Demolition Permit in Firestone, Colorado

Required for residential demolition in Firestone, listed as a distinct flat-fee permit item on the Town's Building Division Fee Schedule.

Verified 2026-07-06 · Source

When you need this permit

  • Residential Demolition Permit is a distinct flat-fee line item on the Town's Building Division Fee Schedule
  • No demolition-specific plan-review requirement was found published beyond the standard permit application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Residential Demolition PermitTown of Firestone Building Division Fee Schedule (REV 01.2025)
$132.00

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Firestone?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection

    Site cleared and utilities properly capped/disconnected; performed by SAFEbuilt Colorado

See the full Firestone inspection guide — scheduling & re-inspection fees →

Tips

  • Residential demolition in Firestone is a flat $132.00 fee, distinct from the valuation-based general Building Permit Fee Table.

Frequently asked questions

Firestone requires a demolition permit for: Residential Demolition Permit is a distinct flat-fee line item on the Town's Building Division Fee Schedule; No demolition-specific plan-review requirement was found published beyond the standard permit application. If your project isn't listed, confirm with Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 303-833-3291 before starting work.

$132.00, per the Town's Building Division Fee Schedule.

Firestone does not publish a plan-review timeline for this permit. Contact Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 303-833-3291 for current turnaround.

You'll need: Demolition Permit Application (Online Portal). See the required-documents checklist on this page for details on each.

Firestone requires 1 inspection(s) for a demolition permit, in order: Final Inspection. Schedule each through Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) (303-833-3291).

Apply through Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 9950 Park Avenue, Firestone, CO 80504. Phone: 303-833-3291, email: building@firestoneco.gov. Office hours: Monday through Friday, 8 a.m. to 5 p.m. (Town Hall hours). SAFEbuilt Colorado's local office is at 11409 Business Park Circle, Suite 350, Firestone, CO 80504, phone 303-774-1388, per SAFEbuilt's own site. Firestone-specific SAFEbuilt inspection contact: firestone-building@safebuilt.com / 303-774-0454, and Building Official Tim Moroney, tmoroney@safebuilt.com / 970-545-3555. That staffing detail comes from a SAFEbuilt contact listing rather than a live staff directory, so confirm current staffing with the Town before relying on a named contact.. Official information: https://www.firestoneco.gov/425/Building-Permits-Fees.

Firestone, Colorado has adopted: 2018 International Building Code (IBC), adopted by reference and locally amended as the 'Firestone Building and Construction Code' (FBCC) — Town of Firestone Building Guides page, https://firestoneco.gov/294/Building-Guides, and Ordinance No. 1029, https://firestoneco.gov/DocumentCenter/View/9387; 2018 International Residential Code (IRC), adopted by reference and locally amended; 2018 International Plumbing Code (IPC); 2018 International Mechanical Code (IMC); 2018 International Existing Building Code (IEBC); 2018 International Fuel Gas Code (IFGC); 2018 International Property Maintenance Code (IPMC); 2018 International Swimming Pool and Spa Code (ISPSC); 2018 International Energy Conservation Code (IECC); 2018 International Fire Code (IFC), per Ordinance No. 1029 chapter list (Chapter 15.32); 2023 National Electrical Code (NEC), adopted by reference per Ordinance No. 1029 (replacing the previously-adopted 2020 NEC); Ordinance No. 1029 (adopted following a June 21, 2023 public hearing) repealed and reenacted Firestone Municipal Code Chapters 15.04 (IBC), 15.06 (IRC), 15.08 (NEC), 15.10 (IEBC), 15.12 (IFGC), 15.14 (IMC), 15.16 (IPC), 15.18 (IPMC), 15.32 (IFC), 15.20 (ISPSC), and 15.36 (IECC) — source PDF, https://firestoneco.gov/DocumentCenter/View/9387/1029-AN-ORDINANCE-OF-THE-BOARD-OF-TRUSTEES-OF-THE-TOWN-OF-FIRESTONE-COLORADO. Local amendments apply — see the Firestone overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Firestone building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Firestone's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Firestone yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Firestone lands. Privacy.