Commercial Building Permit (New Construction / Additions) in Firestone, Colorado

Required for new commercial buildings and additions thereto in Firestone. Reviewed under the 2018 IBC as locally amended by Ordinance No. 1029 (the 'Firestone Building and Construction Code'), with the 2023 NEC for electrical scope. Firestone publishes a dedicated Commercial Permit Submittal Checklist (REV 03.25) distinct from residential submittals, and a separate 2026 Non-Residential Fees sheet covering water tap, impact, and use-tax charges layered on top of the standard valuation-based Building Permit Fee. All plans must be stamped by a Colorado Licensed Architect and Colorado Registered Engineers. Plan review/permit administration is by Town staff; inspections are performed by SAFEbuilt Colorado under contract.

Verified 2026-08-02 · Source

When you need this permit

  • All plans, specifications, and calculations must be stamped by their respective design professionals (Colorado Licensed Architect and Colorado Registered Engineers), per the Commercial Permit Submittal Checklist (REV 03.25)
  • All General, Mechanical, Plumbing, Electrical, and Sub-Contractors must be listed on the permit application AND licensed with the Town of Firestone as a condition of permit issuance
  • Total building valuation must be provided in addition to the total electrical valuation; detailed bids may be required if the Building Official deems valuations inaccurate for the proposed scope
  • Site-specific soils report required; structural design criteria must include ALL information required by 2018 IBC 1603 (wind speed/exposure, snow loads, seismic design category, soil-bearing data from a geotechnical engineer, etc.)
  • Civil package required: dimensioned site plans, grading and drainage plans, utility plans, and accessibility plans/details
  • Architectural code analysis required covering occupancy classification, construction type, sprinkler/fire alarm status, allowable height/stories/area, egress, accessibility (IBC Ch. 11), energy code compliance path, and life safety/egress plans per IBC 107.2.3
  • IECC compliance path documentation prepared by the designing Architect
  • Separate submittals must be made to the Frederick-Firestone Fire Protection District (Steve Iacino, Asst. Chief of Planning, 303-833-2742 / 720-526-6583) and St. Vrain Sanitation District (303-776-9570) — multi-family and all commercial projects require fire district approval
  • Sewer tap receipt from St. Vrain Sanitation required at time of permit submittal for new commercial; receipts from Little Thompson or Left Hand Water District required if the project is in those districts
  • Kitchen hoods, woodworking dust-collection systems, and spray/paint booths require additional engineered plans/shop drawings, with paint booth plans submitted to both the Fire Department and Building Department

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 6 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based)Building Division Fee Schedule (REV 01.2025); the 2026 Non-Residential Fees sheet explicitly defers building permit, plan review, electrical, construction meter, and backflow fees to this schedule. Final valuation is determined by square footage and average construction costs
$80 (valuation $1-$2,000) scaling by tier to $20,175 for the first $5,000,000 plus $3.50 per additional $1,000 or fraction thereof
Plan Review FeeRequired to be paid at time of submittal, per the 2026 Non-Residential Fees sheet
65% of the Building Permit Fee
Administration Fee: Commercial
$150.00
Commercial Electrical Permit FeeCPI-indexed annually (Denver-Aurora-Lakewood) per Colorado HB 19-1035
$141.20 (electrical valuation under $2,000); $141.20 plus $14.12 per $1,000 or fraction thereof at $2,001 and above
Footing/Foundation Permit (Commercial Projects Only)Optional early-start foundation permit; additional fees for full submittal will apply
$2,000.00
Use Tax2026 Non-Residential Fees sheet
2.6% of half the valuation total
Impact Fees (per 1,000 sq ft)Transportation + Municipal Facilities components, per the 2026 Non-Residential Fees sheet (1/1/2026)
$2,103.54 Industrial; $7,994.83 Commercial; $4,571.96 Office & Other Services; $4,378.21 Institutional
Water Tap (SVW)Plus meter fee, e.g. $713.77 (5/8") to $3,716.00 (2" commercial). For CWCWD fees email building@firestoneco.gov
$25,004.00 (5/8") to $200,032.00 (2"); 3" or larger as determined by Board of Trustees
Backflow Preventer / Commercial
$225.00
Temporary Certificate of Occupancy$400 of that fee is refunded if the final CO is issued prior to the TCO expiration date
$750.00
Reinspection Fee
$75.00 progressive (24-hour inspection delay)

