 404.12 (minimum burial depth) amended: all plastic fuel gas piping must be installed at least 18 inches below grade
  • IFGC 406.4.1/406.4.2 (test pressure/duration) amended: test pressure raised to 10 psig; test duration for systems under 10 cubic feet or in single-family dwellings is not less than 15 minutes
  • Same 180-day permit expiration / investigation-fee / refund amendments as the other HMC Chapter 150 codes apply

Required documents

  • RequiredApplication for Building Permit (Town of Haxtun)Same combined form used for all building-related permits

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $0 to $1,000$10.00Town of Haxtun Application for Building Permit (2025 edition), Permit Fees table, p. 1 — $0–$1,000 at $10.00, $1,001–$2,500 at $25.00, and $2,501 and up at $25.00 plus $5.00 per $1,000. Unchanged from the Town's 2024 edition.
Building Permit Fee — valuation $1,001 to $2,500$25.00Town of Haxtun Application for Building Permit (2025 edition), Permit Fees table, p. 1 — $0–$1,000 at $10.00, $1,001–$2,500 at $25.00, and $2,501 and up at $25.00 plus $5.00 per $1,000. Unchanged from the Town's 2024 edition.
Building Permit Fee — valuation $2,501 and up$25.00 plus $5.00 per $1,000 of valuationTown of Haxtun Application for Building Permit (2025 edition), Permit Fees table, p. 1 — $0–$1,000 at $10.00, $1,001–$2,500 at $25.00, and $2,501 and up at $25.00 plus $5.00 per $1,000. Unchanged from the Town's 2024 edition.
Use Tax4.5% of the valuation of all materials
Town of Haxtun Application for Building Permit (2025 edition), p. Show full citation

Town of Haxtun Application for Building Permit (2025 edition), p. 1 — use tax at 4.5%, shown both as a standalone line and as the “Use Tax (4.5%)” row of the fee worksheet. Unchanged from the Town's 2024 edition. The municipal-code sections this permit type cites carry no dollar figure or rate anywhere in the building chapter.

Re-Roof Permit

Required for re-roofing work in Haxtun under the general Application for Building Permit form. Governed by the 2018 IBC/IRC as locally adopted; Haxtun's completed IRC Climatic and Geographic Design Criteria requires ice barrier underlayment.

Reviewed 2026-07-06 · Source

Requirements

  • Reviewed under the 2018 IBC/IRC as locally amended
  • Ice Barrier Underlayment Required per the Town's completed IRC Table R301.2(1) Climatic and Geographic Design Criteria
  • Application for Building Permit form, Section 2 (Alteration or Addition to Existing Property), with plat map/sketch showing the property

Required documents

  • RequiredApplication for Building Permit (Town of Haxtun) — Section 2Same combined form used for alterations

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, general schedule)$10.00-$25.00 base, plus $5.00 per $1,000 above $2,500 valuationNo standalone flat re-roof fee is published; billed under the general valuation-based schedule
Use Tax4.5% of the valuation of all materialsTown of Haxtun Application for Building Permit, 'Permit Fees' table and fee worksheet 'Use Tax (4.5%)' line (page 1)

Rooftop Solar Photovoltaic Permit

Verified

Required for rooftop solar PV installations in Haxtun. Electrical connection work is subject to the State of Colorado electrical inspection process described under the Electrical Permit type; the installation itself is governed by the Colorado Model Electric Ready and Solar Ready Code (HMC § 150.09, adopted June 1, 2023 edition, via Ord. 2025-1) plus the 2023 NEC (HMC § 150.11).

Verified 2026-07-20 · Source

Requirements

  • Governed by the Colorado Model Electric Ready and Solar Ready Code, dated June 1, 2023 (HMC § 150.09), and the 2023 NEC (HMC § 150.11)
  • Electrical connection portions of a solar PV installation are inspected by a State of Colorado inspector, not the Town, per the Town's own permit application instructions
  • Application for Building Permit form required; plat map/sketch showing panel/array location on the property

Required documents

  • RequiredApplication for Building Permit (Town of Haxtun)Same combined form used for all building-related permits

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, general schedule)$10.00-$25.00 base, plus $5.00 per $1,000 above $2,500 valuation
No standalone flat solar-PV fee is published; Show full citation

No standalone flat solar-PV fee is published; billed under the general valuation-based schedule. The Town's 'Application for Building Permit' PDF contains no dedicated solar/photovoltaic fee line — the general valuation table is the current, applicable figure for a solar PV permit in Haxtun. Haxtun does not appear on SolarAPP+'s Colorado participant list (gosolarapp.org/landing-pages/solarapp-colorado — only Bennett, Wheat Ridge, Denver, Alamosa County, and Gilpin County offer full SolarAPP+ plan review), and Colorado's statewide solar-permit fee cap (C.R.S. 24-48.5-113) caps aggregate solar fees at $500 residential/$1,000 nonresidential — Haxtun's general valuation-based fee for a typical residential solar install falls well under that statutory ceiling, consistent with the town's own published table.

