Skip to main content
PermitBase

Montrose building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Montrose, Colorado.

Last verified 2026-08-17 · Source · Embed this page’s badge · Version history

Building department

Address
City Hall, 400 E Main Street, P.O. Box 790, Montrose, CO 81402
Phone
970-252-4707
Office hours
Monday - Thursday, 8 a.m. - 6 p.m. (City Hall hours, per Building Services page). Inspection scheduling: 970-240-1445, inspection hours 9:00-11:00 a.m. and 1:30-3:30 p.m., with 24-hour advance notice required per the City's Residential/Accessory/Commercial Construction packets.

Inspection guide

See how inspections work in Montrose — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC) — City of Montrose Building Services page, adopted per Section 4-1-1 of the City of Montrose Municipal Code
  • 2018 International Residential Code (IRC)
  • 2018 International Fuel Gas Code (IFGC)
  • 2018 International Uniform/Mechanical Code (IMC) (City page lists this as '2018 International Uniform/Mechanical Code')
  • 2018 International Uniform/Plumbing Code (IPC) (City page lists this as '2018 International Uniform/Plumbing Code')
  • 2018 International Energy Conservation Code (IECC)
  • 2023 National Electrical Code (NEC) — note: electrical permitting and inspection itself is performed by the State of Colorado Electrical Board (DORA), not the City, per the City's own Residential/Accessory/Commercial Construction and Solar Permit packets
  • Deletions, modifications, and exceptions to the above codes are codified in Section 4-1-3 of the City of Montrose Municipal Code; full building regulations are in Title IV (Chapter 1 - Building Regulations, Chapter 4-9 -… Show full text

    Deletions, modifications, and exceptions to the above codes are codified in Section 4-1-3 of the City of Montrose Municipal Code; full building regulations are in Title IV (Chapter 1 - Building Regulations, Chapter 4-9 - Housing Code, Chapter 11-13 - Mobile Home/Travel Home/Tiny Home Regulations, Chapter 11-9 - Outdoor Lighting, Section 4-1-4 - Plumbers and Gasfitters Licenses, Section 4-1-11 - Supplemental Building/Structure/Fence Requirements), per the City of Montrose Municipal Code as indexed on the Building Services page

  • The City references a forthcoming Colorado Wildfire Resiliency Code page (linked from the Building Services page), but the Building Services page itself does not state an adoption/enforcement date for Montrose specifically; it is not asserted as adopted here without that confirmation — see tipsAndGotchas

Permit types & fees

Montrose's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Montrose yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Montrose lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
10units

9 buildings · $1.7M valuation

Trailing 12 months
173units

12 of 12 months reported · #24 in Colorado coverage by units

Year to date (2026 YTD through 2026-07)
78units

68 buildings · $12M valuation

7 month(s) reported to Census

Full year 2025
165units

101 buildings · $29.3M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Montrose is a home-rule city with its OWN Building Services division (part of Community Development/Planning Services, City Hall, 400 E Main Street) — Montrose County operates a physically distinct Building Division at 63160 Lasalle Road with its own staff and phone line. Confirm jurisdiction if a parcel is near the city boundary.
  • The City of Montrose does not inspect electrical work. All electrical inspections are performed by the State of Colorado Electrical Board (DORA). The City's own packets list two different numbers for it — (855) 454-0065 on the Residential/Accessory/Commercial packets and 855-451-9792 on the Commercial/Solar packets — so try both if the first does not connect. A final electrical inspection form from the State must be on site before the City will issue a Certificate of Occupancy, so schedule the state inspection well ahead of your CO date.
  • The City's base valuation-based building permit fee schedule is not currently published: the previously-published 'Sec. 3-1-1 Fee Schedule' PDF now returns 404 on the City's own DocumentCenter, no archived copy of that URL exists, and the Municode-hosted Regulations Manual chapter does not expose the schedule. Only flat fees for standalone permit types are published: Roofing $50, Solar $50, Demolition $50, Fence $10 — all sourced directly from the City's own standalone application PDFs. Confirm the base Building Permit Fee directly with Building Services (970-252-4707) before quoting a client.
  • Beginning January 1, 2027, all building-related permit applications move to Cloudpermit (online); as of the last verification, applications are still submitted by emailing a completed PDF to buildingservices@ci.montrose.co.us.
  • Montrose adopts the 2018 I-Codes (IBC/IRC/IFGC/IMC/IPC/IECC) plus the 2023 NEC. That is an older I-Code cycle than the 2021 and 2024 editions now in wide circulation, so verify design compliance against the 2018 editions for Montrose specifically rather than the newest published code.
  • Plumbing/gas and mechanical/HVAC work do not have their own standalone permit application forms in Montrose — both are captured via checkboxes on the same Residential or Commercial Building Permit Application, unlike jurisdictions that issue separate trade-specific permit paperwork.
  • No general review-timeline commitment (e.g., 'X business days') is published anywhere on the City's Building Services page, Licenses & Permits page, or any permit-specific PDF — every permit type in this jurisdiction accordingly has a null reviewTimelineDays, a stricter case than Durango (which at least publishes one general 30-business-day figure) or Golden (which publishes a granular table).
  • An investigation fee applies if construction starts before the permit is issued (flagged on every application form), but the City does not publish the dollar amount.
  • Mobile/manufactured home installations follow an entirely separate process (Manufactured Home Permit Application plus a State of Colorado DOLA Installation Authorization Form and a City Clerk Transportation Authorization Letter) — not modeled as one of the standard permitTypes in this record since it is a distinct installation-and-titling process rather than a standard construction/trade permit.

Comparable nearby cities

Cañon City
13 shared permit typesBoth on the 2018 International Fuel Gas Code (IFGC)
Compare fees →
Craig
13 shared permit typesBoth on the 2018 International Residential Code (IRC)
Compare fees →
Firestone
13 shared permit typesBoth on the 2018 International Fuel Gas Code (IFGC)
Compare fees →