Fence Permit in Montrose, Colorado

Required prior to installation of any fence in Montrose, with a flat $10 permit fee. Height limits and setback requirements vary by zoning district, per Municipal Code Section 4-4-21.

Verified 2026-07-06 · Source

When you need this permit

  • No fence may be installed until a fence permit is approved, per Municipal Code Section 4-4-21(A)(1)
  • Residential districts: fences/free-standing walls may not exceed 4 feet in height within the required front yard setback, or 6 feet elsewhere; an 8-foot fence is allowed in backyards if it does not impede visibility
  • Commercial and industrial districts: fences/walls may not exceed 4 feet within the front yard setback, or 8 feet elsewhere; an additional 2 feet is allowed for barbed wire meeting specified requirements
  • No fence, wall, hedge, or planting may obstruct the view of abutting streets or intersections for motorists/pedestrians
  • Electrically charged fences are allowed only where made inaccessible to persons unaware the fence is electrified
  • Barbed wire is allowed in industrial/commercial districts only at a minimum 8 feet above ground; not allowed elsewhere unless necessary to confine lawfully-kept livestock
  • Temporary construction-site security fences are exempt from standard height requirements
  • Chain-link/open-wire fencing around sports facilities (tennis courts, ball fields, backstops, batting cages, golf courses) is exempt from standard height requirements
  • Zone-specific front/corner setbacks apply: R-1B/R-2/R-5/R-6: 25 ft front / 20 ft corner; R-3/R-3A/R-4/OR/B-2: 15 ft / 15 ft; B-2A/B-3/B-4/I-1/I-2: 25 ft / 25 ft; MHR: 5 ft / 10 ft; Mobile Home Parks: 12 ft / 12 ft
  • Call 811 for a utility locate before digging, per C.R.S. Title 9
  • An Improvement Location Certificate (ILC) from a professional surveyor may be required if fence location is in question

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fence Permit FeeCollected at time of permit issuance (check, cash, or credit card), per the City's Fence Permit Application; the application itself notes the fee 'will be set pursuant to the city regulation manual,' with $10 as the currently stated collection amount on the form
$10.00

Review timeline

Plan review
Not published — contact the department

How long did your Fence Permit permit actually take in Montrose?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    Height, location relative to property line/setback verified

See the full Montrose inspection guide — scheduling & re-inspection fees →

Tips

  • Setback rules vary significantly by zoning district in Montrose — check the zone-specific front/corner setback table (e.g., 25 ft in R-1B/R-2/R-5/R-6 vs. just 5 ft in MHR) before assuming a standard distance applies.
  • An 8-foot backyard fence is allowed in residential zones as long as it doesn't impede visibility — taller than the 6-foot default for non-front-yard areas.
  • Call 811 before any fence-related digging — a statutory requirement under C.R.S. Title 9, flagged directly on the City's own application.

Frequently asked questions

Montrose requires a fence permit for: No fence may be installed until a fence permit is approved, per Municipal Code Section 4-4-21(A)(1); Residential districts: fences/free-standing walls may not exceed 4 feet in height within the required front yard setback, or 6 feet elsewhere; an 8-foot fence is allowed in backyards if it does not impede visibility; Commercial and industrial districts: fences/walls may not exceed 4 feet within the front yard setback, or 8 feet elsewhere; an additional 2 feet is allowed for barbed wire meeting specified requirements; No fence, wall, hedge, or planting may obstruct the view of abutting streets or intersections for motorists/pedestrians; Electrically charged fences are allowed only where made inaccessible to persons unaware the fence is electrified; Barbed wire is allowed in industrial/commercial districts only at a minimum 8 feet above ground; not allowed elsewhere unless necessary to confine lawfully-kept livestock; Temporary construction-site security fences are exempt from standard height requirements; Chain-link/open-wire fencing around sports facilities (tennis courts, ball fields, backstops, batting cages, golf courses) is exempt from standard height requirements; Zone-specific front/corner setbacks apply: R-1B/R-2/R-5/R-6: 25 ft front / 20 ft corner; R-3/R-3A/R-4/OR/B-2: 15 ft / 15 ft; B-2A/B-3/B-4/I-1/I-2: 25 ft / 25 ft; MHR: 5 ft / 10 ft; Mobile Home Parks: 12 ft / 12 ft; Call 811 for a utility locate before digging, per C.R.S. Title 9; An Improvement Location Certificate (ILC) from a professional surveyor may be required if fence location is in question. If your project isn't listed, confirm with City of Montrose Building Services (Community Development / Planning Services) at 970-252-4707 before starting work.

