Electrical Permit in Firestone, Colorado

Required for electrical modifications, service upgrades, and panel/meter work in Firestone. Governed by the 2023 NEC as locally adopted. Residential electrical permits are billed on a distinct area-based fee schedule; several standalone electrical items (temporary construction meter, service replacement, mobile home electrical set) carry flat fees.

Verified 2026-07-06 · Source

When you need this permit

  • Governed by the 2023 NEC as adopted by reference via Ordinance No. 1029
  • A plan review fee of 65% may be required for electrical permits, per the Electrical Permit Fee Table
  • Complex electrical systems (health-care facility circuits under NEC Article 517, installations over 1000V, or hazardous-classified locations) require a registered design professional's Electrical Observation with a signed Certificate of Compliance, per Ordinance No. 1029 Section 1704.7 — in addition to standard Building Division/SAFEbuilt inspections
  • Electrical fees are pegged to the US Dept of Labor consumer price index for Denver-Aurora-Lakewood and adjust annually per Colorado HB 19-1035

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential Electrical Permit — not more than 1,000 sq ftTown of Firestone Building Division Fee Schedule (REV 01.2025), verified against the rendered PDF page image
$141.20
Residential Electrical Permit — 1,001 to 1,500 sq ft
$211.80
Residential Electrical Permit — 1,501 to 2,000 sq ft
$282.40
Residential Electrical Permit — each additional 100 sq ft over 2,000 sq ft
$282.40 plus $14.12 per 100 sq ft
Temporary Construction Meter 100A-200A 1 Phase
$141.20
Electrical Service Replacement 100A-200A 1 Phase
$141.20
Electrical Mobile/Modular/Manufactured Home Set
$141.20
Solar Install Electrical Permit (residential)
Maximum $500
Reinspection Fee
$75.00 progressive (24-hour inspection delay)

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Firestone?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Wiring and panel installed before concealment

  2. 2

    Final Inspection

    Devices installed, panel labeled, system energized; performed by SAFEbuilt Colorado

See the full Firestone inspection guide — scheduling & re-inspection fees →

Tips

  • Firestone's residential electrical fee is area-based (tied to enclosed square footage), not valuation-based like the general Building Permit Fee Table — don't apply the valuation table to standalone electrical work.
  • Electrical fees adjust annually to the Denver-Aurora-Lakewood CPI under Colorado HB 19-1035 — confirm the current-year dollar figures with the Town before quoting a fee from a prior year's schedule.
  • Solar-related electrical work has its own fee cap ($500 residential / $1,000 commercial) distinct from the general residential electrical area-based table — see the solar-pv-permit entry.

Frequently asked questions

Firestone requires an electrical permit for: Governed by the 2023 NEC as adopted by reference via Ordinance No. 1029; A plan review fee of 65% may be required for electrical permits, per the Electrical Permit Fee Table; Complex electrical systems (health-care facility circuits under NEC Article 517, installations over 1000V, or hazardous-classified locations) require a registered design professional's Electrical Observation with a signed Certificate of Compliance, per Ordinance No. 1029 Section 1704.7 — in addition to standard Building Division/SAFEbuilt inspections; Electrical fees are pegged to the US Dept of Labor consumer price index for Denver-Aurora-Lakewood and adjust annually per Colorado HB 19-1035. If your project isn't listed, confirm with Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 303-833-3291 before starting work.

For a home with 1,000 sq ft or less of enclosed area, the residential electrical permit fee is $141.20, scaling to $282.40 for 1,501-2,000 sq ft, plus $14.12 per additional 100 sq ft above 2,000 sq ft.

Firestone does not publish a plan-review timeline for this permit. Contact Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 303-833-3291 for current turnaround.

You'll need: Electrical Permit Application (Online Portal). See the required-documents checklist on this page for details on each.

Firestone requires 2 inspection(s) for an electrical permit, in order: Rough Electrical, Final Inspection. Schedule each through Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) (303-833-3291).

Apply through Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 9950 Park Avenue, Firestone, CO 80504. Phone: 303-833-3291, email: building@firestoneco.gov. Office hours: Monday through Friday, 8 a.m. to 5 p.m. (Town Hall hours); SAFEbuilt Colorado's local office is at 11409 Business Park Circle, Suite 350, Firestone, CO 80504, phone 303-774-1388 (per SAFEbuilt's own site); Firestone-specific SAFEbuilt inspection contact: firestone-building@safebuilt.com / 303-774-0454, and Building Official Tim Moroney, tmoroney@safebuilt.com / 970-545-3555 (per SAFEbuilt/search-indexed contact listing — recommend confirming current staffing directly with the Town before publishing to end users, as this level of detail was not independently re-confirmed on a live SAFEbuilt staff-directory page during this extraction). Official information: https://www.firestoneco.gov/425/Building-Permits-Fees.

Firestone, Colorado has adopted: 2018 International Building Code (IBC), adopted by reference and locally amended as the 'Firestone Building and Construction Code' (FBCC) — Town of Firestone Building Guides page, https://firestoneco.gov/294/Building-Guides, and Ordinance No. 1029, https://firestoneco.gov/DocumentCenter/View/9387; 2018 International Residential Code (IRC), adopted by reference and locally amended; 2018 International Plumbing Code (IPC); 2018 International Mechanical Code (IMC); 2018 International Existing Building Code (IEBC); 2018 International Fuel Gas Code (IFGC); 2018 International Property Maintenance Code (IPMC); 2018 International Swimming Pool and Spa Code (ISPSC); 2018 International Energy Conservation Code (IECC); 2018 International Fire Code (IFC), per Ordinance No. 1029 chapter list (Chapter 15.32); 2023 National Electrical Code (NEC), adopted by reference per Ordinance No. 1029 (replacing the previously-adopted 2020 NEC); Ordinance No. 1029 (adopted following a June 21, 2023 public hearing) repealed and reenacted Firestone Municipal Code Chapters 15.04 (IBC), 15.06 (IRC), 15.08 (NEC), 15.10 (IEBC), 15.12 (IFGC), 15.14 (IMC), 15.16 (IPC), 15.18 (IPMC), 15.32 (IFC), 15.20 (ISPSC), and 15.36 (IECC) — source PDF, https://firestoneco.gov/DocumentCenter/View/9387/1029-AN-ORDINANCE-OF-THE-BOARD-OF-TRUSTEES-OF-THE-TOWN-OF-FIRESTONE-COLORADO. Local amendments apply — see the Firestone overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Firestone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.