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Building Permit (New Construction / Additions) permit actually take in Firestone?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing/Foundation

    Before concrete pour; commercial projects may optionally start under a standalone $2,000 Footing/Foundation Permit ahead of full permit issuance

  2. 2

    Framing/Structural

    Structural framing complete before cover, per approved stamped plans

  3. 3

    Rough Electrical/Plumbing/Mechanical

    Trade rough-ins before concealment; complex electrical/mechanical systems may additionally require a registered design professional's observation per Ordinance 1029 Sections 1704.7/1704.8

  4. 4

    Fire District Inspections

    Frederick-Firestone Fire Protection District performs its own inspections under its separate submittal/approval

  5. 5

    Final Inspection / Certificate of Occupancy

    All work complete per approved plans; performed by SAFEbuilt Colorado under contract to the Town. A Temporary CO is available for $750 ($400 refundable if the final CO issues before TCO expiration)

See the full Firestone inspection guide — scheduling & re-inspection fees →

Tips

  • Budget well beyond the building permit fee itself: new commercial projects also owe impact fees ($2,103.54-$7,994.83 per 1,000 sq ft depending on use category), use tax (2.6% of half the valuation), water tap and meter fees, and a $150 commercial administration fee.
  • Three separate submittals are required — Town Building Division, Frederick-Firestone Fire Protection District, and St. Vrain Sanitation District each have their own submittal requirements, and proof of sewer tap purchase must accompany the Town permit submittal.
  • Every contractor on the job (general and all subs) must be licensed with the Town of Firestone before the building permit will be issued — start contractor licensing early. Contractor
  • A commercial-only Footing/Foundation Permit ($2,000) lets sitework/foundations start ahead of the full permit, but additional fees for the full submittal still apply.
  • The 65% plan review fee is due at the time of submittal, not at issuance.
  • Incomplete submittals are rejected outright and reviews are strictly first-come-first-served, so a complete stamped package the first time is the fastest path through review.

Frequently asked questions

Firestone requires a commercial building permit (new construction / additions) for: All plans, specifications, and calculations must be stamped by their respective design professionals (Colorado Licensed Architect and Colorado Registered Engineers), per the Commercial Permit Submittal Checklist (REV 03.25); All General, Mechanical, Plumbing, Electrical, and Sub-Contractors must be listed on the permit application AND licensed with the Town of Firestone as a condition of permit issuance; Total building valuation must be provided in addition to the total electrical valuation; detailed bids may be required if the Building Official deems valuations inaccurate for the proposed scope; Site-specific soils report required; structural design criteria must include ALL information required by 2018 IBC 1603 (wind speed/exposure, snow loads, seismic design category, soil-bearing data from a geotechnical engineer, etc.); Civil package required: dimensioned site plans, grading and drainage plans, utility plans, and accessibility plans/details; Architectural code analysis required covering occupancy classification, construction type, sprinkler/fire alarm status, allowable height/stories/area, egress, accessibility (IBC Ch. 11), energy code compliance path, and life safety/egress plans per IBC 107.2.3; IECC compliance path documentation prepared by the designing Architect; Separate submittals must be made to the Frederick-Firestone Fire Protection District (Steve Iacino, Asst. Chief of Planning, 303-833-2742 / 720-526-6583) and St. Vrain Sanitation District (303-776-9570) — multi-family and all commercial projects require fire district approval; Sewer tap receipt from St. Vrain Sanitation required at time of permit submittal for new commercial; receipts from Little Thompson or Left Hand Water District required if the project is in those districts; Kitchen hoods, woodworking dust-collection systems, and spray/paint booths require additional engineered plans/shop drawings, with paint booth plans submitted to both the Fire Department and Building Department. If your project isn't listed, confirm with Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 303-833-3291 before starting work.

