Change of Use / Change of Occupancy Permit in Firestone, Colorado

Firestone has no standalone 'change of use permit' application, fee, or numeric review timeline distinct from its general Commercial Building Permit / Commercial Tenant Finish process -- confirmed by directly reading the Town's own Firestone Development Code (February 2025) in full this session, which formally defines 'Change of Use' (Section 16.11.3, Definitions) as changing a building's or land's occupancy to a different permitted use, and treats it as a TRIGGER for other standards (Section 6.4 landscaping compliance, Section 6.6 off-street parking planning) rather than as a distinct permit type of its own. On the Town Building Division side, a change of use is processed through the same Commercial Building Permit or Commercial Tenant Finish Permit application already documented in this file (whose own submittal checklist calls for a change-of-occupancy analysis only if applicable). Separately, FFFPD's own 2026 Fee Schedule explicitly names 'change of use' as one of the building modifications requiring its own Building Construction Permit, and St. Vrain Sanitation District separately reviews any change of occupancy that affects wastewater demand. This is a genuinely confirmed gap after directly reading the Development Code and FFFPD's fee schedule, not an unexamined assumption -- carries 'partial' confidence because it remains unclear from the Town's published materials whether a construction-free change of use (no accompanying trade work) still requires a full Building-Permit-fee submittal purely for occupancy sign-off.

Reviewed 2026-08-13 · Source

When you need this permit

  • Firestone's own Development Code formally defines 'Change of Use' (Section 16.11.3, Definitions): the act of changing the occupancy of a building or land from a use specifically listed as a 'Permitted Use,' covering (a) a single-tenant building's or parcel's occupancy changing from its most recent use to a different one, (b) a tenant space in a multi-tenant building changing to a use not currently existing (or not existing within the last 12 months) elsewhere in the building, or (c) reestablishing or changing use after a 12-consecutive-month abandonment of the prior use
  • FDC Section 16.6.4(B)(3) (Landscaping) lists 'any change of use from one primary use classification to another (for example, residential use to commercial use)' as one of three triggers -- alongside additions and floor-area/story increases -- that require compliance with the Town's landscaping standards (Section 6.4)
  • FDC Section 16.6.6 (Off-Street Parking) separately flags that development with approvals permitting a future change of use requiring additional parking must reserve undeveloped on-site area to accommodate those future parking needs
  • No standalone Town of Firestone 'change of use permit' application, fee, or numeric review timeline is published on the Building Permits & Fees page, Building Submittal Requirements page, Building Guides page, the Development Code itself, or the Building Division Fee Schedule (REV 01.2025) -- checked all directly; a change of use is instead processed through the same Commercial Building Permit or Commercial Tenant Finish Permit application already documented in this file, whose own checklist requires a change-of-occupancy analysis only if the project changes the occupancy classification
  • FFFPD's own 2026 Fee Schedule explicitly names 'change of use' as one of the building modifications (alongside new building construction, remodel, and tenant finish) requiring its own separate Building Construction Permit -- billed at 0.0018 times the project valuation with a $300.00 minimum fee (fire alarm/sprinkler system valuations may be subtracted from the total project valuation); this FFFPD-side permit is separate from, and in addition to, both the Town's own Building Division review and FFFPD's own fire-protection-system-specific permit (this file's fire-sprinkler-alarm-permit entry)
  • Saint Vrain Sanitation District separately reviews plans for any 'expansions or change of occupancy that affects the demand for wastewater services,' per the Town's own Taxes, Licensing & Permitting page -- a third, independent review layer distinct from both the Town Building Division and FFFPD
  • FFFPD's own fee schedule explicitly states its building construction permits are NOT required to construct, remodel, or renovate one- or two-family homes or townhomes -- so the FFFPD-side change-of-use fee applies to commercial/multi-family change-of-use projects, not residential ones