$10.00, collected at the time of permit issuance, per the City's Fence Permit Application.

Montrose does not publish a plan-review timeline for this permit. Contact City of Montrose Building Services (Community Development / Planning Services) at 970-252-4707 for current turnaround.

You'll need: Fence Permit Application; Site Plan. Depending on your project, Montrose may also ask for: Photos. See the required-documents checklist on this page for details on each.

Montrose requires 1 inspection(s) for a fence permit, in order: Final Inspection. Schedule each through City of Montrose Building Services (Community Development / Planning Services) (970-252-4707).

Apply through City of Montrose Building Services (Community Development / Planning Services) at City Hall, 400 E Main Street, P.O. Box 790, Montrose, CO 81402. Phone: 970-252-4707, email: buildingservices@ci.montrose.co.us (permit application submittal); permits@cityofmontrose.us (per search-indexed contact for Building Inspector Timothy Mazur; not independently re-verified against a live City page in this session). Office hours: Monday - Thursday, 8 a.m. - 6 p.m. (City Hall hours, per Building Services page). Inspection scheduling: 970-240-1445, inspection hours 9:00-11:00 a.m. and 1:30-3:30 p.m., with 24-hour advance notice required per the City's Residential/Accessory/Commercial Construction packets.. Official information: https://www.cityofmontrose.org/270/Building-Services.

Montrose, Colorado has adopted: 2018 International Building Code (IBC) — City of Montrose Building Services page, adopted per Section 4-1-1 of the City of Montrose Municipal Code; 2018 International Residential Code (IRC); 2018 International Fuel Gas Code (IFGC); 2018 International Uniform/Mechanical Code (IMC) (City page lists this as '2018 International Uniform/Mechanical Code'); 2018 International Uniform/Plumbing Code (IPC) (City page lists this as '2018 International Uniform/Plumbing Code'); 2018 International Energy Conservation Code (IECC); 2023 National Electrical Code (NEC) — note: electrical permitting and inspection itself is performed by the State of Colorado Electrical Board (DORA), not the City, per the City's own Residential/Accessory/Commercial Construction and Solar Permit packets; Deletions, modifications, and exceptions to the above codes are codified in Section 4-1-3 of the City of Montrose Municipal Code; full building regulations are in Title IV (Chapter 1 - Building Regulations, Chapter 4-9 - Housing Code, Chapter 11-13 - Mobile Home/Travel Home/Tiny Home Regulations, Chapter 11-9 - Outdoor Lighting, Section 4-1-4 - Plumbers and Gasfitters Licenses, Section 4-1-11 - Supplemental Building/Structure/Fence Requirements), per the City of Montrose Municipal Code as indexed on the Building Services page; The City references a forthcoming Colorado Wildfire Resiliency Code page (linked from the Building Services page) but the Building Services page itself does not state an adoption/enforcement date for Montrose specifically in the content retrieved this session; not asserted as adopted here without that confirmation — see tipsAndGotchas. Local amendments apply — see the Montrose overview page for the full list.

Up to 6 feet in most of the yard, or up to 8 feet in the backyard specifically if it does not impede visibility. Within the required front-yard setback, the maximum is 4 feet, per Municipal Code Section 4-4-21.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Montrose building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.