The building permit fee follows the Town's valuation-based table (e.g., $1,075 plus $6.50 per $1,000 above $100,000 for a project valued $100,001-$500,000), plus a plan review fee of 65% of the permit fee paid at submittal, a $150 commercial administration fee, a commercial electrical fee, use tax of 2.6% of half the valuation, and — for new buildings — impact fees per 1,000 sq ft and water tap fees.

The Town does not publish a numeric review timeline. Its Tenant Finish checklist states only that submittals are reviewed in the order received. Contact the Building Division (building@firestoneco.gov, 303-833-3291) for a current estimate.

You'll need: Building Permit Application (Online Portal); Commercial Permit Submittal Checklist package; Soils Report (Site Specific); Complete project manual(s); IECC compliance path documentation; Sewer tap receipt (St. Vrain Sanitation). Depending on your project, Firestone may also ask for: Water district receipt. See the required-documents checklist on this page for details on each.

Firestone requires 5 inspection(s) for a commercial building permit (new construction / additions), in order: Footing/Foundation, Framing/Structural, Rough Electrical/Plumbing/Mechanical, Fire District Inspections, Final Inspection / Certificate of Occupancy. Schedule each through Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) (303-833-3291).

Apply through Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 9950 Park Avenue, Firestone, CO 80504. Phone: 303-833-3291, email: building@firestoneco.gov. Office hours: Monday through Friday, 8 a.m. to 5 p.m. (Town Hall hours); SAFEbuilt Colorado's local office is at 11409 Business Park Circle, Suite 350, Firestone, CO 80504, phone 303-774-1388 (per SAFEbuilt's own site); Firestone-specific SAFEbuilt inspection contact: firestone-building@safebuilt.com / 303-774-0454, and Building Official Tim Moroney, tmoroney@safebuilt.com / 970-545-3555 (per SAFEbuilt/search-indexed contact listing — recommend confirming current staffing directly with the Town before publishing to end users, as this level of detail was not independently re-confirmed on a live SAFEbuilt staff-directory page during this extraction). Official information: https://www.firestoneco.gov/425/Building-Permits-Fees.

Firestone, Colorado has adopted: 2018 International Building Code (IBC), adopted by reference and locally amended as the 'Firestone Building and Construction Code' (FBCC) — Town of Firestone Building Guides page, https://firestoneco.gov/294/Building-Guides, and Ordinance No. 1029, https://firestoneco.gov/DocumentCenter/View/9387; 2018 International Residential Code (IRC), adopted by reference and locally amended; 2018 International Plumbing Code (IPC); 2018 International Mechanical Code (IMC); 2018 International Existing Building Code (IEBC); 2018 International Fuel Gas Code (IFGC); 2018 International Property Maintenance Code (IPMC); 2018 International Swimming Pool and Spa Code (ISPSC); 2018 International Energy Conservation Code (IECC); 2018 International Fire Code (IFC), per Ordinance No. 1029 chapter list (Chapter 15.32); 2023 National Electrical Code (NEC), adopted by reference per Ordinance No. 1029 (replacing the previously-adopted 2020 NEC); Ordinance No. 1029 (adopted following a June 21, 2023 public hearing) repealed and reenacted Firestone Municipal Code Chapters 15.04 (IBC), 15.06 (IRC), 15.08 (NEC), 15.10 (IEBC), 15.12 (IFGC), 15.14 (IMC), 15.16 (IPC), 15.18 (IPMC), 15.32 (IFC), 15.20 (ISPSC), and 15.36 (IECC) — source PDF, https://firestoneco.gov/DocumentCenter/View/9387/1029-AN-ORDINANCE-OF-THE-BOARD-OF-TRUSTEES-OF-THE-TOWN-OF-FIRESTONE-COLORADO. Local amendments apply — see the Firestone overview page for the full list.

Yes. Firestone publishes a dedicated Commercial Permit Submittal Checklist (REV 03.25) for new commercial buildings and additions, requiring stamped plans from a Colorado Licensed Architect and Colorado Registered Engineers, a site-specific soils report, full civil/structural/architectural/MEP packages, and separate submittals to the Frederick-Firestone Fire Protection District and St. Vrain Sanitation District.

Sources & verification

Verified against official sources. Last reviewed 2026-08-02.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Firestone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Firestone.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.