Building department
- Address
- 9950 Park Avenue, Firestone, CO 80504
- Phone
- 303-833-3291
- Office hours
- Monday through Friday, 8 a.m. to 5 p.m. (Town Hall hours); SAFEbuilt Colorado's local office is at 11409 Business Park Circle, Suite 350, Firestone, CO 80504, phone 303-774-1388 (per SAFEbuilt's own site); Firestone-specific SAFEbuilt inspection contact: firestone-building@safebuilt.com / 303-774-0454, and Building Official Tim Moroney, tmoroney@safebuilt.com / 970-545-3555 (per SAFEbuilt/search-indexed contact listing — recommend confirming current staffing directly with the Town before publishing to end users, as this level of detail was not independently re-confirmed on a live SAFEbuilt staff-directory page during this extraction)
- Website
- Official site
- Permit portal
- Apply online at Firestone's portal
Inspection guide
See how inspections work in Firestone — sequence, scheduling & re-inspection fees.
Codes adopted
Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.
- 2018 International Building Code (IBC), adopted by reference and locally amended as the 'Firestone Building and Construction Code' (FBCC) — Town of Firestone Building Guides page, https://firestoneco.gov/294/Building-Guides, and Ordinance No. 1029, https://firestoneco.gov/DocumentCenter/View/9387
- 2018 International Residential Code (IRC), adopted by reference and locally amended
- 2018 International Plumbing Code (IPC)
- 2018 International Mechanical Code (IMC)
- 2018 International Existing Building Code (IEBC)
- 2018 International Fuel Gas Code (IFGC)
- 2018 International Property Maintenance Code (IPMC)
- 2018 International Swimming Pool and Spa Code (ISPSC)
- 2018 International Energy Conservation Code (IECC)
- 2018 International Fire Code (IFC), per Ordinance No. 1029 chapter list (Chapter 15.32)
- 2023 National Electrical Code (NEC), adopted by reference per Ordinance No. 1029 (replacing the previously-adopted 2020 NEC)
- Ordinance No. 1029 (adopted following a June 21, 2023 public hearing) repealed and reenacted Firestone Municipal Code Chapters 15.04 (IBC), 15.06 (IRC), 15.08 (NEC), 15.10 (IEBC), 15.12 (IFGC), 15.14 (IMC), 15.16 (IPC), 15.18 (IPMC), 15.32 (IFC), 15.20 (ISPSC), and 15.36 (IECC) — source PDF, https://firestoneco.gov/DocumentCenter/View/9387/1029-AN-ORDINANCE-OF-THE-BOARD-OF-TRUSTEES-OF-THE-TOWN-OF-FIRESTONE-COLORADO
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family homes and similar new residential construction in Firestone. Reviewed under the 2018 IRC/IBC as locally amended by Ordinance No. 1029 (the 'Firestone Building and Construction Code'). Plan review/permit administration is handled by Town of Firestone Building Division staff; inspections are performed by SAFEbuilt Colorado under contract.
Residential Addition / Remodel Permit
Required for additions, basement finishes, and remodels involving structural changes in Firestone. Reviewed under the 2018 IRC as locally amended. Basement Finish/Remodel and Addition are both explicitly listed among the Town's permits requiring plan review.
Electrical Permit
Required for electrical modifications, service upgrades, and panel/meter work in Firestone. Governed by the 2023 NEC as locally adopted. Residential electrical permits are billed on a distinct area-based fee schedule; several standalone electrical items (temporary construction meter, service replacement, mobile home electrical set) carry flat fees.
Plumbing Permit
Required for plumbing modifications, backflow preventers, water heater replacement, and new gas lines in Firestone. Governed by the 2018 IPC and IFGC as locally adopted.
Mechanical / HVAC Permit
Required for furnace, A/C, and related HVAC equipment installation or replacement in Firestone. Governed by the 2018 IMC and IFGC as locally adopted.
Roofing Permit (Reroof)
Required for re-roofing in Firestone. Governed by 2018 IRC roofing provisions with a dedicated Town-published Reroof Requirements guide (REV 8.11.23) covering asphalt shingle re-roofing specifics.
Solar PV Permit
Required for solar panel installation in Firestone. Governed by the 2018 IBC/IRC and 2023 NEC as locally adopted. The Town publishes a dedicated 'PV Solar Detach-Reset Process' guide for re-roofing under existing solar arrays, and solar installs carry a capped electrical permit fee distinct from the general residential electrical fee table.
Demolition Permit
Required for residential demolition in Firestone, listed as a distinct flat-fee permit item on the Town's Building Division Fee Schedule.
Fence Permit
Required for residential fences under 6 feet in Firestone, listed as a distinct flat-fee permit item. No published guide or fee was found specifically for retaining walls, so this entry is scoped to fences only, per the genuinely-sourced fee schedule line item.
EV Charger / Energy Storage System (ESS) Permit
Firestone publishes a dedicated 'Firestone Single Family EV Car Charger and/or Energy Storage System' requirements guide (Rev 3.26.2024), distinct from its general Building Guides. New residential EV charging systems and/or energy storage systems use an 'RES inspection type' for all inspections, with specific plan-review submittal items, a 2023-code local amendment requiring a heat detector interconnected to the home's smoke detector system when an attached garage has an EV charger (per NFPA 70 Article 625), and detailed ESS placement/energy-rating rules (IRC Section R327, locally amended). Billed under the same area-based Residential Electrical Permit fee table documented in the electrical-permit entry — no distinct EV/ESS fee line was found on the Fee Schedule.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 6units
6 buildings · $2.9M valuation
- Trailing 12 months
- 173units
12 of 12 months reported · #21 in Colorado coverage by units
- Year to date (2026 YTD through 2026-05)
- 75units
75 buildings · $32.7M valuation
5 month(s) reported to Census
- Full year 2025
- 119units
119 buildings · $58.9M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity
Tips & gotchas
- Firestone splits its Building Division across two organizations: Town of Firestone staff handle permit intake/administration/plan review coordination, while SAFEbuilt Colorado (contracted) performs building inspections — know which to contact for which step of the process.
- Permits expire if work is not commenced within 180 days of issuance, if a required inspection is not requested within 180 days, or if 180 days lapse after a required inspection without a follow-up inspection/approval — and expire outright after 2 years regardless, unless the Building Official grants a written extension requested before expiration.
- Starting work before pulling a permit doubles the normal permit fee (plus a separate investigation fee) under Ordinance No. 1029 — always get the permit first.
- Firestone's electrical fees are indexed to the Denver-Aurora-Lakewood CPI and adjust annually under Colorado HB 19-1035 — always confirm current-year dollar amounts rather than relying on a prior year's published schedule.
- The Town's residential Building Guides (Basement Finish, Detached Garage, Enclosed Patio, One-Story Addition, Patio Covers/Carports, Pole Barn, Uncovered Decks) are generic Colorado Chapter ICC templates, not Firestone-specific requirement documents beyond the code edition reference — check the actual Firestone Municipal Code / Ordinance 1029 amendments for binding local rules, and confirm specifics with the Building Division for anything the generic template doesn't address.
- Multi-family and all commercial projects require separate approval from the Frederick-Firestone Fire Protection District (303-833-2742) in addition to Town Building Division review.