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (valuation-based, same table as commercial-building-permit/commercial-tenant-improvement-permit, if construction accompanies the use change)No distinct change-of-use fee line exists on the Town's Building Division Fee Schedule (REV 01.2025); billed under the same valuation table as other building/tenant-finish permits
$80 minimum, scaling per tier
Plan Review Fee
65% of the Building Permit Fee
Administration Fee: Commercial
$150.00
FFFPD Building Construction Permit FeeFrederick-Firestone Fire Protection District 2026 Fee Schedule; billed separately from, and in addition to, the Town's own fees, and separate from FFFPD's own fire-protection-system-specific permit fee (this file's fire-sprinkler-alarm-permit entry)
0.0018 x project valuation, $300.00 minimum (fire alarm/sprinkler system valuations may be subtracted from the total)
Temporary Certificate of OccupancySame fee already documented elsewhere in this file
$750.00 ($400 refunded if the final CO is issued prior to the TCO expiration date)

Review timeline

Plan review
Not published — contact the department

How long did your Change of Use / Change of Occupancy Permit permit actually take in Firestone?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Inspection / Certificate of Occupancy

    Same final-inspection process as the underlying Commercial Building Permit or Commercial Tenant Finish Permit; performed by SAFEbuilt Colorado under contract to the Town. A Certificate of Occupancy or Temporary CO is issued once the approved change of use is inspected and confirmed

See the full Firestone inspection guide — scheduling & re-inspection fees →

Tips

  • Firestone has no separate 'change of use permit' by that name -- its own Development Code formally defines the term but treats it as a trigger for other standards (landscaping, parking) and folds the building-permit-side process into the existing Commercial Building Permit / Commercial Tenant Finish Permit tracks already documented in this file.
  • A change of use can trigger three separate reviews beyond the Town's own Building Division: FFFPD's own Building Construction Permit (0.0018 x valuation, $300 min), St. Vrain Sanitation District (if wastewater demand changes), and -- if the new use itself involves fire-alarm/sprinkler work -- FFFPD's separate fire-protection-system permit (0.03 x project value, $300 min; this file's fire-sprinkler-alarm-permit entry). Budget for the possibility of all three on top of the Town's own fees.
  • If the change of use involves no construction or trade work at all, it is unclear from the Town's published materials whether a full Building-Permit-fee submittal is still required purely for occupancy sign-off -- confirm directly with the Building Division (building@firestoneco.gov, 303-833-3291) for a construction-free change of use.

Frequently asked questions

Firestone requires a change of use / change of occupancy permit for: Firestone's own Development Code formally defines 'Change of Use' (Section 16.11.3, Definitions): the act of changing the occupancy of a building or land from a use specifically listed as a 'Permitted Use,' covering (a) a single-tenant building's or parcel's occupancy changing from its most recent use to a different one, (b) a tenant space in a multi-tenant building changing to a use not currently existing (or not existing within the last 12 months) elsewhere in the building, or (c) reestablishing or changing use after a 12-consecutive-month abandonment of the prior use; FDC Section 16.6.4(B)(3) (Landscaping) lists 'any change of use from one primary use classification to another (for example, residential use to commercial use)' as one of three triggers -- alongside additions and floor-area/story increases -- that require compliance with the Town's landscaping standards (Section 6.4); FDC Section 16.6.6 (Off-Street Parking) separately flags that development with approvals permitting a future change of use requiring additional parking must reserve undeveloped on-site area to accommodate those future parking needs; No standalone Town of Firestone 'change of use permit' application, fee, or numeric review timeline is published on the Building Permits & Fees page, Building Submittal Requirements page, Building Guides page, the Development Code itself, or the Building Division Fee Schedule (REV 01.2025) -- checked all directly; a change of use is instead processed through the same Commercial Building Permit or Commercial Tenant Finish Permit application already documented in this file, whose own checklist requires a change-of-occupancy analysis only if the project changes the occupancy classification; FFFPD's own 2026 Fee Schedule explicitly names 'change of use' as one of the building modifications (alongside new building construction, remodel, and tenant finish) requiring its own separate Building Construction Permit -- billed at 0.0018 times the project valuation with a $300.00 minimum fee (fire alarm/sprinkler system valuations may be subtracted from the total project valuation); this FFFPD-side permit is separate from, and in addition to, both the Town's own Building Division review and FFFPD's own fire-protection-system-specific permit (this file's fire-sprinkler-alarm-permit entry); Saint Vrain Sanitation District separately reviews plans for any 'expansions or change of occupancy that affects the demand for wastewater services,' per the Town's own Taxes, Licensing & Permitting page -- a third, independent review layer distinct from both the Town Building Division and FFFPD; FFFPD's own fee schedule explicitly states its building construction permits are NOT required to construct, remodel, or renovate one- or two-family homes or townhomes -- so the FFFPD-side change-of-use fee applies to commercial/multi-family change-of-use projects, not residential ones. If your project isn't listed, confirm with Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 303-833-3291 before starting work.

