Residential Addition / Remodel Permit in Firestone, Colorado
Required for additions, basement finishes, and remodels involving structural changes in Firestone. Reviewed under the 2018 IRC as locally amended. Basement Finish/Remodel and Addition are both explicitly listed among the Town's permits requiring plan review.
Verified 2026-07-06 · Source
When you need this permit
- Basement Finish/Remodel and Addition are explicitly listed as requiring plan review on the Town's own fee schedule
- One-Story Addition, Basement Finish, and Detached Garage each have a dedicated Town Building Guide (2018 IRC-based, Colorado Chapter ICC template) covering plan submittal basics: smoke/CO alarm requirements, safety glazing at specified locations, heating in all habitable rooms, and electrical service capacity disclosure
- Window/Door Replacement requiring structural changes also requires plan review (versus the flat-fee non-structural window/door replacement permit)
- A plot/site plan showing dimensions, relationship to existing structures, and utility line locations (electric, gas, sewer, water) is required — Public Service Utility Notification Center of Colorado (1-800-922-1987) can locate underground utility lines
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (if new footings)
Before concrete pour; crawlspace/basement foundation detail per the Town's Building Guide (steel anchor bolts, rebar, vapor barrier)
- 2
Framing
Framing and connection to existing structure
- 3
Rough Electrical/Plumbing/Mechanical
Trade rough-ins before concealment
- 4
Final Inspection
All work complete per approved plans
See the full Firestone inspection guide — scheduling & re-inspection fees →
Tips
- Additions must not enclose existing bedroom or basement egress windows, per the Town's One-Story Addition Building Guide — confirm egress compliance before finalizing the addition footprint.
- Existing electric and gas meter locations should be identified early; additions sometimes require a meter relocation or an electric service upgrade — indicate your main breaker size on the plan so the reviewer can flag this before construction starts.
- Window/door replacement is a flat $132 fee if it involves 10 or fewer openings with no structural changes, but escalates to a full plan-review Addition/Remodel-type permit if structural changes are involved.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Firestone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Firestone
Residential Addition / Remodel Permit in other cities
Compare residential addition / remodel permit fees across Colorado →
Look up this fee in a different city →
Now live
Build your Firestone project checklist
Describe your project once and get every permit, document, and fee it triggers in Firestone — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →