Version history — Montrose, Colorado
This is PermitBase’s own verified record for Montrose, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Montrose’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-21Current record
- Montrose, Colorado — Plumbing / Gas Permit fee record updated: Set by City Council resolution and referred to in the City Regulations Manual; specific dollar amount not located in a currently-live City-hosted document this review → Set by City Council resolution and referred to in the City Regulations Manual; specific dollar amount not published in any currently-live City-hosted document
- 2026-08-17Superseded
- Montrose, Colorado — Residential Building Permit (New Construction) fee record updated: Not resolved — the City's codified Sec. 3-1-1 Fee Schedule PDF (previously hosted at a 2025-effective DocumentCenter link) returns HTTP 404 as of this review, and no Wayback Machine snapshot of that URL exists (checked directly via the CDX API). The Municode-hosted Regulations Manual chapter containing this fee schedule is rendered client-side via JavaScript and did not yield fee-table text through a direct browser-header fetch in this session. → Not resolved — the City's codified Sec. 3-1-1 Fee Schedule PDF (previously hosted at a 2025-effective DocumentCenter link) returns HTTP 404 as of this review, and no Wayback Machine snapshot of that URL exists (checked directly via the CDX API). The Municode-hosted Regulations Manual chapter containing this fee schedule is rendered client-side via JavaScript and did not yield fee-table text through a direct browser-header fetch in this review.
- Montrose, Colorado — Residential Building Permit (New Construction) fee record updated: Not published as a specific dollar figure in any City-hosted document retrieved this session → Not published as a specific dollar figure in any City-hosted document retrieved this review
- Montrose, Colorado — Plumbing / Gas Permit fee record updated: Set by City Council resolution and referred to in the City Regulations Manual; specific dollar amount not located in a currently-live City-hosted document this session → Set by City Council resolution and referred to in the City Regulations Manual; specific dollar amount not located in a currently-live City-hosted document this review
- Montrose, Colorado — Commercial Building Permit fee record updated: Not resolved — the application form collects 'Total Cost of Project' (indicating a valuation-based fee), but the City's codified Sec. 3-1-1 Fee Schedule remains unrecoverable as of this review: the previously-published DocumentCenter fee-schedule PDF still 404s, the Municode-hosted Regulations Manual returned HTTP 403 to a direct fetch this session, and no alternate City-hosted fee table surfaced in fresh searches → Not resolved — the application form collects 'Total Cost of Project' (indicating a valuation-based fee), but the City's codified Sec. 3-1-1 Fee Schedule remains unrecoverable as of this review: the previously-published DocumentCenter fee-schedule PDF still 404s, the Municode-hosted Regulations Manual returned HTTP 403 to a direct fetch this review, and no alternate City-hosted fee table surfaced in fresh searches
- Montrose, Colorado — fee schedule re-verified across 5 permit types
- 2026-08-14Superseded
- Montrose, Colorado — Sign Permit record added
- Montrose, Colorado — Fire Sprinkler / Fire Alarm System Permit record added
- Montrose, Colorado — Change of Use / Change of Occupancy record added
- 2026-08-02Superseded
- Montrose, Colorado — Commercial Building Permit record added
- 2026-07-20Superseded
- Montrose, Colorado — Electric Vehicle (EV) Charger Permit fee record added: State of Colorado Electrical Permit fee — 'All other electrical fees' (valuation-based, applies to an EV charger circuit retrofit) (Not more than $2,000 valuation: $115.00 (state base figure, effective April 1, 2016); $2,001 and above: $115 plus $5.75 per $1,000 (or fraction) of total valuation, plus $115)
- Montrose, Colorado — Electric Vehicle (EV) Charger Permit fee record removed: State of Colorado Electrical Permit fee
- Montrose, Colorado — Electric Vehicle (EV) Charger Permit record added
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Montrose began