Use Tax4.5% of the valuation of all materials
Town of Haxtun Application for Building Permit (2025 edition), p. Show full citation

Town of Haxtun Application for Building Permit (2025 edition), p. 1 — use tax at 4.5%, shown both as a standalone line and as the “Use Tax (4.5%)” row of the fee worksheet. Unchanged from the Town's 2024 edition. The municipal-code sections this permit type cites carry no dollar figure or rate anywhere in the building chapter.

Demolition Permit

Demolition of a dangerous or existing building in Haxtun is addressed through the Uniform Code for the Abatement of Dangerous Buildings (1991 Edition, HMC § 150.06) for unsafe structures, and through the general Application for Building Permit process for a voluntary/planned demolition.

Reviewed 2026-07-06 · Source

Requirements

  • Structures found to endanger life, limb, health, safety, or welfare are subject to the Uniform Code for the Abatement of Dangerous Buildings (HMC § 150.06), which provides a process for required repair, vacation, or demolition
  • In case of conflict between the Dangerous Building Code and any other specific municipal code provision, the specific municipal code provision prevails (HMC § 150.06(B))
  • General demolition (non-dangerous-building) still requires an Application for Building Permit

Required documents

  • RequiredApplication for Building Permit (Town of Haxtun)Same combined form used for all building-related permits

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, general schedule)$10.00-$25.00 base, plus $5.00 per $1,000 above $2,500 valuationNo standalone flat demolition fee is published; billed under the general valuation-based schedule

EV Charger / EVSE Permit

Verified

Haxtun has no dedicated EV charger or EVSE permit and no distinct fee line item for electric vehicle charging equipment. An EV charger installation is billed under the Town's general valuation-based Application for Building Permit (the same combined form and fee table used for all building-related work, including the rooftop solar PV permit's structural scope), and the electrical/circuit work must be inspected by a State of Colorado electrical inspector rather than the Town, exactly as with any other new electrical installation. Colorado's HB24-1173 (Electric Vehicle Charging System Permits, 2024) requires expedited EV-charger permitting only for counties with 20,000+ population and municipalities with 10,000+ population -- Haxtun (population under 1,000) falls well below that threshold and is not a covered municipality under the statute.

Verified 2026-07-20 · Source

Requirements

  • Application for Building Permit (Town of Haxtun) required for the installation, using the general valuation-based fee schedule -- no dedicated EV/EVSE fee line exists
  • All new electrical installations and electrical improvements, including EV charger circuits, must be inspected by a State of Colorado electrical inspector before electricity can be supplied -- allow up to 3 days for that inspection, per the Town's own permit application instructions
  • Haxtun is below the population thresholds (10,000 for municipalities) set by Colorado HB24-1173, so the statute's mandatory model-code/expedited-review requirement for EV charger permits does not apply here
  • Permit holders must call UNCC (811) for all utility locates before work begins

Required documents

  • RequiredApplication for Building Permit (Town of Haxtun)Same combined form used for all building-related permits; valuation-based fee, no dedicated EV/EVSE line

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, general schedule) -- $0-$1,000 valuation$10.00Town of Haxtun Application for Building Permit (PDF); no standalone EV/EVSE fee line exists — the form contains no dedicated electric-vehicle/charging fee item
Building Permit Fee (valuation-based, general schedule) -- $1,001-$2,500 valuation$25.00Town of Haxtun Application for Building Permit (live PDF)
Building Permit Fee (valuation-based, general schedule) -- $2,501 and up$25.00 plus $5.00 per $1,000Town of Haxtun Application for Building Permit (live PDF)
Use Tax4.5% of the valuation of all materialsTown of Haxtun Application for Building Permit (live PDF)

Commercial Building Permit

Verified

Commercial/business construction in Haxtun is fully permitted — the Town adopted the 2018 International Building Code, Chapters 1-35 plus Appendices C, E, H, I & J, as its Building Code (HMC § 150.01, Ord. 2025-1, passed 10-6-2025; confirmed live in the 2026 S-1 code supplement) — but there is NO separate commercial permit process, application, or fee schedule. Commercial projects use the exact same single-page 'Application for Building Permit' form, the same flat valuation-based fee table, and the same 3-working-day processing commitment as residential work. Tenant improvements/commercial alterations likewise have no distinct permit type: they are filed under Section 2 (Alteration or Addition to Existing Property) of the same form, reviewed under the 2018 IBC and the 2018 International Existing Building Code (HMC § 150.07). This undifferentiated single-track process is a confirmed fact from the Town's own live form and code, not a documentation gap.

