Skip to main content
PermitBase

Firestone building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Firestone, Colorado.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
9950 Park Avenue, Firestone, CO 80504
Phone
303-833-3291
Office hours
Monday through Friday, 8 a.m. to 5 p.m. (Town Hall hours); SAFEbuilt Colorado's local office is at 11409 Business Park Circle, Suite 350, Firestone, CO 80504, phone 303-774-1388 (per SAFEbuilt's own site); Firestone-specific SAFEbuilt inspection contact: firestone-building@safebuilt.com / 303-774-0454, and Building Official Tim Moroney, tmoroney@safebuilt.com / 970-545-3555 (per SAFEbuilt/search-indexed contact listing — recommend confirming current staffing directly with the Town before publishing to end users, as this level of detail was not independently re-confirmed on a live SAFEbuilt staff-directory page during this extraction)

Inspection guide

See how inspections work in Firestone — sequence, scheduling & re-inspection fees.

Codes adopted

Colorado has no statewide-mandated building code edition. Under the Colorado Constitution's home-rule provisions (art. XX, home rule for municipalities since 1902; home rule for counties since 1970), building codes and zoning are an enumerated home-rule charter power, so cities and counties adopt and amend their own construction codes independently — predominantly the I-Codes, with editions and local amendments varying by jurisdiction. The one statewide floor is for energy: HB22-1362 (2022) created the Energy Code Board (jointly appointed by the Colorado Energy Office and the Department of Local Affairs) and requires that, on or after July 1, 2023 and before July 1, 2026, any municipality or county that adopts or updates a building code must adopt and enforce an energy code achieving performance equivalent to or better than the 2021 IECC together with the board's Model Electric Ready and Solar Ready Code (which includes electric-ready, EV-ready, and solar-ready provisions); from July 1, 2026 onward the floor shifts to the board's Model Low Energy and Carbon Code or an equivalent. Electrical and plumbing permitting defaults to the Colorado State Electrical Board and State Plumbing Board (within DORA's Division of Professions and Occupations) — the state issues permits and inspects statewide except in counties/jurisdictions that operate their own certified Electrical or Plumbing Inspection Program, in which case the local program has authority instead. Always confirm the currently adopted code edition, local amendments, and inspection authority (state board vs. local program) with the specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC), adopted by reference and locally amended as the 'Firestone Building and Construction Code' (FBCC) — Town of Firestone Building Guides page, https://firestoneco.gov/294/Building-Guides, and Ordinance No. 1029, https://firestoneco.gov/DocumentCenter/View/9387
  • 2018 International Residential Code (IRC), adopted by reference and locally amended
  • 2018 International Plumbing Code (IPC)
  • 2018 International Mechanical Code (IMC)
  • 2018 International Existing Building Code (IEBC)
  • 2018 International Fuel Gas Code (IFGC)
  • 2018 International Property Maintenance Code (IPMC)
  • 2018 International Swimming Pool and Spa Code (ISPSC)
  • 2018 International Energy Conservation Code (IECC)
  • 2018 International Fire Code (IFC), per Ordinance No. 1029 chapter list (Chapter 15.32)
  • 2023 National Electrical Code (NEC), adopted by reference per Ordinance No. 1029 (replacing the previously-adopted 2020 NEC)
  • Ordinance No. 1029 (adopted following a June 21, 2023 public hearing) repealed and reenacted Firestone Municipal Code Chapters 15.04 (IBC), 15.06 (IRC), 15.08 (NEC), 15.10 (IEBC), 15.12 (IFGC), 15.14 (IMC), 15.16 (IPC), 15.18 (IPMC), 15.32 (IFC), 15.20 (ISPSC), and 15.36 (IECC) — source PDF, https://firestoneco.gov/DocumentCenter/View/9387/1029-AN-ORDINANCE-OF-THE-BOARD-OF-TRUSTEES-OF-THE-TOWN-OF-FIRESTONE-COLORADO

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
6units

6 buildings · $2.9M valuation

Trailing 12 months
173units

12 of 12 months reported · #21 in Colorado coverage by units

Year to date (2026 YTD through 2026-05)
75units

75 buildings · $32.7M valuation

5 month(s) reported to Census

Full year 2025
119units

119 buildings · $58.9M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Colorado building activity

Tips & gotchas

  • Firestone splits its Building Division across two organizations: Town of Firestone staff handle permit intake/administration/plan review coordination, while SAFEbuilt Colorado (contracted) performs building inspections — know which to contact for which step of the process.
  • Permits expire if work is not commenced within 180 days of issuance, if a required inspection is not requested within 180 days, or if 180 days lapse after a required inspection without a follow-up inspection/approval — and expire outright after 2 years regardless, unless the Building Official grants a written extension requested before expiration.
  • Starting work before pulling a permit doubles the normal permit fee (plus a separate investigation fee) under Ordinance No. 1029 — always get the permit first.
  • Firestone's electrical fees are indexed to the Denver-Aurora-Lakewood CPI and adjust annually under Colorado HB 19-1035 — always confirm current-year dollar amounts rather than relying on a prior year's published schedule.
  • The Town's residential Building Guides (Basement Finish, Detached Garage, Enclosed Patio, One-Story Addition, Patio Covers/Carports, Pole Barn, Uncovered Decks) are generic Colorado Chapter ICC templates, not Firestone-specific requirement documents beyond the code edition reference — check the actual Firestone Municipal Code / Ordinance 1029 amendments for binding local rules, and confirm specifics with the Building Division for anything the generic template doesn't address.
  • Multi-family and all commercial projects require separate approval from the Frederick-Firestone Fire Protection District (303-833-2742) in addition to Town Building Division review.

Comparable nearby cities

Evans
Both in Weld County9 shared permit typesBoth on the 2018 International Mechanical Code (IMC)~17 mi away
Compare fees →
La Salle
Both in Weld County9 shared permit typesBoth on the 2018 International Mechanical Code (IMC)~18 mi away
Compare fees →
Keenesburg
Both in Weld County9 shared permit typesBoth on the 2018 International Plumbing Code (IPC)~20 mi away
Compare fees →