Electric Vehicle (EV) Charger Permit — Montrose, Colorado · Requirements sheet
Verified 2026-07-20 · Source: https://www.cityofmontrose.org/270/Building-Services
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Electric Vehicle (EV) Charger Permit in Montrose, Colorado
Montrose has no separate City electrical permit process at all — as documented on the Solar PV Permit entry, electrical work (including any new circuit or panel/service upgrade) is permitted through the State of Colorado, Division of Professions and Occupations (Electrical and Plumbing Permits), not the City of Montrose. A residential EV charger circuit therefore follows that same state electrical-permit path. Separately, for commercial/non-residential EV charging stations, City of Montrose staff stated at an October 20, 2025 City Council work session that the City's existing zoning code — which treats EV charging stations as a standalone use in most commercial districts and an accessory use in all non-residential districts, reviewed through the streamlined Minor Site Development Review process (no public hearing) — already satisfies Colorado HB24-1173's EV-charging-permit mandate for municipalities of Montrose's population (over the 10,000 threshold), so staff recommended against adopting the state's model EV charging code or new ordinance language.
Verified 2026-07-20 · Source
When you need this permit
- Residential: a new circuit, outlet, or panel/service upgrade to serve an EV charger requires a State of Colorado electrical permit (Division of Professions and Occupations), not a City of Montrose permit — same routing as the electrical scope of a solar PV installation in this jurisdiction
- Commercial/non-residential: EV charging stations are a standalone permitted use in most commercial zoning districts and an accessory use in all non-residential districts, reviewed via the City's Minor Site Development Review process (administrative, no public hearing)
- Montrose (population over 10,000) is subject to Colorado HB24-1173, which required covered municipalities to adopt or confirm a streamlined EV-charging permit process by December 31, 2025; City staff's position (per the Oct. 20, 2025 Council work session) is that Montrose's existing Minor Site Development Review process already meets that requirement without a new ordinance
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
State of Colorado Electrical Permit Fees schedule (base figures effective April 1, 2016, per C.R.S. Show full citationHide
State of Colorado Electrical Permit Fees schedule (base figures effective April 1, 2016, per C.R.S. § 12-23-117), issued directly by the State of Colorado Division of Professions and Occupations rather than the City of Montrose, since Montrose has no separate City electrical permit process. The State Board updates this schedule periodically and its own current page (dpo.colorado.gov/Electrical/PermitsandInspections) publishes no static dollar table (fees are calculated through the online DORA permitting system at time of purchase), so this 2016 base schedule remains the most recent citable published figure — confirm current-year amounts directly with DORA before relying on this for a live application.Review timeline
Inspection process
See the full Montrose inspection guide — scheduling & re-inspection fees →
Tips
- Do not apply to the City of Montrose for a residential EV charger's electrical work — that permit is issued by the State of Colorado, the same as the electrical-interconnection scope of a solar PV installation in this jurisdiction.
- The City's position that its existing Minor Site Development Review process satisfies HB24-1173 was reported via a City Council work-session news item (October 20, 2025); the primary staff report itself is not directly quoted here, so confirm current status directly with City of Montrose Community Development/Planning Services before relying on it for a commercial project.
- Montrose's population is above the 10,000-resident threshold that triggers HB24-1173 coverage, unlike several smaller nearby Colorado jurisdictions in this same wave of research.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Montrose building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Montrose's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Montrose yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Montrose lands. Privacy.
Other permits in Montrose
Electric Vehicle (EV) Charger Permit in other cities
Compare electric vehicle (ev) charger permit fees across Colorado →
Look up this fee in a different city →
Related guides
Now live
Build your Montrose project checklist
Describe your project once and get every permit, document, and fee it triggers in Montrose — in one checklist. Free, for any city and any number of projects.
Get started →