Verified 2026-08-02 · Source

Requirements

  • Reviewed under the 2018 IBC as locally amended by HMC § 150.01 (Ord. 2025-1) — per the 2026 S-1 supplement of the Haxtun Code of Ordinances
  • Same single 'Application for Building Permit' form as residential: work proposed, type of construction, size/height, number of stories, estimated material cost; Section 1 for a new building, Section 2 for alteration/addition (tenant improvement) scopes
  • Plat map of the project on an 8.5 x 11 sheet showing footages from boundaries and type of construction
  • Commercial-relevant local IBC amendments (HMC § 150.01(B)): corridor fire-resistance rating for R occupancies with a sprinkler system raised from 0.5-hour to 1-hour (Table 1020.1); all public restrooms require a baby changing station (IBC 1109.1.1 as amended); area wells/stair wells/window wells/light wells within 36 inches of a walking surface and deeper than 30 inches must be guarded (IBC 1015.2 as amended); carbon monoxide detection in dwelling units within 15 feet of each sleeping area and on every level (IBC 915.2.1 as amended); flood hazard areas established per the 2/19/1987 FIRM (IBC 1612.3 as amended)
  • Commercial energy compliance: 2021 IECC applies (HMC § 150.08), with the Total Building Performance option (C407) deleted and replaced by required compliance with ASHRAE 90.1 Appendix G
  • All new electrical installations must be inspected by a State of Colorado inspector (1-800-955-5770) before electricity can be supplied — allow up to 3 days; the Town does not run its own electrical inspection program
  • Grading work under IBC Appendix J: plan review and grading permit fees are set by Board of Trustees resolution (HMC § 150.01(B)(15), adding sections J112-J113), and the Town may require a performance guarantee (bond, letter of credit, or cash escrow)
  • Permit holders must call UNCC (811) for all utility locates; large construction projects require the contractor to rent a roll-off dumpster for trash disposal

Required documents

  • RequiredApplication for Building Permit (Town of Haxtun)The same single combined form used for all building work in Haxtun — no commercial-specific application exists (confirmed 2026-08-02: the Town's Building Department and Permits and Applications pages list only this one building form). Validated and signed by the Town of Haxtun Building Inspector to become a permit.
  • RequiredPlat Map / Site Sketch8.5 x 11 sheet showing footages from property boundaries and the type of construction to be performed

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation $0 to $1,000$10.00Same flat/incremental table as residential — no separate commercial fee schedule exists, per the Town's Application for Building Permit PDF
Building Permit Fee — valuation $1,001 to $2,500$25.00Town of Haxtun Application for Building Permit, 'Permit Fees' table (page 1)
Building Permit Fee — valuation $2,501 and up$25.00 plus $5.00 per $1,000 of valuationTown of Haxtun Application for Building Permit, 'Permit Fees' table (page 1)
Use Tax4.5% of the valuation of all materialsTown of Haxtun Application for Building Permit, 'Permit Fees' table and fee worksheet 'Use Tax (4.5%)' line (page 1)
Grading plan review / grading permit fees (if IBC Appendix J grading is involved)Set by Board of Trustees resolutionHMC § 150.01(B)(15) adds IBC Appendix J sections J112 (fees per adopted fee schedule) and J113 (performance guarantees); no dollar figures are published in the code itself
Utility tap fees (if new water/sewer/electric service is required)Water $2,000 (3/4-inch residential-normal), Sewer $2,000 (4-inch), Electric $2,000 (single-phase 200-Amp)
Town of Haxtun Application for Building Permit (2025 edition), Additional Requirements, p. Show full citation

Town of Haxtun Application for Building Permit (2025 edition), Additional Requirements, p. 2 — water $2,000.00 for a normal residential 3/4-inch tap, sewer $2,000.00 for a 4-inch tap, electric $2,000.00 for a single-phase 200-Amp service tap. Larger taps add the cost of the larger pipe, meter or additional material. The $1,000 electric figure previously recorded is the figure in the Town's 2024 edition, which remains live and is still linked from the Building Department page; the Permits and Applications page links the 2025 edition.

