This is PermitBase’s published record for Holyoke as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Holyoke building permits
Holyoke, Colorado — as published 2026-07-06.
Reviewed 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family residential construction within Holyoke city limits, issued by the City of Holyoke Building Department using its general Building Permit Application. No specific adopted code edition is published by the city; the department appears to review plans against generic IRC-based 'Building Guide' templates published by the Colorado Chapter ICC rather than a cited current-cycle code adoption.
Reviewed 2026-07-06 · Source
Requirements
- Completed City of Holyoke Building Permit Application, including owner, contractor, and (if applicable) architect information
- Class of Work (New/Addition/Alteration/Repair/Move/Demo) and Type of Work (Residential/Commercial) specified on the application
- Building dimensions (width x length, total square feet), number of stories, and whether plans are available must be indicated
- Flood Plain Area status must be disclosed on the application (Yes/No checkbox)
- Material Cost, Labor Cost, and Total Cost must be disclosed for permit fee and use tax calculation
- For a genuinely new residence, standalone electrical/plumbing/mechanical permits are not required separately per the application's notice text (they may be covered under the umbrella building permit); this exception does NOT apply to additions, alterations, or repairs
- Permit becomes null and void if work is not commenced within 180 days of issuance, or is suspended/abandoned for 180 days after commencement
Required documents
- RequiredCity of Holyoke Building Permit Application2020 version PDF, available in the Building Department Applications section of the city's Forms & Documents page
- RequiredSite/floor plansThe city's Colorado Chapter ICC 'Building Guide' templates (for additions specifically) call for two sets of scaled site plans and two sets of scaled floor plans; the general Building Permit Application itself does not enumerate a plan-set requirement beyond checking 'Plans Available: Yes/No', so submittal depth for full new construction should be confirmed directly with the Building Department
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | No fee schedule (valuation table, flat rate, or square-footage rate) is published anywhere on the City of Holyoke website or in its downloadable applications; the Building Permit Application's 'For Official Use Only' section is filled in by city staff at issuance rather than computed from a public rate table. Confirm current fee directly with the Building Department (970-854-2266). | |
| Use Tax | A separate Use Tax line appears on the official permit form, confirming a municipal use tax applies to permitted construction, but no rate or formula is published. |
Residential Addition / Remodel Permit
Required for additions, alterations, and repairs to existing residential structures in Holyoke. Unlike new-residence construction, additions and remodels always require standalone electrical/plumbing/mechanical permits where applicable, per the city's own Building Permit Application notice.
Reviewed 2026-07-06 · Source
Requirements
- Completed City of Holyoke Building Permit Application with Class of Work marked 'Addition,' 'Alteration,' or 'Repair'
- Building dimensions and total added/altered square footage disclosed
- Change of Use From/To fields completed if the project changes the use of the structure
- Separate electrical, plumbing, and/or mechanical permits required if the scope touches those trades (the new-residence exception does not apply)
- For additions specifically, the city's Colorado Chapter ICC 'Addition to a Family Residence' Building Guide calls for two sets of scaled site plans and two sets of scaled floor/framing plans, foundation detail selection (engineer-designed or the guide's prescriptive 'Detail A'), smoke alarm interconnection in new and existing bedrooms/hallways, and confirmation that the addition does not block bedroom or basement egress windows
Required documents
- RequiredCity of Holyoke Building Permit Application2020 version PDF
- OptionalAddition to a Family Residence Building Guide (fill-in-the-blank worksheet)Colorado Chapter ICC template (bilingual English/Spanish, dated 8/30/03) covering foundation, framing, insulation, and site-plan requirements for residential additions; available in English and Spanish on the city's Forms & Documents page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | No published fee schedule; calculated by city staff at issuance based on Material/Labor/Total Cost disclosed on the application | |
| Use Tax | Applies per the official permit form's fee block; no published rate |
Electrical Permit
Required for wiring/electrical installation, alteration, or repair in Holyoke. Based on Colorado DORA's official published list of counties that have opted out of state electrical inspection (which does NOT include Phillips County) and the absence of any evidence that Holyoke independently runs its own certified local electrical inspection program, this permit type is treated as issued by the Colorado State Electrical Board (DORA) rather than the City of Holyoke Building Department, though the city's own Forms & Documents page lists 'wiring' among the permit types it administers, creating some ambiguity this file flags rather than resolves by assumption.
Reviewed 2026-07-06 · Source
Requirements
- Per DORA's official FAQ (dora.state.co.us), Phillips County does not appear on the list of counties with their own electrical inspection programs, meaning the State issues electrical permits within Phillips County (including Holyoke) by default, unless Holyoke itself runs an independent local program not reflected in the state's county-level list
- No Holyoke-specific electrical inspection program, licensing requirement, or fee schedule was found published on the city's website; the city's Electric Department page describes only its municipal electric power utility (established 1909), not a permitting/inspection function
- State-issued electrical permits require either a Colorado-licensed Electrical Contractor or a homeowner performing work on their own owner-occupied, non-rental property (per DORA's general permit rules, limited to one property per 24-month period for homeowners)
- State electrical permit purchase and inspection requests are handled online via the DORA Electrical and Plumbing Permits portal (dora.state.co.us/pls/real/ep_web.logon)
Required documents
- RequiredState of Colorado Electrical Permit (DORA)Purchased online via the DORA Electrical and Plumbing Permits portal, or by a registered Electrical Contractor
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State Electrical Permit Fee | Not verified in this research pass; DORA's fee schedule is set by the State Electrical Board (3 CCR 710-1) and was not independently re-derived here. The city's own Forms & Documents page does not publish an electrical permit fee, consistent with the state (not city) issuing this permit type. |
Plumbing Permit
Required for plumbing installation, alteration, or repair in Holyoke. As with electrical permits, Phillips County does not appear on DORA's published list of counties with their own local plumbing inspection program, so this permit type is treated as State-issued (Colorado State Plumbing Board, DORA) absent evidence of an independent Holyoke municipal program, though the city's Forms & Documents page lists 'plumbing' among its administered permit types.