The same fees as the underlying Commercial Building Permit or Commercial Tenant Finish Permit, plus a separate Frederick-Firestone Fire Protection District Building Construction Permit fee (0.0018 times the project valuation, $300.00 minimum) -- the Town's own materials do not publish a standalone change-of-use fee, but FFFPD's own 2026 Fee Schedule confirms change of use as one of the building-modification types billed under its 0.0018 formula.

Firestone does not publish a plan-review timeline for this permit. Contact Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 303-833-3291 for current turnaround.

You'll need: Building Permit Application (Commercial Building Permit or Commercial Tenant Finish Permit, Online Portal). Depending on your project, Firestone may also ask for: FFFPD Application for Plan Review; St. Vrain Sanitation District Review. See the required-documents checklist on this page for details on each.

Firestone requires 1 inspection(s) for a change of use / change of occupancy permit, in order: Final Inspection / Certificate of Occupancy. Schedule each through Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) (303-833-3291).

Apply through Town of Firestone Building Division (plan review/permit administration by Town staff; building inspections contracted to SAFEbuilt Colorado) at 9950 Park Avenue, Firestone, CO 80504. Phone: 303-833-3291, email: building@firestoneco.gov. Office hours: Monday through Friday, 8 a.m. to 5 p.m. (Town Hall hours); SAFEbuilt Colorado's local office is at 11409 Business Park Circle, Suite 350, Firestone, CO 80504, phone 303-774-1388 (per SAFEbuilt's own site); Firestone-specific SAFEbuilt inspection contact: firestone-building@safebuilt.com / 303-774-0454, and Building Official Tim Moroney, tmoroney@safebuilt.com / 970-545-3555 (per SAFEbuilt/search-indexed contact listing — recommend confirming current staffing directly with the Town before publishing to end users, as this level of detail was not independently re-confirmed on a live SAFEbuilt staff-directory page during this extraction). Official information: https://www.firestoneco.gov/425/Building-Permits-Fees.

Firestone, Colorado has adopted: 2018 International Building Code (IBC), adopted by reference and locally amended as the 'Firestone Building and Construction Code' (FBCC) — Town of Firestone Building Guides page, https://firestoneco.gov/294/Building-Guides, and Ordinance No. 1029, https://firestoneco.gov/DocumentCenter/View/9387; 2018 International Residential Code (IRC), adopted by reference and locally amended; 2018 International Plumbing Code (IPC); 2018 International Mechanical Code (IMC); 2018 International Existing Building Code (IEBC); 2018 International Fuel Gas Code (IFGC); 2018 International Property Maintenance Code (IPMC); 2018 International Swimming Pool and Spa Code (ISPSC); 2018 International Energy Conservation Code (IECC); 2018 International Fire Code (IFC), per Ordinance No. 1029 chapter list (Chapter 15.32); 2023 National Electrical Code (NEC), adopted by reference per Ordinance No. 1029 (replacing the previously-adopted 2020 NEC); Ordinance No. 1029 (adopted following a June 21, 2023 public hearing) repealed and reenacted Firestone Municipal Code Chapters 15.04 (IBC), 15.06 (IRC), 15.08 (NEC), 15.10 (IEBC), 15.12 (IFGC), 15.14 (IMC), 15.16 (IPC), 15.18 (IPMC), 15.32 (IFC), 15.20 (ISPSC), and 15.36 (IECC) — source PDF, https://firestoneco.gov/DocumentCenter/View/9387/1029-AN-ORDINANCE-OF-THE-BOARD-OF-TRUSTEES-OF-THE-TOWN-OF-FIRESTONE-COLORADO. Local amendments apply — see the Firestone overview page for the full list.

No standalone Town permit exists by that name. Firestone's own Development Code formally defines 'Change of Use' as a trigger for other standards (landscaping compliance, parking planning), and the building-permit-side process runs through the same Commercial Building Permit or Commercial Tenant Finish Permit application used for other commercial projects, with a change-of-occupancy analysis included only if the use classification is changing.