Sign Permit

Haxtun is a small statutory Town (population roughly 900) in Phillips County. No dedicated sign-permit page, sign code chapter, or fee schedule distinct from the general Building Permit process was located on the Town's website as of the last verification (townofhaxtun.colorado.gov); the Town's Municipal Code is hosted on American Legal Publishing's codelibrary.amlegal.com. Building permits, which would presumably cover most sign installations, are administered by the Town's Building Department at 145 S. Colorado Ave.

Reviewed 2026-08-13 · Source

Requirements

  • No dedicated sign-permit page, sign code chapter, or fee schedule distinct from the general Building Permit process was located on the Town's website as of the last verification
  • Contact the Town of Haxtun Building Department (970-774-6104) to confirm whether a sign permit is required for a specific sign and what standards apply
  • No numeric sign-permit fee schedule or review-timeline figure was found published on the Town's website as of the last verification

Required documents

  • RequiredSign Permit ApplicationContact the Town Building Department to confirm the current application form and requirements

Fee schedule

Fee typeAmountNotes
Sign Permit FeeNot published as a numeric figure on the Town's websiteContact the Town of Haxtun Building Department (970-774-6104) for a current fee quote

Fire Sprinkler / Fire Alarm System Permit

Fire protection for the Town of Haxtun is provided by the Haxtun Volunteer Fire Department (101 W Strohm St, 970-774-6105), which operates as part of the Holyoke Fire Protection District — a special district supporting the Amherst, Holyoke, Sandhills, and Wages volunteer fire departments across Phillips County's rural areas, dispatched via the Phillips County Communications Center. No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure was located on either the Town's or the fire department's published materials as of the last verification.

Reviewed 2026-08-13 · Source

Requirements

  • Fire protection for Haxtun is provided by the Haxtun Volunteer Fire Department, operating within the Holyoke Fire Protection District structure covering rural Phillips County
  • No dedicated fire-sprinkler/alarm permit application, fee schedule, or review-timeline figure was located on the Town's or fire department's published materials as of the last verification
  • In Colorado, a final Certificate of Occupancy is generally contingent on satisfying all local departments with jurisdiction, which may include Fire, in addition to the Building Department
  • Contact the Town Building Department (970-774-6104) or Haxtun Volunteer Fire Department (970-774-6105) directly to confirm current fire-protection-system permitting procedures for a specific project

Required documents

  • RequiredFire Sprinkler/Alarm System PlansContact the Town Building Department or Haxtun Volunteer Fire Department to confirm current submittal requirements

Fee schedule

Fee typeAmountNotes
Fire Sprinkler/Alarm Plan Review & Permit FeeNot published on the Town's or fire department's website as of the last verificationContact the Town Building Department (970-774-6104) or Haxtun Volunteer Fire Department (970-774-6105) for a current fee quote

Change of Use / Change of Occupancy

Verified

Haxtun does not publish a standalone 'Change of Use' or 'Change of Occupancy' permit application — the Town's Building Department page and Building Permit Application form cover general construction permitting. In Colorado, a final Certificate of Occupancy is generally contingent on satisfying all local departments with applicable jurisdiction (which may include Fire, in addition to Building). A use/occupancy change is presumed to be processed through the Town's general Building Permit Application; contact the Building Department to confirm requirements and applicable code edition for a specific project.

Verified 2026-08-13 · Source

Requirements

  • No standalone change-of-use or change-of-occupancy application is published on the Town's website as of the last verification
  • In Colorado, a final Certificate of Occupancy is generally contingent on satisfying all local departments with applicable jurisdiction, which may include Fire, in addition to the Building Department
  • Processed, if at all, through the Town's general Building Permit Application; contact the Building Department (970-774-6104) to confirm requirements for a specific change-of-use project
  • Haxtun Municipal Code § 150.07 adopts the 2018 International Existing Building Code (IEBC), Chapters 1-16, per Ordinance 2025-1 — this edition governs existing-building/change-of-occupancy analysis within the Town

Required documents

  • RequiredBuilding Permit ApplicationStandard Town building permit application; contact the Building Department to confirm requirements for a change-of-use project

Fee schedule

Fee typeAmountNotes
Building Permit Fee (if construction accompanies the change)Not published as a standalone change-of-use fee lineContact the Building Department (970-774-6104) for a current fee quote

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Haxtun building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-08-20)View current record →All versions →