Reviewed 2026-07-06 · Source
Requirements
- Per DORA's official FAQ, Phillips County does not appear on the list of counties with their own plumbing inspection programs, meaning the State issues plumbing permits within Phillips County (including Holyoke) by default absent a Holyoke-specific local program
- No Holyoke-specific plumbing inspection program, licensing requirement, or fee schedule was found published anywhere on the city's website
- State plumbing permits require either a Colorado-licensed Plumbing Contractor or, for certain non-licensed-required installations (e.g., gas pipe, mobile home connections), other qualifying applicants per DORA's general rules
- Manufactured/Modular/Mobile home water, sewer, and gas connections require a permit and inspection under Colorado plumbing statute, per DORA's FAQ
Required documents
- RequiredState of Colorado Plumbing Permit (DORA)Purchased online via the DORA Electrical and Plumbing Permits portal, or by a registered Plumbing Contractor
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| State Plumbing Permit Fee | Not independently re-derived in this research pass; set by the State Plumbing Board. Not published on the City of Holyoke's site. |
Mechanical / Sheet Metal (HVAC) Permit
Required for heating, ventilating, and air conditioning equipment installation or replacement in Holyoke, referred to on the city's Forms & Documents page as a 'sheet metal' permit. No evidence was found of a separate state deferral for mechanical/HVAC work (unlike electrical and plumbing, mechanical permitting in Colorado is not centralized through a DORA state board), so this permit type is treated as issued by the City of Holyoke Building Department.
Reviewed 2026-07-06 · Source
Requirements
- Completed City of Holyoke Building Permit Application with the mechanical/HVAC scope described
- Separate mechanical permit required except where the umbrella new-residence exception applies (new single-family construction only)
- No specific adopted mechanical code edition (e.g., a specific IMC year) is published by the city
Required documents
- RequiredCity of Holyoke Building Permit ApplicationUsed for mechanical/sheet metal permits per the city's Forms & Documents page listing
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee | No published fee schedule; calculated by city staff at issuance |
Re-siding / Re-roofing / Soffit Permit
VerifiedRequired for re-roofing, re-siding, and soffit replacement work in Holyoke, using the city's own dedicated 2020 Re-siding/Re-roofing/Soffit Permit Application — a distinct standalone form from the general Building Permit Application, unlike many peer jurisdictions in this corpus that fold re-roofs into the general building-permit process.
Verified 2026-07-06 · Source
Requirements
- Completed Re-siding/Re-roofing/Soffit Permit Application specifying roof type (shingles, shakes, built-up, metal, tile, other) and/or siding type (wood, vinyl, metal, soffit, brick, other)
- Contractor license Class, Number, and Expiration date must be disclosed on the application
- Number of layers must be disclosed if roofing material is being overlaid rather than fully torn off
- Material Cost, Labor Cost, and Total Cost disclosed for permit fee and use tax calculation
- Permit becomes null and void if work is not commenced within 180 days or is suspended/abandoned for 180 days after commencement
Required documents
- RequiredCity of Holyoke Re-siding/Re-roofing/Soffit Permit Application2020 version PDF, available on the city's Forms & Documents page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-roof/Re-siding Permit Fee | No published fee schedule; the application's 'For Official Use Only' block (Permit Fee, Use Tax, Total) is completed by city staff at issuance rather than computed from a public rate table | |
| Use Tax | Separate line item on the official application form; no published rate |
Deck / Patio Cover / Enclosed Patio Permit
Required for uncovered decks, patio covers/carports, and enclosing existing patios in Holyoke. The city publishes three distinct Colorado Chapter ICC 'Building Guide' fill-in-the-blank worksheets for these scopes (Uncovered Decks, Patio Covers & Carports, Enclosing a Patio), used alongside the general Building Permit Application.
Reviewed 2026-07-06 · Source
Requirements
- Completed City of Holyoke Building Permit Application with Class of Work marked appropriately (typically 'New' or 'Addition')
- For uncovered decks: guardrail height, baluster spacing, footing depth/size, and beam/joist sizing per the city's Uncovered Decks Building Guide worksheet
- For patio covers/carports: post spacing, beam and rafter sizing, and attachment-to-existing-structure details per the Patio Covers & Carport Building Guide worksheet
- For enclosing an existing patio: window/door egress and safety glazing requirements, insulation values, and structural connection details per the Enclosing a Patio Building Guide worksheet
- Two sets of scaled site plans and two sets of scaled construction plans, per the general instructions printed on each Building Guide worksheet
Required documents
- RequiredCity of Holyoke Building Permit ApplicationGeneral application used for deck/patio cover/enclosure permits
- OptionalUncovered Decks / Patio Covers & Carport / Enclosing a Patio Building Guide worksheetColorado Chapter ICC fill-in-the-blank template matching the specific scope (deck, patio cover/carport, or patio enclosure); available bilingually for some scopes on the city's Forms & Documents page
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | No published fee schedule; calculated by city staff at issuance |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holyoke building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.